3,179 research outputs found

    A survey of scheduling problems with setup times or costs

    Get PDF
    Author name used in this publication: C. T. NgAuthor name used in this publication: T. C. E. Cheng2007-2008 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe

    Dynamic scheduling in a multi-product manufacturing system

    Get PDF
    To remain competitive in global marketplace, manufacturing companies need to improve their operational practices. One of the methods to increase competitiveness in manufacturing is by implementing proper scheduling system. This is important to enable job orders to be completed on time, minimize waiting time and maximize utilization of equipment and machineries. The dynamics of real manufacturing system are very complex in nature. Schedules developed based on deterministic algorithms are unable to effectively deal with uncertainties in demand and capacity. Significant differences can be found between planned schedules and actual schedule implementation. This study attempted to develop a scheduling system that is able to react quickly and reliably for accommodating changes in product demand and manufacturing capacity. A case study, 6 by 6 job shop scheduling problem was adapted with uncertainty elements added to the data sets. A simulation model was designed and implemented using ARENA simulation package to generate various job shop scheduling scenarios. Their performances were evaluated using scheduling rules, namely, first-in-first-out (FIFO), earliest due date (EDD), and shortest processing time (SPT). An artificial neural network (ANN) model was developed and trained using various scheduling scenarios generated by ARENA simulation. The experimental results suggest that the ANN scheduling model can provided moderately reliable prediction results for limited scenarios when predicting the number completed jobs, maximum flowtime, average machine utilization, and average length of queue. This study has provided better understanding on the effects of changes in demand and capacity on the job shop schedules. Areas for further study includes: (i) Fine tune the proposed ANN scheduling model (ii) Consider more variety of job shop environment (iii) Incorporate an expert system for interpretation of results. The theoretical framework proposed in this study can be used as a basis for further investigation

    A single-machine scheduling problem with multiple unavailability constraints: A mathematical model and an enhanced variable neighborhood search approach

    Get PDF
    AbstractThis research focuses on a scheduling problem with multiple unavailability periods and distinct due dates. The objective is to minimize the sum of maximum earliness and tardiness of jobs. In order to optimize the problem exactly a mathematical model is proposed. However due to computational difficulties for large instances of the considered problem a modified variable neighborhood search (VNS) is developed. In basic VNS, the searching process to achieve to global optimum or near global optimum solution is totally random, and it is known as one of the weaknesses of this algorithm. To tackle this weakness, a VNS algorithm is combined with a knowledge module. In the proposed VNS, knowledge module extracts the knowledge of good solution and save them in memory and feed it back to the algorithm during the search process. Computational results show that the proposed algorithm is efficient and effective

    Modelling activity times by hybrid synthetic method

    Get PDF
    Uncertain (manual) activity times impact a number of manufacturing system modules: plant and layout design, capacity analysis, operator assignment, process planning, scheduling and simulation. Direct observation cannot be used for non-existent production lines. A hybrid direct observation/synthetic method derived from Method Time Measurement available in industry is proposed. To determine accurate activity times required by heuristics and metaheuristics optimisation, manufacturing system modules are modelled by MILP and operator efficiency parameters are used for time standardisation. Among human factors considered are skill and ergonomics. Application to the sterilisation of reusable medical devices is extensively described. Experimental data taken from observation on the field and a worst-case date have shown the model direct applicability for professionals also to non-manufacturing cases

    Working Notes from the 1992 AAAI Spring Symposium on Practical Approaches to Scheduling and Planning

    Get PDF
    The symposium presented issues involved in the development of scheduling systems that can deal with resource and time limitations. To qualify, a system must be implemented and tested to some degree on non-trivial problems (ideally, on real-world problems). However, a system need not be fully deployed to qualify. Systems that schedule actions in terms of metric time constraints typically represent and reason about an external numeric clock or calendar and can be contrasted with those systems that represent time purely symbolically. The following topics are discussed: integrating planning and scheduling; integrating symbolic goals and numerical utilities; managing uncertainty; incremental rescheduling; managing limited computation time; anytime scheduling and planning algorithms, systems; dependency analysis and schedule reuse; management of schedule and plan execution; and incorporation of discrete event techniques

    Online scheduling: a survey

    Get PDF
    In this article a deep search of the literature of online scheduling is conducted. This paper intends to assess the developments and solutions found for online scheduling problems. Online scheduling is a very important topic since most of the real scheduling problems have dynamic characteristics. First, it was developed a literature review about scheduling problems, dividing them in stochastic and deterministic problems as well as in online and offline problems. Then, a bibliometric analysis was performed. Finally, some case studies in the field of online scheduling were analyzed. Online Scheduling is mostly explored in industry and health areas. In some articles explored there is a rescheduling, and the sequence of task may change due to the arrival of new tasks. In other cases, the new tasks are introduced in blocks of time that do not affect the previous schedule. This last technique is limited, since, with the arrival of new tasks, the schedule is not re-evaluated. Therefore, it is thought that, in future work, within the scope of online scheduling, when new tasks or other significant changes enter the system, the system should be evaluated, allowing the necessary changes to be made to the existing schedule. The Industry 4.0 and the evolution of Internet of Things (IoT), Deep Learning and Machine Learning favours a continuous and real-time flow of information, which allows the implementation of real-time online scheduling. This is a branch that should be explored in future works.FCT - Fundação para a Ciência e a Tecnologia(UIDB/00319/2020
    corecore