108 research outputs found

    Status of the linear accelerator-injector at TNK facility

    No full text
    Industrial storage facility at Lukin State Research Institute for Problems in Physics, Zelenograd includes two electron storage rings: the main ring for energy of 2.5 GeV and booster ring for energy of 450 MeV. Linear accelerator for electron energy up to 80 MeV serves as an electron injector of TNK facility. The accelerator was commissioned in December, 2002. The accelerated current of ~50 mA at 55 MeV was obtained. The paper presents the linear accelerator scheme and time diagram for its parts operation. DAW accelerating structure and beam transportation channel to the booster ring are described. The electron beam parameters obtained are listed.Технологический накопительный комплекс НИИ ФП им. Лукина г.Зеленоград включает в себя два накопителя электронов: основной накопитель на энергию 2.5 ГэВ и малый накопитель–бустер на энергию 450 МэВ. Инжектором электронов комплекса ТНК является линейный ускоритель на энергию до 80 МэВ. В декабре 2002 г. был осуществлен запуск ускорителя. Получен ускоренный ток ~50 мА с энергией 55 МэВ. В статье рассмотрена схема линейного ускорителя и временная диаграмма работы ее элементов. Дано описание ускоряющей структуры с шайбами и диафрагмами и канала транспортировки пучка к малому накопителю. Приведены достигнутые к настоящему времени параметры пучка электроновТехнологічний накопичувальний комплекс НДІ ФП ім.Лукіна м.Зеленоград містить у собі два на- копичувача електронів: основний накопичувач на енергію 2.5 ГеВ і малий накопичувач−бустер на енергію 450 МеВ. Інжектором електронів комплексу ТНК є лінійний прискорювач на енергію до 80 МеВ. У грудні 2002 р. був здійснений запуск прискорювача. Отримано прискорений струм ~50 мА з енергією 55 МеВ. У статті розглянута схема лінійного прискорювача і тимчасова діаграма роботи її елементів. Дано опис прискорювальної структури із шайбами і діафрагмами і каналу транспортування пучка до малого накопичувача. Наведено досягнуті до теперішнього часу параметри пучка електронів

    Work status of 5 MeV 300 kW electron accelerator

    No full text
    Design work has been completed for the accelerating structure of high-power electron accelerator with 5 MeV, 300 kW, 176 MHz parameters. The structure is being produced in BINP workshop. The paper presents the design of the accelerating structure which consists of a chain of coaxial cavities, and block diagram of experimental workbench. Structure of the main accelerator blocks and their degree of fabrication are viewed.Закончены проектные работы по ускоряющей структуре мощного электронного ускорителя 5 МэВ, 300 кВт, 176 МГц и ведется ее изготовление в опытном производстве Института. Дается описание конструкции ускоряющей структуры, состоящей из цепочки связанных коаксиальных резонаторов. Приводится блок-схема испытательного стенда, рассматривается устройство отдельных узлов ускорителя и состояние их готовности.Закінчено проектні роботи із прискорювальної структури потужного електронного прискорювача 5 МеВ, 300 кВт, 176 МГц і ведеться її виготовлення в дослідному виробництві інституту. Дається опис конструкції прискорювальної структури, що складається з ланцюжка зв'язаних коаксіальних резонаторів. Приводиться блок-схема іспитового стенда, розглядається будова окремих вузлів прискорювача і стан їх готовності

    Comissioning of the linear accelerator-injector at the TNK facility

    No full text
    The industrial storage facility has been developed and manufactured at the Budker INP SB RAS. It contains an 80 MeV electron linear accelerator-injector and two electron storage rings: the lesser 450 MeV booster ring and the main 2.5 GeV storage ring. In 2002, the work on the accelerator assembling was begun. On December, 25 this year the accelerator was started up, and the current at the linear accelerator output was obtained. The linear accelerator schematic together with a description of the 6 meter long accelerating DAW structure which operates at 2.8 GHz, are presented in the paper. The first results of the accelerator start-up are as follows: the accelerated electron current of ~50 mA with the energy of ~55...60 MeV.Технологічний накопичувальний комплекс був спроектований і виготовлений у ІЯФ ім. Г.І. Будкера СВ РАН. Він містить у собі інжектор–лінійний прискорювач електронів з енергією до 80 МеВ і два накопичувачі електронів: малий накопичувач–бустер на енергію 450 МеВ і основний накопичувач на енергію 2.5 ГеВ. Приводяться функціональна схема лінійного прискорювача й опис конструкції прискорюючої структури із шайбами і діафрагмами довжиною 6 м, що працює на частоті 2.8 ГГц.Представлено перші результати запуску прискорювача: отриманий прискорений струм електронів ~50 мА з енергією ~(55...60) МеВ.Технологический накопительный комплекс был спроектирован и изготовлен в ИЯФ им. Г.И. Будкера СО РАН. Он включает в себя инжектор–линейный ускоритель электронов с энергией до 80 МэВ и два накопителя электронов: малый накопитель–бустер на энергию 450 МэВ и основной накопитель на энергию 2.5 ГэВ. Приводятся функциональная схема линейного ускорителя и описание конструкции ускоряющей структуры с шайбами и диафрагмами длиной 6 метров, работающей на частоте 2.8 ГГц. Представлены первые результаты запуска ускорителя: получен ускоренный ток электронов ~50 мA с энергией ~(55...60) МэВ

