284 research outputs found

    Report from the WG-2 of the LUMI-05 workshop scenarios for the injector complex upgrade

    Get PDF
    The LUMI-05 workshop was held in Arcidosso (Italy) from August 31st to September 3rd, gathering about 40 participants. The scope of the workshop was to explore scenarios for the LHC luminosity upgrade, with particular emphasis on LHC IR layouts with lower β* and on new high energy injectors for increasing the beam intensity. These topics were discussed by two separate working groups, the first one (WG-1) mainly dealing with the LHC IR Upgrade, and the second one (WG-2) on High Energy Injectors. This note reports about activities and conclusions of WG-2

    Crystal-based collimation in modern hadron colliders

    Get PDF

    Possible scenarios for the LHC injector upgrade

    Get PDF
    The possible upgrade of the LHC injector chain is a crucial step towards the LHC luminosity upgrade beyond 1034 cm-2s-1. It is also a mandatory requirement for the LHC energy upgrade well beyond the ultimate value of 7.56 TeV per beam. By pushing the accelerator parameters to the ultimate performance we can increase to 1.7Ă—1011 the bunch population and eventually reach a peak luminosity of 2.3Ă—1034 cm-2s-1. To go beyond, a considerable improvement of the LHC parameters, such as Ăź*, beam intensity, bunch length, number of circulating bunches is required. Finally, the upgrade of the injector complex and of the injection energy is another important ingredient to upgrade both peak and integrated luminosity up to an order of magnitude above the nominal value

    Injector upgrade: Dicussion and synthesis

    Get PDF
    We summarize the discussion on merits and drawbacks of various options for the injector upgrade, brought up at the second-to-last day of the LUMI06 workshop, notably the comparison of a normal-conducting and superconducting PS successor (PS2 and PS2+), items related to the SPS, and aspects of space-charge compensation

    CARE-HHH-APD Workshop on Interaction Regions for the LHC Upgrade, DAFNE, and SuperB

    Get PDF
    This report contains the Proceedings of the CARE-HHH-APD Mini-Workshop “IR’07,” which was held in Frascati, Italy, from 7 to 9 November 2007. The central theme of the IR’07 Mini-Workshop was the upgrade of the LHC interaction region (IR). A second topic was the experience with the upgraded DAFNE IR as well as the ongoing plans and studies for SuperB, plus possible applications of crab-waist collisions for the LHC upgrade. Discussions during the workshop addressed the performance and limitations of the IR-upgrade optics performance, the optimization of new LHC triplet magnets, the US-LARP magnet strategy (response to Lucio Rossi’s “challenge”), heat deposition, earlyseparation dipoles, detector-integrated quadrupoles, strategy for crab cavities, beam–beam wire compensators, and crab-waist collisions. At IR’07 all auxiliary systems, e.g. wires and crab cavities, received a strong boost. Energy deposition was shown to add an important criterion to the optics requirements—in a first attempt a 2-cm thick stainless-steel liner was considered; more realistic configurations will need to be explored in the future. Improved upgrade designs presented at IR’07 promise higher and better luminosity than earlier scenarios. Some remaining uncertainties for Nb3_{3}Sn magnets were identified, for example concerning field quality and temperature margin. Only two IR upgrade optics versions were retained from a larger number of earlier proposals, namely the so-called “low β-max” and “symmetric” optics. Conflicting time scales were evidenced: the accelerator input to the experiments is requested almost immediately, while the experiments require first LHC physics results to determine the boundary conditions for the accelerator upgrade. Finally, IR07 confirmed the three principal LHC high-luminosity upgrade paths: early separation, full crab crossing, and large Piwinski-angle scheme

    IR ranking proposal and new beam parameter sets for the LHC upgrade: the view of HHH

    Get PDF
    We propose a ranking for the interaction-region (IR) optics based on the presentations and results from the first two days of the LUMI’06 workshop

    LHC Phase-2 upgrade scenarios

    Get PDF

    Summary of CARE-HHH IR’07

    Get PDF
    We summarize the highlights and main conclusions of the CARE-HHH-APD mini-workshop on the LHC Interaction Region (IR) upgrade “IR’07” held in Frascati from the 7th to the 9th of November 2007
    • …
    corecore