16 research outputs found

    A Supporting System for Knowledge Creation Process

    Get PDF
    A knowledge management system, Knowledge Management System for Scientific Research Group (KMSSRG) is designed to facilitate knowledge creation within a scientific research group. Implementation issues of such a system are analyzed and discussed in this paper. The main feature of the KMSSRG is the support of Internal Knowledge Evolution Network (IKEN). We developed the IKEN by (1) using Ikujiro Nonaka’s SECI model to identify core sub-processes and related knowledge that are keys to knowledge creation, and (2) analyzing carefully the knowledge creation process for both individuals and teams. As a result, IKEN is a directed network that maps knowledge (both implicit and explicit knowledge) fragments created by different team members in various research activities. Context reference relationships among these knowledge fragments can also be represented

    Crustal evolution events in the Chinese continent: evidence from a zircon U-Pb database

    No full text
    The zircon U-Pb chronology database provides a good opportunity to obtain important zircon growth peak periods in the Earth's history so as to study the origin and evolution of the crust. It should be noted that research preference affects the objectivity of zircon sampling, leading to hot data in the database and age statistics. To evaluate the influence of hot data on statistical results, the W and Y indexes are introduced. Using a Gaussian model of multipeak fitting of zircon U-Pb age frequencies, we identify seven major growth peaks in zircons from the Chinese continental crust, which are 2498.95, 1855.82, 828.88, 444.29, 249.46, 131.96, and 58.21 Ma. Due to differences in the time scales of zircon growth peaks, these peaks can be divided into two categories: first-order zircon growth peaks (I) and second-order zircon growth peaks (II), which represent longer and shorter time scales, perhaps due to different kinds of geological dynamics, respectively. In addition, there are clear correspondences between these ages and various geological events recognized by most scholars, namely, the Wutai orogeny, Lvliang orogeny, Jinning orogeny, Caledonian orogeny, Indosinian orogeny, Yanshanian orogeny, and Himalayan orogeny, respectively

    Biocompatible pillararene-assembly-based carriers for dual bioimaging

    No full text
    Present research provides a successful example to use biocompatible pillararene-based assemblies for delivering mixed dyes in dual bioimaging. A series of tadpole-like and bola amphiphilic pillararenes 1–4 were synthesized by selectively employing water-soluble ethylene glycols and hydrophobic alkyl units as the starting materials. In comparison with their monomers, these amphiphilic pillararenes not only show improved biocompatibility to cells but also could form homogeneous supramolecular self-assemblies. Interestingly, different types of amphiphilic pillararene-based assemblies exhibit various performances on the delivery of dyes with different aqueous solubility. All assemblies can deliver water-soluble rhodamine B to cells, while only tadpole-like amphiphilic pillararene-based assemblies performed better on delivering hydrophobic fluorescein isothiocyanate for imaging. In addition, pillararene derivatives 1, 3, and 4 could complex with a viologen guest, further forming stable assemblies for bioimaging. In such cases, the assembly formed from the complex of tadpole-like amphiphile pillararene 1 with the viologen guest performed better in delivering mixed dyes. Finally, an anticancer drug, doxorubicin, was successfully delivered to cells by using the pillararene-based assemblies. The current research has determined the capacities of pillararene-based assemblies to deliver different dyes for bioimaging and paves the way for using these biocompatible carriers toward combined cancer therapy

    CEPC Technical Design Report -- Accelerator

    No full text
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s

    CEPC Technical Design Report -- Accelerator

    No full text
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s

    CEPC Technical Design Report -- Accelerator

    No full text
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s
    corecore