26,037 research outputs found
Affine arithmetic-based methodology for energy hub operation-scheduling in the presence of data uncertainty
In this study, the role of self-validated computing for solving the energy hub-scheduling problem in the presence of multiple and heterogeneous sources of data uncertainties is explored and a new solution paradigm based on affine arithmetic is conceptualised. The benefits deriving from the application of this methodology are analysed in details, and several numerical results are presented and discussed
Project scheduling under undertainty – survey and research potentials.
The vast majority of the research efforts in project scheduling assume complete information about the scheduling problem to be solved and a static deterministic environment within which the pre-computed baseline schedule will be executed. However, in the real world, project activities are subject to considerable uncertainty, that is gradually resolved during project execution. In this survey we review the fundamental approaches for scheduling under uncertainty: reactive scheduling, stochastic project scheduling, stochastic GERT network scheduling, fuzzy project scheduling, robust (proactive) scheduling and sensitivity analysis. We discuss the potentials of these approaches for scheduling projects under uncertainty.Management; Project management; Robustness; Scheduling; Stability;
Expert systems and finite element structural analysis - a review
Finite element analysis of many engineering systems is practised more as an art than as a science . It involves high level expertise (analytical as well as heuristic) regarding problem modelling (e .g. problem specification,13; choosing the appropriate type of elements etc .), optical mesh design for achieving the specified accuracy (e .g . initial mesh selection, adaptive mesh refinement), selection of the appropriate type of analysis and solution13; routines and, finally, diagnosis of the finite element solutions . Very often such expertise is highly dispersed and is not available at a single place with a single expert. The design of an expert system, such that the necessary expertise is available to a novice to perform the same job even in the absence of trained experts, becomes an attractive proposition. 13; In this paper, the areas of finite element structural analysis which require experience and decision-making capabilities are explored . A simple expert system, with a feasible knowledge base for problem modelling, optimal mesh design, type of analysis and solution routines, and diagnosis, is outlined. Several efforts in these directions, reported in the open literature, are also reviewed in this paper
The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review
Purpose: The goal of this article is to provide an extensive literature review of the models and solution procedures proposed by many researchers interested on the Project Scheduling Problem with nondeterministic activities duration. Design/methodology/approach: This paper presents an exhaustive literature review, identifying the existing models where the activities duration were taken as uncertain or random parameters. In order to get published articles since 1996, was employed the Scopus database. The articles were selected on the basis of reviews of abstracts, methodologies, and conclusions. The results were classified according to following characteristics: year of publication, mathematical representation of the activities duration, solution techniques applied, and type of problem solved. Findings: Genetic Algorithms (GA) was pointed out as the main solution technique employed by researchers, and the Resource-Constrained Project Scheduling Problem (RCPSP) as the most studied type of problem. On the other hand, the application of new solution techniques, and the possibility of incorporating traditional methods into new PSP variants was presented as research trends. Originality/value: This literature review contents not only a descriptive analysis of the published articles but also a statistical information section in order to examine the state of the research activity carried out in relation to the Project Scheduling Problem with non-deterministic activities duration.Peer Reviewe
Recommended from our members
Investment Risk Appraisal
Standard financial techniques neglect extreme situations and regards large market shifts as too unlikely to matter. This
approach may account for what occurs most of the time in the market, but the picture it presents does not reflect the reality, as the
major events happen in the rest of the time and investors are ‘surprised’ by ‘unexpected’ market movements. An alternative fuzzy
approach permits fluctuations well beyond the probability type of uncertainty and allows one to make fewer assumptions about the
data distribution and market behaviour. Fuzzifying the present value criteria, we suggest a measure of the risk associated with each
investment opportunity and estimate the project’s robustness towards market uncertainty. The procedure is applied to thirty-five UK
companies and a neural network solution to the fuzzy criterion is provided to facilitate the decision-making process. Finally, we
discuss the grounds for classical asset pricing model revision and argue that the demand for relaxed assumptions appeals for another
approach to modelling the market environment
- …