147 research outputs found

    Insertion Magnets

    Full text link
    Chapter 3 in High-Luminosity Large Hadron Collider (HL-LHC) : Preliminary Design Report. The Large Hadron Collider (LHC) is one of the largest scientific instruments ever built. Since opening up a new energy frontier for exploration in 2010, it has gathered a global user community of about 7,000 scientists working in fundamental particle physics and the physics of hadronic matter at extreme temperature and density. To sustain and extend its discovery potential, the LHC will need a major upgrade in the 2020s. This will increase its luminosity (rate of collisions) by a factor of five beyond the original design value and the integrated luminosity (total collisions created) by a factor ten. The LHC is already a highly complex and exquisitely optimised machine so this upgrade must be carefully conceived and will require about ten years to implement. The new configuration, known as High Luminosity LHC (HL-LHC), will rely on a number of key innovations that push accelerator technology beyond its present limits. Among these are cutting-edge 11-12 tesla superconducting magnets, compact superconducting cavities for beam rotation with ultra-precise phase control, new technology and physical processes for beam collimation and 300 metre-long high-power superconducting links with negligible energy dissipation. The present document describes the technologies and components that will be used to realise the project and is intended to serve as the basis for the detailed engineering design of HL-LHC.Comment: 19 pages, Chapter 3 in High-Luminosity Large Hadron Collider (HL-LHC) : Preliminary Design Repor

    Assembly and Test of a Support Structure for 3.6 m Long Nb3Sn Racetrack Coils”,

    Get PDF
    Abstract-The LHC Accelerator Research Program (LARP) is currently developing 4 m long Nb 3 Sn quadrupole magnets for a possible upgrade of the LHC Interaction Regions (IR). In order to provide a reliable test bed for the fabrication and test of long Nb 3 Sn coils, LARP has started the development of the long racetrack magnet LRS01. The magnet is composed of two 3.6 m long racetrack coils contained in a support structure based on an aluminum shell pre-tensioned with water-pressurized bladders and interference keys. For the phase-one test of the assembly procedure and loading operation, the structure was pre-stressed at room temperature and cooled down to 77 K with instrumented, solid aluminum "dummy coils". Mechanical behavior and stress homogeneity were monitored with strain gauges mounted on the shell and the dummy coils. The dummy coils were replaced with reacted and impregnated Nb 3 Sn coils in a second assembly procedure, followed by cool-down to 4.5 K and powered magnet test. This paper report on the assembly and loading procedures of the support structure as well as the comparison between strain gauge data and 3D model predictions

    Challenges and Lessons Learned from fabrication, testing and analysis of eight MQXFA Low Beta Quadrupole magnets for HL-LHC

    Full text link
    By the end of October 2022, the US HL-LHC Accelerator Upgrade Project (AUP) had completed fabrication of ten MQXFA magnets and tested eight of them. The MQXFA magnets are the low beta quadrupole magnets to be used in the Q1 and Q3 Inner Triplet elements of the High Luminosity LHC. This AUP effort is shared by BNL, Fermilab, and LBNL, with strand verification tests at NHMFL. An important step of the AUP QA plan is the testing of MQXFA magnets in a vertical cryostat at BNL. The acceptance criteria that could be tested at BNL were all met by the first four production magnets (MQXFA03-MQXFA06). Subsequently, two magnets (MQXFA07 and MQXFA08) did not meet some criteria and were disassembled. Lessons learned during the disassembly of MQXFA07 caused a revision to the assembly specifications that were used for MQXFA10 and subsequent magnets. In this paper, we present a summary of: 1) the fabrication and test data of all the MQXFA magnets; 2) the analysis of MQXFA07/A08 test results with characterization of the limiting mechanism; 3) the outcome of the investigation, including the lessons learned during MQXFA07 disassembly; and 4) the finite element analysis correlating observations with test performance
    • …
    corecore