4 research outputs found
Lageos assembly operation plan
Guidelines and constraints procedures for LAGEOS assembly, operation, and design performance are given. Special attention was given to thermal, optical, and dynamic analysis and testing. The operation procedures illustrate the interrelation and sequence of tasks in a flow diagram. The diagram also includes quality assurance functions for verification of operation tasks
Boydbolt, a positive-latch, simple-release fastener
Fastener /Boydbolt/ has recently been designed to furnish positive lock and release characteristics that positively prevent accidental adverse functions of lock or release
Early Apollo Scientific Experiments Package crew systems and operations analyses
This EATM contains analyses for the deployment of the EASEP and the criteria upon which the crew systems design review for all drawings was based.Haydon Y. Grubbs, J. Brueger.EASEP Crew Systems and Operations Deployment Task/Time Sequence Analyses for LRRR & PSEP -- Crew Systems Criteria for Early Apollo Scientific Experiments Packages