6 research outputs found

    Symbiosis of life-cycle structural design and asset management based on Building Information Modeling: Application for industrial facility equipment

    Get PDF
    In the last few years, particular focus has been devoted to the life cycle performance of fastening systems, which is reflected in increasing numbers of publications, standards and large-scale research efforts. Simultaneously, experience shows that in many cases, where fastening systems are implemented – such as industrial facilities – the design of fasteners is governed by fatigue loading under dynamic characteristics. In order to perform an adequate design and to specify the most efficient and appropriate fastening product, the engineer needs to access and process a broad range of technical and commercial information. Building information modelling (BIM), as a data management method in the construction industry, can supply such information and accommodate a comprehensive design and specification process. Furthermore, the application of BIM-based processes, such as the generation of a BIM-model, allows to use the important information for the construction as well as the life cycle management with different actions and time dependencies of the asset and its components. As a consequence, the BIM model offers the potential to correlate different data relevant for achieving the goals of the respective application, in order to ensure a more effective and correct design of the fastening. This paper demonstrates such a BIMbased design framework for an Industry 4.0 case, and in particular, the installation of a factory robot through post-installed anchors under fatigue-relevant loading in concrete

    A hybrid approach of modular Planning – synchronizing factory and building planning by using component based synthesis

    Get PDF
    The more and more rising complexity of the industrial environment is triggering companies in a way that is more challenging than ever before. Not only are factory planning projects difficult to handle because of the dynamics and complexity also the necessary planning of the accompanied building gets more and more difficult. To handle this complexity and reduce time and effort for planning as a major factor of success the mainly separately done planning aspects needs to be synchronized. This paper will show an approach of a hybrid factory-building planning method in order to be able to shorten planning time and effort. By using a constraint solving technique the necessary planning tasks are aligned partly automatically and will be processed as a useful planning workflow in form of a gantt diagram for the overall project management

    Adaption of the Level of Development to the Factory Layout Planning and Introduction of a Quality Assurance Process

    Get PDF
    Current developments and trends are causing an increasingly turbulent environment for manufacturing companies. In order to respond to these dynamic market conditions, products and thus also production systems have to be adapted more frequently and much faster. However, time and cost targets are often missed by classic factory planning approaches due to poor communication, inadequate tools, and lack of interfaces. Therefore, new ways have to be found in factory planning to overcome these problems. Building Information Modeling, which is already used in the construction industry, provides a promising method for the collaboration of stakeholders based on digital models. This would allow communication to be structured, new tools to be used, and interfaces to be stabilized to improve the target achievement in factory planning projects. However, which information should be provided in which level of detail in which phase of a factory planning project and how the quality of this information can be ensured has not yet been answered. A possible solution to these questions is addressed in this article. First, the concept of the so-called Level of Development, i.e. the geometric and non-geometric definition of the model contents, is transferred to factory layout planning. Then, based on two use cases, the process of quality assurance is defined

    Symbiosis of life-cycle structural design and asset management based on Building Information Modeling: Application for industrial facility equipment

    No full text
    In the last few years, particular focus has been devoted to the life cycle performance of fastening systems, which is reflected in increasing numbers of publications, standards and large-scale research efforts. Simultaneously, experience shows that in many cases, where fastening systems are implemented – such as industrial facilities – the design of fasteners is governed by fatigue loading under dynamic characteristics. In order to perform an adequate design and to specify the most efficient and appropriate fastening product, the engineer needs to access and process a broad range of technical and commercial information. Building information modelling (BIM), as a data management method in the construction industry, can supply such information and accommodate a comprehensive design and specification process. Furthermore, the application of BIM-based processes, such as the generation of a BIM-model, allows to use the important information for the construction as well as the life cycle management with different actions and time dependencies of the asset and its components. As a consequence, the BIM model offers the potential to correlate different data relevant for achieving the goals of the respective application, in order to ensure a more effective and correct design of the fastening. This paper demonstrates such a BIM-based design framework for an Industry 4.0 case, and in particular, the installation of a factory robot through post-installed anchors under fatigue-relevant loading in concrete