177 research outputs found
Integrating Multiple Alarms & Driver Situation Awareness
This study addresses this gap in CAS and intelligent alarm research by examining whether or not a single master alarm warning versus multiple warnings for the different collision warning systems conveys adequate information to the drivers. Intelligent driver warning systems signaling impending frontal and rear collisions, as well as unintentional lane departures were used in this experiment, and all the warnings were presented to drivers through the auditory channel only. We investigated two critical research questions in this study:
1. Do multiple intelligent alarms as opposed to a single master alarm affect drivers’ recognition, performance, and action when they experience a likely imminent collision and unintentional lane departure? 2. Is driver performance and overall situation awareness under the two different alarm alerting schemes affected by reliabilities of the warning systems?Prepared For Ford Motor Compan
Canadian Space Station program
Information on the Canadian Space Station Program is given in viewgraph form. Topics covered include the Mobile Servicing Center (MSC), Space Station Freedom assembly milestones, the MB-3 launch configuration, a new workstation configuration, strategic technology development, the User Development Program, the Space Station Program budget, and Canada's future space activities
Independent Orbiter Assessment (IOA): Analysis of the displays and controls subsystem
The results of the Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL) are presented. The IOA approach features a top-down analysis of the hardware to determine failure modes, criticality, and potential critical items. To preserve independence, this analysis was accomplished without reliance upon the results contained within the NASA FMEA/CIL documentation. This report documents the independent analysis results corresponding to the Orbiter Displays and Controls (D and C) subsystem hardware. The function of the D and C hardware is to provide the crew with the monitor, command, and control capabilities required for management of all normal and contingency mission and flight operations. The D and C hardware for which failure modes analysis was performed consists of the following: Acceleration Indicator (G-METER); Head Up Display (HUD); Display Driver Unit (DDU); Alpha/Mach Indicator (AMI); Horizontal Situation Indicator (HSI); Attitude Director Indicator (ADI); Propellant Quantity Indicator (PQI); Surface Position Indicator (SPI); Altitude/Vertical Velocity Indicator (AVVI); Caution and Warning Assembly (CWA); Annunciator Control Assembly (ACA); Event Timer (ET); Mission Timer (MT); Interior Lighting; and Exterior Lighting. Each hardware item was evaluated and analyzed for possible failure modes and effects. Criticality was assigned based upon the severity of the effect for each failure mode
Advanced crew procedures development techniques: Procedures and performance program description
The Procedures and Performance Program (PPP) for operation in conjunction with the Shuttle Procedures Simulator (SPS) is described. The PPP user interface, the SPS/PPP interface, and the PPP applications software are discussed
Manned simulations of the SRMS in SIMFAC
SIMFAC is a general purpose real-time simulation facility currently configured with an Orbiter-like Crew Compartment and a Displays and Controls (D and C) Subsystem to support the engineering developments of the Space Shuttle Remote Manipulator (SRMS). The simulation consists of a software model of the anthropomorphic SRMS manipulator arm including the characteristics of its control system and joint drive modules. The following are discussed: (1) simulation and scene generation subsystems; (2) the SRMS task in SIMFAC; (3) operator tactics and options; (4) workload; (5) operator errors and sources; (6) areas for further work; and (7) general observations
Apollo experience report: Command and service module controls and displays subsystem
A review of the command and service module controls and displays subsystem is presented. The subsystem is described, and operational requirements, component history, problems and solutions, and conclusions and recommendations for the subsystem are included
Apollo Soyuz Mission: 5-Day Report
The Apollo Soyuz Test Project mission objectives and technical investigations are summarized. Topics discussed include: spacecraft and crew systems performance; joint flight activities; scientific and applications experiments; in-flight demonstrations; biomedical considerations; and mission support performance
- …