131 research outputs found
Thoughts On Incorporating HPRF In A Linear Cooling Channel
We discuss a possible implementation of high-pressure gas-filled RF (HPRF)
cavities in a linear cooling channel for muons and some of the technical issues
that must be dealt with. The approach we describe is a hybrid approach that
uses high-pressure hydrogen gas to avoid cavity breakdown, along with discrete
LiH absorbers to provide the majority of the energy loss. Initial simulations
show that the channel performs as well as the original vacuum RF channel while
potentially avoiding the degradation in RF gradient associated with the strong
magnetic field in the cooling channel.Comment: 5 pages, 8 figures, submitted to Proceedings of NUFACT0
Recommended from our members
The PEP-II Project: Low-Energy Ring Design and Project Status
We describe the present status of the PEP-II project. The project comprises four major systems: Injector, High-Energy Ring (HER), Low-Energy Ring (LER), and Interaction Region (IR). We focus in detail on the design of the LER, as its parameters and requirements are most closely related to those required for the Beijing Tau-Charm Factory rings. The PEP-II LER is a high-current, 3.1-GeV positron ring mounted above the 9-GeV HER. The LER uses a wiggler located in one of its six straight sections to provide emittance control and additional damping. We describe the rather complicated IR, which must transport the LER beam into the plane of the HER, focus it to a common beam size, and separate the beams after the head-on collisions. Both permanent magnet and conventional electromagnets are used in this area. The LER lattice has now adopted a simplified non-interleaved sextupole correction scheme that has reduced the required number of sextupoles substantially. We describe the LER vacuum system, one of the most challenging subsystems in PEP-II. It employs several technologies. In the arcs, aluminum extrusions and titanium sublimation pumps are employed; the straight sections use stainless steel chambers with lumped ion pumps. In the wiggler area, an extended copper photon dump with nonevaporable getter (NEG) pumps is employed to handle the very large synchrotron radiation power. The design of the room-temperature RF system, the bunch-by-bunch longitudinal and transverse feedback systems, and some of the special diagnostics will be described briefly. The PEP-II project remains on schedule to begin commissioning of the HER in April 1997, followed by the LER a year later
Recommended from our members
Technical implementation of feasibility study-II design
An updated Feasibility Study for a high-performance Neutrino Factory has been undertaken by Brookhaven National Laboratory (BNL) and the Neutrino Factory and Muon Collider Collaboration (MC). We describe the technical implementation of the facility. Details of the key components are shown, and R and D activities that need to be addressed to proceed toward a facility design are indicated
Effect of Particle Size on Droplet Infiltration into Hydrophobic Porous Media As a Model of Water Repellent Soil
The wettability of soil is of great importance for plants and soil biota, and in determining the risk for preferential flow, surface runoff, flooding,and soil erosion. The molarity of ethanol droplet (MED) test is widely used for quantifying the severity of water repellency in soils that show reduced wettability and is assumed to be independent of soil particle size. The minimum ethanol concentration at which droplet penetration occurs within a short time (≤10 s) provides an estimate of the initial advancing contact angle at which spontaneous wetting is expected. In this study, we test the assumption of particle size independence using a simple model of soil, represented by layers of small (0.2–2 mm) diameter beads that predict the effect of changing bead radius in the top layer on capillary driven imbibition. Experimental results using a three-layer bead system show broad agreement with the model and demonstrate a dependence of the MED test on particle size. The results show that the critical initial advancing contact angle for penetration can be considerably less than 90° and varies with particle size, demonstrating that a key assumption currently used in the MED testing of soil is not necessarily valid
Recommended from our members
Preliminary Test Results for the MICE Spectrometer Superconducting Solenoids
This report describes the MICE spectrometer solenoids as built. Each magnet consists of five superconducting coils. Two coils are used to tune the beam going from or to the MICE spectrometer from the rest of the MICE cooling channel. Three spectrometer coils (two end coils and a long center coil) are used to create a uniform 4 T field (to {+-}0.3 percent) over a length of 1.0 m within a diameter of 0.3 m. The three-coil spectrometer set is connected in series. The two end coils use small power supplies to tune the uniform field region where the scintillating fiber tracker is located. This paper will present the results of the preliminary testing of the first spectrometer solenoid
- …