36 research outputs found

    ヨウリョクタイガタ フェレドキシン ノ コウゾウ カイセキ 2.8Å ブンカイノウ

    Get PDF
    Remarkable progress in the physical parameters of net-current free plasmas has been made in the Large Helical Device (LHD) since the last Fusion Energy Conference in Chengdu, 2006 (O.Motojima et al., Nucl. Fusion 47 (2007) S668). The beta value reached 5 % and a high beta state beyond 4.5% from the diamagnetic measurement has been maintained for longer than 100 times the energy confinement time. The density and temperature regimes also have been extended. The central density has exceeded 1.0 x 10^21 m^-3 due to the formation of an Internal Diffusion Barrier (IDB). The ion temperature has reached 6.8 keV at the density of 2 x 10^19m^-3, which is associated with the suppression of ion heat conduction loss. Although these parameters have been obtained in separated discharges, each fusion-reactor relevant parameter has elucidated the potential of net-current free heliotron plasmas. Diversified studies in recent LHD experiments are reviewed in this paper

    S1-global collaborative efforts - 8-cavity-cryomodule : 2 FNAL, 2 DESY and 4 KEK

    No full text
    In an attempt to demonstrate an average accelerating gradient of 31.5 MV/m as in the design of the ILC, the S1-Global project [1,2] is a cryomodule being constructed and tested by an international collaboration hosted by KEK and including INFN, FNAL, DESY and SLAC. The S1-Global system joins two half-length cryomodules, each 6 m in length and containing 4 cavities, Module-C contains cavities from FNAL and DESY and was constructed by INFN. Module-A contains four KEK cavities and was constructed by KEK. The assembly of the cryomodules was completed in May 2010, and the cold test started from June 2010. In this paper, the international collaboration efforts of the S1-Global cryomodule are presented with the preliminary cold test results and the following test plans

    S1-Global module tests at STF/KEK

    No full text
    S1-Global collaborative effort recently successfully finished at KEK as a part of ILC-GDE is an important milestone for the ILC. International collaboration of three regions, Asia, North America and Europe, proved to be efficient on the construction and cold tests of the accelerating module consisting of 8 SRF cavities; 2 from FNAL, 2 from DESY and 4 from KEK. Three different cavity tuning systems were tested together with two types of high power couplers. The module was cooled down three times which enabled extensive high power tests with cavities, performance limits investigation, Lorentz force detuning tests, simultaneous multiple cavities operation and other activities such as an operation test of distributed RF scheme with low level RF feedback. The results of this S1-Global module test are presented and discussed

    Recent Developments and Operational Status of the Compact ERL at KEK

    No full text
    The Compact Energy Recovery Linac (cERL) at KEK is a test accelerator in order to develop key components to realize remarkable ERL performance as a future light source. After the beam commissioning in December 2013, the legal current limit has been increased step-by-step like 1 uA, 10 uA, and 100 uA. Survey for the source of beam losses has been conducted in each step, and the study on beam dynamics and tuning has also been carried out. As a next step, 1 mA operation is scheduled in February 2016. In parallel to the increase in beam current, a laser Compton scattering (LCS) system which can provide high-flux X-ray to a beamline has been successfully commissioned. We report recent progress in various kinds of beam tuning: improvement of electron gun performance, high bunch charge operation, mitigation of beam losses, LCS optics tuning and bunch compression for THz radiation.The 7th International Particle Accelerator Conference (IPAC2016

    Recent Developments and Operational Status of the Compact ERL at KEK

    No full text
    The Compact Energy Recovery Linac (cERL) at KEK is a test accelerator in order to develop key components to realize remarkable ERL performance as a future light source. After the beam commissioning in December 2013, the legal current limit has been increased step-by-step like 1 uA, 10 uA, and 100 uA. Survey for the source of beam losses has been conducted in each step, and the study on beam dynamics and tuning has also been carried out. As a next step, 1 mA operation is scheduled in February 2016. In parallel to the increase in beam current, a laser Compton scattering (LCS) system which can provide high-flux X-ray to a beamline has been successfully commissioned. We report recent progress in various kinds of beam tuning: improvement of electron gun performance, high bunch charge operation, mitigation of beam losses, LCS optics tuning and bunch compression for THz radiation
    corecore