12,165 research outputs found

    LATOR Covariance Analysis

    Full text link
    We present results from a covariance study for the proposed Laser Astrometric Test of Relativity (LATOR) mission. This mission would send two laser-transmitter spacecraft behind the Sun and measure the relative gravitational light bending of their signals using a hundred-meter-baseline optical interferometer to be constructed on the International Space Station. We assume that each spacecraft is equipped with a <1.9×10−13ms2Hz−1/2 < 1.9 \times 10^{-13} \mathrm{m} \mathrm{s}^2 \mathrm{Hz}^{-1/2} drag-free system and assume approximately one year of data. We conclude that the observations allow a simultaneous determination of the orbit parameters of the spacecraft and of the Parametrized Post-Newtonian (PPN) parameter γ\gamma with an uncertainty of 2.4×10−92.4 \times 10^{-9}. We also find a 6×10−96 \times 10^{-9} determination of the solar quadrupole moment, J2J_2, as well as the first measurement of the second-order post-PPN parameter δ\delta to an accuracy of about 10−310^{-3}.Comment: 9 pages, 3 figures. first revision: minor changes to results. Second revision: additional discussion of orbit modelling and LATOR drag-free system requirement feasibility. Added references to tables I and V (which list PPN parameter uncertainties), removed word from sentence in Section III. 3rd revision: removed 2 incorrect text fragments (referring to impact parameter as distance of closest approach) and reference to upcoming publication of ref. 2, removed spurious gamma from eq. 1 - Last error is still in cqg published versio

    GRAVSAT/GEOPAUSE covariance analysis including geopotential aliasing

    Get PDF
    A conventional covariance analysis for the GRAVSAT/GEOPAUSE mission is described in which the uncertainties of approximately 200 parameters, including the geopotential coefficients to degree and order 12, are estimated over three different tracking intervals. The estimated orbital uncertainties for both GRAVSAT and GEOPAUSE reach levels more accurate than presently available. The adjusted measurement bias errors approach the mission goal. Survey errors in the low centimeter range are achieved after ten days of tracking. The ability of the mission to obtain accuracies of geopotential terms to (12, 12) one to two orders of magnitude superior to present accuracy levels is clearly shown. A unique feature of this report is that the aliasing structure of this (12, 12) field is examined. It is shown that uncertainties for unadjusted terms to (12, 12) still exert a degrading effect upon the adjusted error of an arbitrarily selected term of lower degree and order. Finally, the distribution of the aliasing from the unestimated uncertainty of a particular high degree and order geopotential term upon the errors of all remaining adjusted terms is listed in detail

    Long and short arc altitude determination for GEOS-C

    Get PDF
    The accuracy with which the GEOS-C altitude may be estimated over long (7 day) and short (40 minute) orbital arcs is investigated. Over the long are excellent agreement was attained between a simulation of the orbit determination process and a covariance analysis. Both approaches yielded RMS altitude errors of about 1.5 meters over the Caribbean calibration area and approximately 7.5 meters overall. The geopotential was identified as the largest error source. For the short arc, the covariance analysis revealed that the propagated altitude error is linearly dependent upon station survey component errors which are also the largest source of altitude errors. An Appendix contains the mathematics of covariance analysis as applied to orbit determination

    Space shuttle navigation analysis. Volume 2: Baseline system navigation

    Get PDF
    Studies related to the baseline navigation system for the orbiter are presented. The baseline navigation system studies include a covariance analysis of the Inertial Measurement Unit calibration and alignment procedures, postflight IMU error recovery for the approach and landing phases, on-orbit calibration of IMU instrument biases, and a covariance analysis of entry and prelaunch navigation system performance

    Covariance analysis of the airborne laser ranging system

    Get PDF
    The requirements and limitations of employing an airborne laser ranging system for detecting crustal shifts of the Earth within centimeters over a region of approximately 200 by 400 km are presented. The system consists of an aircraft which flies over a grid of ground deployed retroreflectors, making six passes over the grid at two different altitudes. The retroreflector baseline errors are assumed to result from measurement noise, a priori errors on the aircraft and retroreflector positions, tropospheric refraction, and sensor biases

    Generalized Linear Covariance Analysis

    Get PDF
    We review and extend in two directions the results of prior work on generalized covariance analysis methods. This prior work allowed for partitioning of the state space into "solve-for" and "consider" parameters, allowed for differences between the formal values and the true values of the measurement noise, process noise, and a priori solve-for and consider covariances, and explicitly partitioned the errors into subspaces containing only the influence of the measurement noise, process noise, and a priori solve-for and consider covariances. In this work, we explicitly add sensitivity analysis to this prior work, and relax an implicit assumption that the batch estimator s anchor time occurs prior to the definitive span. We also apply the method to an integrated orbit and attitude problem, in which gyro and accelerometer errors, though not estimated, influence the orbit determination performance. We illustrate our results using two graphical presentations, which we call the "variance sandpile" and the "sensitivity mosaic," and we compare the linear covariance results to confidence intervals associated with ensemble statistics from a Monte Carlo analysis
    • …
    corecore