32 research outputs found

    The First Result of Global Commissioning of the ATLAS Endcap Muon Trigger System in ATLAS Cavern

    Get PDF
    We report on the ATLAS commissioning run from the view point of the Thin Gap Chamber (TGC), which is the ATLAS end cap muon trigger detector. All the TGC sectors with on-detector electronics are going to be installed to the ATLAS cavern by the end of September 2007. To integrate all sub-detectors before the physics run starting from early 2008, the global commissioning run together with other sub-detectors has been performed from June 2007. We have evaluated the performance of the complete trigger chain of the TGC electronics and provide the trigger signal using cosmic-ray to the sub-systems in the global run environment

    Final Test at the Surface of the ATLAS Endcap Muon Trigger Chamber Electronics

    Get PDF
    For the detector commissioning planned in 2007, sector assembly of the ATLAS muon-endcap trigger chambers and final test at the surface for the assembled electronics are being done in CERN and almost completed. For the test, we built up the Data Acquisition (DAQ) system using test pulse of two types and cosmic rays in order to check functionality of the various aspects of the electronics mounted on a sector. So far, 99% of all 320,000 channels have been tested and most of them were installed into the ATLAS cavern. In this presentation, we will describe the DAQ systems and mass-test procedure in detail, and report the result of electronics test with some actual experience

    Status of the ATLAS Level-1 Central Trigger and Muon Barrel Trigger and First Results from Cosmic-Ray Data

    Get PDF
    The ATLAS detector at CERN's Large Hadron Collider (LHC) will be exposed to proton-proton collisions from beams crossing at 40~MHz. A three-level trigger system will select potentially interesting events in order to reduce the read-out rate to about 200 Hz. The first trigger level is implemented in custom-built electronics and makes an initial fast selection based on detector data of coarse granularity. It has to reduce the rate by a factor of 10410^4 to less than 100~kHz. The other two consecutive trigger levels are in software and run on PC farms. We present an overview of the first-level central trigger and the muon barrel trigger system and report on the current installation status. Moreover, we show analysis results of cosmic-ray data recorded in situ at the ATLAS experimental site with final or close-to-final hardware

    Orientia tsutsugamushi in Human Scrub Typhus Eschars Shows Tropism for Dendritic Cells and Monocytes Rather than Endothelium

    Get PDF
    Scrub typhus is a common and underdiagnosed cause of febrile illness in Southeast Asia, caused by infection with Orientia tsutsugamushi. Inoculation of the organism at a cutaneous mite bite site commonly results in formation of a localized pathological skin reaction termed an eschar. The site of development of the obligate intracellular bacteria within the eschar and the mechanisms of dissemination to cause systemic infection are unclear. Previous postmortem and in vitro reports demonstrated infection of endothelial cells, but recent pathophysiological investigations of typhus patients using surrogate markers of endothelial cell and leucocyte activation indicated a more prevalent host leucocyte than endothelial cell response in vivo. We therefore examined eschar skin biopsies from patients with scrub typhus to determine and characterize the phenotypes of host cells in vivo with intracellular infection by O. tsutsugamushi, using histology, immunohistochemistry, double immunofluorescence confocal laser scanning microscopy and electron microscopy. Immunophenotyping of host leucocytes infected with O. tsutsugamushi showed a tropism for host monocytes and dendritic cells, which were spatially related to different histological zones of the eschar. Infected leucocyte subsets were characterized by expression of HLADR+, with an “inflammatory” monocyte phenotype of CD14/LSP-1/CD68 positive or dendritic cell phenotype of CD1a/DCSIGN/S100/FXIIIa and CD163 positive staining, or occasional CD3 positive T-cells. Endothelial cell infection was rare, and histology did not indicate a widespread inflammatory vasculitis as the cause of the eschar. Infection of dendritic cells and activated inflammatory monocytes offers a potential route for dissemination of O. tsutsugamushi from the initial eschar site. This newly described cellular tropism for O. tsutsugamushi may influence its interaction with local host immune responses

    The ATLAS Trigger/DAQ Authorlist, version 1.0

    Get PDF
    This is a reference document giving the ATLAS Trigger/DAQ author list, version 1.0 of 20 Nov 2008

    The ATLAS trigger - high-level trigger commissioning and operation during early data taking

    Get PDF
    The ATLAS experiment is one of the two general-purpose experiments due to start operation soon at the Large Hadron Collider (LHC). The LHC will collide protons at a centre of mass energy of 14~TeV, with a bunch-crossing rate of 40~MHz. The ATLAS three-level trigger will reduce this input rate to match the foreseen offline storage capability of 100-200~Hz. This paper gives an overview of the ATLAS High Level Trigger focusing on the system design and its innovative features. We then present the ATLAS trigger strategy for the initial phase of LHC exploitation. Finally, we report on the valuable experience acquired through in-situ commissioning of the system where simulated events were used to exercise the trigger chain. In particular we show critical quantities such as event processing times, measured in a large-scale HLT farm using a complex trigger menu

    The ATLAS Trigger/DAQ Authorlist, version 2.0

    Get PDF
    This is the ATLAS Trigger/DAQ Authorlist, version 2.0, 31 July 200

    The ATLAS Trigger/DAQ Authorlist, version 3.1

    Get PDF
    This is the ATLAS Trigger/DAQ Authorlist, version 3.1, 17 September 200

    The ATLAS Trigger/DAQ Authorlist, version 3.0

    Get PDF
    This is the ATLAS Trigger/DAQ Authorlist, version 3.0, 11 September 200

    A second peak of egg excretion in Strongyloides ratti

    No full text
    corecore