    The Interconnections of the LHC Cryomagnets

    Get PDF
    The main components of the LHC, the next world-class facility in high-energy physics, are the twin-aperture high-field superconducting cryomagnets to be installed in the existing 26.7-km long tunnel. After installation and alignment, the cryomagnets have to be interconnected. The interconnections must ensure the continuity of several functions: vacuum enclosures, beam pipe image currents (RF contacts), cryogenic circuits, electrical power supply, and thermal insulation. In the machine, about 1700 interconnections between cryomagnets are necessary. The interconnections constitute a unique system that is nearly entirely assembled in the tunnel. For each of them, various operations must be done: TIG welding of cryogenic channels (~ 50 000 welds), induction soldering of main superconducting cables (~ 10 000 joints), ultrasonic welding of auxiliary superconducting cables (~ 20 000 welds), mechanical assembly of various elements, and installation of the multi-layer insulation (~ 200 000 m2). Defective junctions could be very difficult and expensive to detect and repair. Reproducible and reliable processes must be implemented together with a strict quality control. The interconnection activities are optimized taking into account several constraints: limited space availability, tight installation schedule, high level of quality, high reliability and economical aspects. In this paper, the functions to be fulfilled by the interconnections and the various technologies selected are presented. Quality control at different levels (component/ interconnect, subsystem, system) is also described. The interconnection assembly sequences are summarized. Finally, the validation of the interconnection procedures is presented, based in particular on the LHC prototype cell assembly (STRING2)

    The Interconnections of the LHC Cryomagnets at CERN: Strategy Applied and First Results of the Industrialization Process

    Get PDF
    The final interconnections of the LHC superconducting magnets in the underground tunnel are performed by a contractor on a result-oriented basis. A consortium of firms was awarded the contract after competitive tendering based on a technical and commercial specification. The implementation of the specific technologies and tooling developed and qualified by CERN has required an important effort to transfer the know-how and implement the follow-up of the contractor. This paper summarizes the start-up phase and the difficulties encountered. The organization and management tools put in place during the ramping-up phase are presented. In addition to contractual adaptations of the workforce, several configuration changes to the workflows were necessary to reach production rates compatible with the overall schedule and with the different constraints: availability of magnets, co-activities with magnets transport and alignment, handling of non-conformities, etc. Also the QA procedures underwent many changes to reach the high level of quality mandatory to ensure the LHC performance. The specificities of this worksite are underlined and first figures of merit of the learning process are presented

    Qualification and Start of Production of the Ultrasonic Welding Machines for the LHC Interconnections

    Get PDF
    The Large Hadron Collider (LHC) is presently under installation at CERN, Geneva. The approximately 4000 superconducting corrector magnets required by the machine are powered through copper-stabilized Nb-Ti busbars. To interconnect the magnets along the machine, about 50 000 joints between superconducting cables rated at 600 A have to be performed in-situ during the interconnection activities. An ultrasonic welding technique has been developed and optimised by CERN which led to the development of a dedicated machine which was qualified during the assembly of the STRING II, a 110-m chain of cryomagnets assembled as a prototype of the LHC. The realization of the â series â interconnections together with the procurement of the tooling based on functional specifications have been contracted to a consortium of firms. Qualification tests and acceptance criteria in terms of electrical contact resistance, mechanical resistance, reliability and reproducibility have been defined by CERN. This paper presents the tests and some results of the qualification process relevant to the industrialized tooling provided by the contractor. Results of pre-series junctions done in the LHC tunnel are presented together with the perspective for the continuation of the work

    Preference for sites within plant by larvae of the cabbage webworm, Hellula undalis (Fabr.)(Lep., Pyralidae)

