7,054 research outputs found

    Robust H1 control for a class of switched nonlinear systems

    Get PDF
    This article is concerned with the robust H1 control problem of a class of switched nonlinear systems with norm-bounded time-varying uncertainties. The system considered in this class is composed of two parts: a uncertain linear switched part and a nonlinear part, which is also switched systems. Under the circumstances, that the H1 control problem of all subsystems are not all solvable, the switched feedback control law and the switching law are designed using the average dwell-time method. The corresponding closed-loop switched system is exponentially stable and achieves a weighted L2-gain

    Study on Evaluation Error Character of Hydraulic Radius in Hydraulic Calculation

    Get PDF
    Source: ICHE Conference Archive - https://mdi-de.baw.de/icheArchiv

    Optimization and coordination of South-to-North Water Diversion supply chain with strategic customer behavior

    Get PDF
    AbstractThe South-to-North Water Diversion (SNWD) Project is a significant engineering project meant to solve water shortage problems in North China. Faced with market operations management of the water diversion system, this study defined the supply chain system for the SNWD Project, considering the actual project conditions, built a decentralized decision model and a centralized decision model with strategic customer behavior (SCB) using a floating pricing mechanism (FPM), and constructed a coordination mechanism via a revenue-sharing contract. The results suggest the following: (1) owing to water shortage supplements and the excess water sale policy provided by the FPM, the optimal ordering quantity of water resources is less than that without the FPM, and the optimal profits of the whole supply chain, supplier, and external distributor are higher than they would be without the FPM; (2) wholesale pricing and supplementary wholesale pricing with SCB are higher than those without SCB, and the optimal profits of the whole supply chain, supplier, and external distributor are higher than they would be without SCB; and (3) considering SCB and introducing the FPM help increase the optimal profits of the whole supply chain, supplier, and external distributor, and improve the efficiency of water resources usage
    • ā€¦
    corecore