    Transatrial instrumental mitral commissurotomy from a left side approach (Russian)

    No full text
    The authors propose a new method of operative intervention with instrumental transatrial mitral commissurotomy through a left-side transauricular approach by using a dilator on a flexible wire rope of a new design. The method was applied in surgery on 102 patients, aged from 18 to 56 yr. Of these 40.2 % (41) had stage IV of the affection and in 32 the operation was performed with the mitral valve in the state of calcinosis. In all of the patients a sufficiently large dilation of the mitral orifice, from 3 to 4.5 cm, could be achieved, the separation of both commissures having been effected in 91 (91.2%) of the patients. There were no complications due to the application of the dilator. One patient (0.9%) died in consequence of sepsis in the postoperative period. Late results were followed up in 75 patients over periods from 1 1/2 to 7 yr. In 69 (92%) these were held to be excellent and good. No recurrent stenosis and lethal outcomes late after surgery were on record. On the ground of positive results obtained by the authors they recommend employing the left-side transatrial commissurotomy on a flexible wire rope as an independent method of surgery in mitral stenosis which under a digital control ensures a highly effective commissurotomy with but minor traumatic lesion of the heart and minimal complications

    The Internet of Things Market in Russia: Key Trends

    No full text
    The Russian Internet of things market is in its infancy. The Internet of Things, along with other technologies of the fourth industrial revolution, such as artificial intelligence, cloud computing, "Big data", has a unique potential that can cause significant changes in the world. This study aims to identify positive factors and barriers of industrial and consumer IoT in Russia

    Перспективы использования искусственного интеллекта для принятия стратегических решений

    No full text
    The article is devoted to the analysis of the prospects for the use of artificial intelligence in the process of making strategic decisions. How and what decisions is artificial intelligence capable of making, what opportunities are opened up thanks to its use, what are the limitations and negative consequences of using artifi cial intelligence, how to use artificial intelligence technologies to achieve the results that a person needs, is coop eration between humans and artificial intelligence possible? These are the main questions that the authors an swer in this article.Статья посвящена анализу перспектив использования искусственного интеллекта в процессе принятия стратегических решений. Как и какие решения способен принимать искусствен ный интеллект, какие возможности открываются, благодаря его использованию, каковы ограничения и негативные последствия применения искусственного интеллекта, как применять технологии ис кусственного интеллекта для достижения нужных человеку результатов, возможно ли сотрудниче ство между человеком и искусственным интеллектом? Это основные вопросы, на которые авторы отвечают в данной статье

    Transatrial instrumental mitral commissurotomy from a left side approach (Russian)

    No full text
    The authors propose a new method of operative intervention with instrumental transatrial mitral commissurotomy through a left-side transauricular approach by using a dilator on a flexible wire rope of a new design. The method was applied in surgery on 102 patients, aged from 18 to 56 yr. Of these 40.2 % (41) had stage IV of the affection and in 32 the operation was performed with the mitral valve in the state of calcinosis. In all of the patients a sufficiently large dilation of the mitral orifice, from 3 to 4.5 cm, could be achieved, the separation of both commissures having been effected in 91 (91.2%) of the patients. There were no complications due to the application of the dilator. One patient (0.9%) died in consequence of sepsis in the postoperative period. Late results were followed up in 75 patients over periods from 1 1/2 to 7 yr. In 69 (92%) these were held to be excellent and good. No recurrent stenosis and lethal outcomes late after surgery were on record. On the ground of positive results obtained by the authors they recommend employing the left-side transatrial commissurotomy on a flexible wire rope as an independent method of surgery in mitral stenosis which under a digital control ensures a highly effective commissurotomy with but minor traumatic lesion of the heart and minimal complications

    Cross-cultural competence of personnel as one of the key success factors of a multinational company in globalization

    No full text
    As the globalization process is gaining its influence and novel technologies are rapidly developing, the very nature of modern organizations is becoming more dynamic, innovative and eager to cooperate on the international level. Nowadays intercultural communications become a crucial element of progressive companies' activities. These activities inevitably lead to a range of cross-cultural issues due to differences in behavior, mindset and values of those coming from different cultural backgrounds. Under the circumstances of international business, cultural differences sprout misunderstanding and confusion, which eventually leads to poorer performance of an organization as a whole. Therefore, cross-cultural competence in international business environment becomes as vital as the professional one. The goal of the present work is to investigate the influence of cross-cultural competence on personal performance of employees in multinational companies. Copyright © 2018 International Business Information Management Association (IBIMA)

    Влияние сбалансированной системы показателей на повышение конкурентоспособности университета

    No full text
    Increased competition in the national and global markets for educational services leads to the need to find ways to strengthen the position of universities. The use of new management technologies in universi ty management, in particular, a balanced scorecard, improves management efficiency and, as a result, enhances the university’s competitiveness.Усиление конкуренции на национальном и мировом рынках образовательных услуг приводит к необходимости поиска путей укрепления позиций университетов. Использование в управ лении вузом новых управленческих технологий, в частности, сбалансированной системы показателей, способствует повышению эффективности управления и, как следствие, повышению конкурентоспо собности университета
    corecore