    Get PDF
    A comparative study on the cabbage webworm (CWW), Hellula undalis, with respect to larvae feeding either on the shoot or leaf of cabbage was carried out both in the laboratory and in the field. For the first 2 days after eclosion from the egg, a CWW larva would tend to remain within the mine in the leaf where the egg was deposited. The Lloyd patchiness index (x*/x) suggested that the larval distribution was contagious, although the degree of contagiousness tended to decrease as the larvae grew due to their dispersal movement. This was indicated by the inter-plant larval movement study, in which most of these larvae were found in the shoot: 84.6% on the source plant and 40% on the neighbouring plants by the ninth day of experiment. For the larvae that fed on the shoot, the duration of the larval and pupal stages were significantly shorter and adult longevity was significantly longer, although the females laid a significantly lower number of eggs than those from larvae that fed on the leaves. However, there were no differences in the size of adults reared either on the shoot or the leaves (body lengths were 7.96 ± 0.12 and 7.82 ± 0.08 mm, respectively), and in the survivorship patterns of the adults. The moths emerging from larvae collected from the cabbage shoot in the field also lived slightly longer but laid fewer eggs than those from the leaves, with the intrinsic rate of increase (rm) of 0.11 and 0.07, respectively. The results indicated that the CWW larvae preferred the cabbage shoot (to the leaves) which provides a natural refuge and protection for the CWW larva under field conditions, although it is relatively a poorer food type (3.47 ± 0.17% nitrogen) than the leaf (4.31 ± 0.30% nitrogen) (P < 0.05). The higher fertility of CWW bred from the leaves could possibly be related to the relatively higher percentage nitrogen in the leaves. After eclosion from the eggs, there was initial grouping of larvae in the shoot, and then an eventual decrease which could be due to the limited carrying capacity of the shoot to accommodate more than one larva

    Copper Heat Exchanger for the External Auxiliary Bus-Bars Routing Line in the LHC Insertion Regions

    Get PDF
    The corrector magnets and the main quadrupoles of the LHC dispersion suppressors are powered by a special superconducting line (called auxiliary bus-bars line N), external to the cold mass and housed in a 50 mm diameter stainless steel tube fixed to the cold mass. As the line is periodically connected to the cold mass, the same gaseous and liquid helium cools both the magnets and the line. The final sub-cooling process (from around 4.5 K down to 1.9 K) consists in the phase transformation from liquid to superfluid helium. Heat is extracted from the line through the magnets via their point of junction. In dispersion suppressor zones, approximately 40 m long, the sub-cooling of the line is slightly delayed with respect to the magnets. This might have an impact on the readiness of the accelerator for operation. In order to accelerate the process, a special heat exchanger has been designed. It is located in the middle of the dispersion suppressor portion of the line. Its main function consists in providing a local point of heat extraction, creating two additional lambda fronts that propagate in opposite directions towards the extremities of the line. Both the numerical model and the sub-cooling analysis are presented in the paper for different configurations of the line. The design, manufacturing and integration aspects of the heat exchanger are described

    Natural enemies for the cabbage webworm, Hellula undalis (Fabr.)(Lepidoptera: Pyralidae) in Malaysia

    Get PDF
    Four species of larval parasitoids were reared from larvae of the cabbage webworm (CWW), Hellula undalis (Fabr.) (Pyralidae: Glaphyriinae) collected from various cruciferous plants and a capparidaceous weed, Cleome rutidosperma (DC). On cabbage, only two species were record­ ed, viz, Bassus sp. (Braconidae) and Trathala flavoorbitalis (Cam.) (Ichneumonidae). The other parasitoids were braconids, Che/onus sp. and Phanerotoma sp. Egg or pupal parasitoids were not recorded. The parasitoids were not an important mortality factor of CWW on cabbage because they were usually present at the end of the crop season and their numbers were generally low. On the other hand, predator-exclusion experiments indicated that predators were important in determining the density of CWW on cabbage and the within-generation survival in the field. The major predator was the fire-ant, Solenopsis geminata (F.), which foraged on the prepupae and pupae

    Prevalence and risk factors of geohelminthiasis among the rural village children in Kota Marudu, Sabah, Malaysia

