63 research outputs found

    Maximizing the general success of cecal intubation during propofol sedation in a multi-endoscopist academic centre

    Get PDF
    <p>Abstract</p> <p>Background</p> <p>Achieving the target of 95% colonoscopy completion rate at centres conducting colorectal screening programs is an important issue. Large centres and teaching hospitals employing endoscopists with different levels of training and expertise risk achieving worse results. Deep sedation with propofol in routine colonoscopy could maximize the results of cecal intubation.</p> <p>Methods</p> <p>The present study on the experience of a single centre focused on estimating the overall completion rate of colonoscopies performed under routine propofol sedation at a large teaching hospital with many operators involved, and on assessing the factors that influence the success rate of the procedure and how to improve this performance, analyzing the aspects relating to using of deep sedation. Twenty-one endoscopists, classified by their level of specialization in colonoscopic practice, performed 1381 colonoscopies under deep sedation. All actions needed for the anaesthesiologist to restore adequate oxygenation or hemodynamics, even for transient changes, were recorded.</p> <p>Results</p> <p>The "crude" overall completion rate was 93.3%. This finding shows that with routine deep sedation, the colonoscopy completion rate nears, but still does not reach, the target performance for colonoscopic screening programs, at centers where colonoscopists of difference experience are employed in such programs.</p> <p>Factors interfering with cecal intubation were: inadequate colon cleansing, endoscopists' expertise in colonoscopic practice, patients' body weight under 60 kg or age over 71 years, and the need for active intervention by the anaesthesiologist. The most favourable situation - a patient less than 71 years old with a body weight over 60 kg, an adequate bowel preparation, a "highly experienced specialist" performing the test, and no need for active anaesthesiological intervention during the procedure - coincided with a 98.8% probability of the colonoscopy being completed.</p> <p>Conclusions</p> <p>With routine deep sedation, the colonoscopy completion rate nears the target performance for colonoscopic screening programs, at centers where colonoscopists of difference experience are employed in such programs. Organizing the daily workload to prevent negative factors affecting the success rate from occurring in combination may enable up to 85% of incomplete procedures to be converted into successful colonoscopies.</p

    Transcriptomic response of the red tide dinoflagellate, Karenia brevis, to nitrogen and phosphorus depletion and addition

    Get PDF
    <p>Abstract</p> <p>Background</p> <p>The role of coastal nutrient sources in the persistence of <it>Karenia brevis </it>red tides in coastal waters of Florida is a contentious issue that warrants investigation into the regulation of nutrient responses in this dinoflagellate. In other phytoplankton studied, nutrient status is reflected by the expression levels of N- and P-responsive gene transcripts. In dinoflagellates, however, many processes are regulated post-transcriptionally. All nuclear encoded gene transcripts studied to date possess a 5' <it>trans</it>-spliced leader (SL) sequence suggestive, based on the trypanosome model, of post-transcriptional regulation. The current study therefore sought to determine if the transcriptome of <it>K. brevis </it>is responsive to nitrogen and phosphorus and is informative of nutrient status.</p> <p>Results</p> <p>Microarray analysis of N-depleted <it>K. brevis </it>cultures revealed an increase in the expression of transcripts involved in N-assimilation (nitrate and ammonium transporters, glutamine synthetases) relative to nutrient replete cells. In contrast, a transcriptional signal of P-starvation was not apparent despite evidence of P-starvation based on their rapid growth response to P-addition. To study transcriptome responses to nutrient addition, the limiting nutrient was added to depleted cells and changes in global gene expression were assessed over the first 48 hours following nutrient addition. Both N- and P-addition resulted in significant changes in approximately 4% of genes on the microarray, using a significance cutoff of 1.7-fold and p ≤ 10<sup>-4</sup>. By far, the earliest responding genes were dominated in both nutrient treatments by pentatricopeptide repeat (PPR) proteins, which increased in expression up to 3-fold by 1 h following nutrient addition. PPR proteins are nuclear encoded proteins involved in chloroplast and mitochondria RNA processing. Correspondingly, other functions enriched in response to both nutrients were photosystem and ribosomal genes.</p> <p>Conclusions</p> <p>Microarray analysis provided transcriptomic evidence for N- but not P-limitation in <it>K. brevis</it>. Transcriptomic responses to the addition of either N or P suggest a concerted program leading to the reactivation of chloroplast functions. Even the earliest responding PPR protein transcripts possess a 5' SL sequence that suggests post-transcriptional control. Given the current state of knowledge of dinoflagellate gene regulation, it is currently unclear how these rapid changes in such transcript levels are achieved.</p

    Defining the Sister Rat Mammary Tumor Cell Lines HH-16 cl.2/1 and HH-16.cl.4 as an In Vitro Cell Model for Erbb2

    Get PDF
    Cancer cell lines have been shown to be reliable tools in genetic studies of breast cancer, and the characterization of these lines indicates that they are good models for studying the biological mechanisms underlying this disease. Here, we describe the molecular cytogenetic/genetic characterization of two sister rat mammary tumor cell lines, HH-16 cl.2/1 and HH-16.cl.4, for the first time. Molecular cytogenetic analysis using rat and mouse chromosome paint probes and BAC/PAC clones allowed the characterization of clonal chromosome rearrangements; moreover, this strategy assisted in revealing detected breakpoint regions and complex chromosome rearrangements. This comprehensive cytogenetic analysis revealed an increase in the number of copies of the Mycn and Erbb2 genes in the investigated cell lines. To analyze its possible correlation with expression changes, relative RNA expression was assessed by real-time reverse transcription quantitative PCR and RNA FISH. Erbb2 was found to be overexpressed in HH-16.cl.4, but not in the sister cell line HH-16 cl.2/1, even though these lines share the same initial genetic environment. Moreover, the relative expression of Erbb2 decreased after global genome demethylation in the HH-16.cl.4 cell line. As these cell lines are commercially available and have been used in previous studies, the present detailed characterization improves their value as an in vitro cell model. We believe that the development of appropriate in vitro cell models for breast cancer is of crucial importance for revealing the genetic and cellular pathways underlying this neoplasy and for employing them as experimental tools to assist in the generation of new biotherapies

    Delivering better outcomes through customer-led project management: the case of the major project BT 21st Century Network in the UK

    Get PDF
    Traditional approaches of major project management take the strategy of selecting a supplier-led prime/systems integrator. Although this strategy pushes a significant amount of risk to the supplier, project performance may suffer due to lower engagement of the customer in the anticipation of potential issues involving a major project. Thus, this research investigates the implications of the customer, as opposed to a selected external supplier, assuming the role of systems/prime integrator, as a Problem Structuring Method (PSM) to better deal with the soft side and uncertainties of the project. A case study approach is conducted on the major project BT 21st Century Network (BT21CN) to demonstrate that customer-led systems integration projects may provide more balance in the relationship and distribution of risks between supplier and customer, having a positive impact on project performance, accelerating the development of BT’s organisational capabilities, and producing better project outcomes in the long term
    corecore