5,424,217 research outputs found

    Placement Test Information Systems Student Assessment Institutions in English Course Iecpasar Rebo

    Full text link
    The problems faced in these institutions lies in the assessment system for the placement test students who are still done manually, which is a lot of manual system faced various obstacles and inefficiencies both in terms of time and of the workings of the organizer committee test. For that formed the design of the system to replace existing systems with computerized systems. So that the results obtained from the new system isexpected to assist the performance of these institutions. It is expected that by using a computer system can be run more effectively and efficiently than the manual method

    Actual Test Coverage for Embedded Systems

    Get PDF
    Testing embedded systems is inherently incomplete; no test suite will ever be able to test all possible usage scenarios. Therefore, in the past decades many coverage measures have been developed. These measures denote the portion of a system that is tested, that way providing a quality criterion for test suites. Formulating coverage criteria is not an easy task. The measures provided in the literature are consequently almost all very trivial and syntax-dependent. Well-known examples are statement and path coverage in white-box testing, and state and transition coverage in black-box testing. The complexity of designing coverage measures for embedded systems is contained in the highly dynamic behaviour of such systems, which is state-dependent and subject to many interleavings. In this talk we introduce a framework on actual test coverage. This measure denotes the number of faults actually shown present or absent. Our framework contains a method to evaluate the actual coverage of a given set of test suite executions after testing has taken place, providing a means to express the quality of a testing process. It also contains a method to predict the actual coverage a certain number of executions will yield, providing a means to select the best test suite. Both the evaluation afterwards and the prediction in advance are quite efficient, making it feasible to implement the theory in a tool and use it in a practical context

    Test of preemptive real-time systems

    Get PDF
    Time Petri nets with stopwatches not only model system/environment interactions and time constraints. They further enable modeling of suspend/resume operations in real-time systems. Assuming the modelled systems are non deterministic and partially observable, the paper proposes a test generation approach which implements an online testing policy and outputs test results that are valid for the (part of the) selected environment. A relativized conformance relation named rswtioco is defined and a test generation algorithm is presented. The proposed approach is illustrated on an example

    Agent Based Test and Repair of Distributed Systems

    Get PDF
    This article demonstrates how to use intelligent agents for testing and repairing a distributed system, whose elements may or may not have embedded BIST (Built-In Self-Test) and BISR (Built-In Self-Repair) facilities. Agents are software modules that perform monitoring, diagnosis and repair of the faults. They form together a society whose members communicate, set goals and solve tasks. An experimental solution is presented, and future developments of the proposed approach are explore

    DOE LeRC photovoltaic systems test facility

    Get PDF
    The facility was designed and built and is being operated as a national facility to serve the needs of the entire DOE National Photovoltaic Program. The object of the facility is to provide a place where photovoltaic systems may be assembled and electrically configured, without specific physical configuration, for operation and testing to evaluate their performance and characteristics. The facility as a breadboard system allows investigation of operational characteristics and checkout of components, subsystems and systems before they are mounted in field experiments or demonstrations. The facility as currently configured consist of 10 kW of solar arrays built from modules, two inverter test stations, a battery storage system, interface with local load and the utility grid, and instrumentation and control necessary to make a flexible operating facility. Expansion to 30 kW is planned for 1978. Test results and operating experience are summaried to show the variety of work that can be done with this facility

    Test system requirements for modelling future power systems

    Get PDF
    This paper discusses the need for new test system models to be developed and made available to researchers. A number of features of such test systems are proposed. These include sufficient size and scope to allow control interactions to be studied but not so much that phenomena associated with new technologies cannot be understood. It is recalled that the performance of new technologies and their controls should be verified on a full system model that is as faithful to the real system and its parameters as possible and that this requires access to data often owned by generating companies to which system operators have access but do not feel able to disclose. Finally, arguments are presented as to why such data should be disclosed and it is recommended that regulatory authorities take steps to achieve it

    The ERDA/LeRC photovoltaic systems test facility

    Get PDF
    A test facility was designed, and built to provide a place where photovoltaic systems may be assembled and electrically configured, to evaluate system performance and characteristics. The facility consists of a solar cell array of an initial 10-kW peak power rating, test hardware for several alternate methods of power conditioning, a variety of loads, an electrical energy storage system, and an instrumentation and data acquisition system
    corecore