    Get PDF
    Geohelminthiasis is a worldwide problem, especially in low-income countries. Children from rural areas and those living in poverty, lacking basic health amenities and having poor environmental sanitation are likely to be affected. Adverse effects such as anemia, protein malnutrition, colitis are common which can affect both the children’s physical and mental growing development. A cross-sectional study on geohelminthiasis was conducted among children from 238 households in 13 villages in Kota Marudu of northern Sabah, East Malaysia. The study involved interviewing villagers using questionnaires to collect demographic and socio-economic data, getting faecal samples from the children, collecting soil samples and identifying parasite eggs with microscopy and molecular methods. A total of 407 children (6 months-17 years old) enrolled in the study. Geohelminthiasis was detected in the faecal samples of children from 54% (7/13) of the villages with mean prevalence of infection per village of 9.0% (0%-34.9%). On a household basis, 18% (43/238) of the households sampled had infected children, with mean prevalence rate per household of 11% (0%-43%). The prevalence was for Ascaris lumbricoides: 9.6% (39/407), Trichuris trichiura: 2.7% (11/ 407) and hookworms (Necator americanus and Ancylostoma sp.): 2.7% (11/407). The overall mean infection rate of the children examined was 14.3%. Significantly higher prevalence was recorded for the children of mothers who did not have any formal education (p = 0.003); household income of less than USD119 (RM500) (p<0.001); children from homes without proper sanitation facilities (p<0.001); children who usually go about barefoot (p<0.001) and not washing feet before entering the house (p = 0.017). Soil samples were found to have geohelminth eggs or larvae which could be due to unhygienic sanitation practices. This study shows the geohelminthiasis is prevalent in the villages, and the risk factors are lack of maternal education, low income, poor sanitation facilities and irregular deworming practice. Expanding deworming coverage in the study region may help reduce the worm infections in these communities, so that the mental and physical development of the children would not be affected by geohelminthiasis. The data on the prevalence of geohelminthiasis in this study would contribute to better public health monitoring and operation to reduce the infection in rural areas

    The Quality Control of the LHC Continuous Cryostat Interconnections

    Get PDF
    The interconnections between the Large Hadron Collider (LHC) magnets have required some 40 000 TIG welded joints and 65 000 electrical splices. At the level of single joints and splices, non-destructive techniques find limited application: quality control is based on the qualification of the process and of operators, on the recording of production parameters and on production samples. Visual inspection and process audits were the main techniques used. At the level of an extended chain of joints and splices - from a 53.5 m half-cell to a complete 2.7 km arc sector - quality control is based on vacuum leak tests, electrical tests and RF microwave reflectometry that progressively validated the work performed. Subsequent pressure tests, cryogenic circuits flushing with high pressure helium and cool-downs revealed a few unseen or new defects. This paper presents an overview of the quality control techniques used, seeking lessons applicable to similar large, complex projects

    The LHC Continuous Cryostat Interconnections: The Organization of a Logistically Complex Worksite Requiring Strict Quality Standards and High Output

    Get PDF
    The interconnections of the Large Hadron Collider (LHC) continuous cryostat have been completed in fall 2007: 1695 interconnections magnet to magnet and 224 interconnections between the continuous cryostat and the cryogenic distribution line have been executed along the 27 km of the LHC. The very tight schedule, the complexity of the interconnection sequence, the strict quality standards applied have required the creation of an ad hoc organization in order to steer and coordinate the activities on the worksite dispersed along the whole accelerator ring. The concatenation of construction and test phases carried out by CERN staff, CERN collaborating institutes and contractors have led to the necessity of a common approach and of a very effective information flow. In this paper, after having recalled the main technical challenges, we review the organizational choices that have been taken and we briefly analyze the development of the worksite in term of allocated resources and production

    The Special LHC Interconnections: Technologies, Organization and Quality Control

    Get PDF
    In addition to the standard interconnections (IC) of the continuous cryostat of the Large Hadron Collider (LHC), there exists a variety of special ones related to specific components and assemblies, such as cryomagnets of the insertion regions, electrical feedboxes and superconducting links. Though they are less numerous, their specificities created many additional IC types, requiring a larger variety of assembly operations and quality control techniques, keeping very high standards of quality. Considerable flexibility and adaptability from all the teams involved (CERN staff, collaborating institutes, contractors) were the key points to ensure the success of this task. This paper first describes the special IC and presents the employed technologies which are generally adapted from the standard work. Then, the organization adopted for this non-repetitive work is described. Examples of non-conformities that were resolved are also discussed. Figures of merit in terms of quality and productivity are given and compared with standard IC wor
    • …