9,406 research outputs found

    Operations research in passenger railway transportation

    Get PDF
    In this paper, we give an overview of state-of-the-art OperationsResearch models and techniques used in passenger railwaytransportation. For each planning phase (strategic, tactical andoperational), we describe the planning problems arising there anddiscuss some models and algorithms to solve them. We do not onlyconsider classical, well-known topics such as timetabling, rollingstock scheduling and crew scheduling, but we also discuss somerecently developed topics as shunting and reliability oftimetables.Finally, we focus on several practical aspects for each of theseproblems at the largest Dutch railway operator, NS Reizigers.passenger railway transportation;operation research;planning problems

    Train schedule coordination at an interchange station through agent negotiation

    Get PDF
    In open railway markets, coordinating train schedules at an interchange station requires negotiation between two independent train operating companies to resolve their operational conflicts. This paper models the stakeholders as software agents and proposes an agent negotiation model to study their interaction. Three negotiation strategies have been devised to represent the possible objectives of the stakeholders, and they determine the behavior in proposing offers to the proponent. Empirical simulation results confirm that the use of the proposed negotiation strategies lead to outcomes that are consistent with the objectives of the stakeholders

    Commercialising Australia's interstate rail freight transport: Some ownership and investment issues

    Get PDF
    The paper addresses the issues of rights of way ownership and application of consistent investment appraisal techniques across modes of transport. There are linkages between ownership, rights of way, competitive strategies and market contestability which will have a significant bearing on the choice of investment criteria used by commercialised railways. Investment methodologies in competing modes of land transport must be consistent. Investment in individual elements of railway infrastructure must be integrated with the overall cost recovery strategy of the operator. Major railway projects must be submitted to both financial and economic evaluation, so that the interests of individual railway authorities and the community are considered

    The new Dutch timetable: The OR revolution

    Get PDF
    In December 2006, Netherlands Railways introduced a completely new timetable. Its objective was to facilitate the growth of passenger and freight transport on a highly utilized railway network, and improve the robustness of the timetable resulting in less train delays in the operation. Further adjusting the existing timetable constructed in 1970 was not option anymore, because further growth would then require significant investments in the rail infrastructure. Constructing a railway timetable from scratch for about 5,500 daily trains was a complex problem. To support this process, we generated several timetables using sophisticated operations research techniques, and finally selected and implemented one of these timetables. Furthermore, because rolling-stock and crew costs are principal components of the cost of a passenger railway operator, we used innovative operations research tools to devise efficient schedules for these two resources. The new resource schedules and the increased number of passengers resulted in an additional annual profit of 40 million euros (60million)ofwhichabout10millioneuroswerecreatedbyadditionalrevenues.Weexpectthistoincreaseto70millioneuros(60 million) of which about 10 million euros were created by additional revenues. We expect this to increase to 70 million euros (105 million) annually in the coming years. However, the benefits of the new timetable for the Dutch society as a whole are much greater: more trains are transporting more passengers on the same railway infrastructure, and these trains are arriving and departing on schedule more than they ever have in the past. In addition, the rail transport system will be able to handle future transportation demand growth and thus allow cities to remain accessible. Therefore, people can switch from car transport to rail transport, which will reduce the emission of greenhouse gases.

    Asset Identification Under the Cape Town Convention and Protocols

    Get PDF
    A titania-supported nickel catalyst was prepared and tested in methanation in order to evaluate its catalytic properties (activity, selectivity and specially, activity loss), and compare it with an alumina-supported nickel catalyst. The titania-supported catalyst did not only show higher stability than alumina, but also presented a different cause of deactivation, carbon formation. In addition, a kinetic model was obtained for the titania-supported catalyst, and a study of the effect of different operating conditions (temperature, composition and partial pressures of synthesis gas and water) on the deactivation rate and carbon formation of this catalyst was performed. </p

    Re-scheduling in railways: the rolling stock balancing problem

    Get PDF
    This paper addresses the Rolling Stock Balancing Problem (RSBP). This problem arises at a passenger railway operator when the rolling stock has to be re-scheduled due to changing circumstances. These problems arise both in the planning process and during operations. The RSBP has as input a timetable and a rolling stock schedule where the allocation of the rolling stock among the stations does not fit to the allocation before and after the planning period. The problem is then to correct these off-balances, leading to a modified schedule that can be implemented in practice.For practical usage of solution approaches for the RSBP, it is important to solve the problem quickly. Therefore, the focus is on heuristic approaches. In this paper, we describe two heuristics and compare them with each other on some (variants of) real-life instances of NS, the main Dutch passenger railway operator. Finally, to get some insight in the quality of the proposed heuristics, we also compare their outcomes with optimal solutions obtained by solving existing rolling stock circulation models.heuristics;railway planning;integer linear programming;rolling stock re-scheduling

    Stochastic Improvement of Cyclic Railway Timetables

    Get PDF
    Real-time railway operations are subject to stochastic disturbances. However, a railway timetable is a deterministic plan. Thus a timetable should be designed in such a way that it can cope with the stochastic disturbances as well as possible. For that purpose, a timetable usually contains time supplements in several process times and buffer times between pairs of consecutive trains. This paper describes a Stochastic Optimization Model that can be used to allocate the time supplements and the buffer times in a given timetable in such a way that the timetable becomes maximally robust against stochastic disturbances. The Stochastic Optimization Model was tested on several instances of NS Reizigers, the main operator of passenger trains in the Netherlands. Moreover, a timetable that was computed by the model was operated in practice in a timetable experiment on the so-called “Zaanlijnâ€. The results show that the average delays of trains can often be reduced significantly by applying relatively small modifications to a given timetable.Railway Timetabling;Stochastic Optimization;Robustness
    corecore