3 research outputs found

    Polish Carpathians

    Get PDF
    Ramps and Fishway

    Numerical 2D Simulation of Morphological Phenomena of a Block Ramp in Poniczanka stream: Polish Carpathians

    Get PDF
    Description of flow in streams is a very complex problem. Physical analyses of this phenomenon provide a quantitative description of water flow, allowing creating mathematical models having practical meaning. Fast development of programs has improved their practical implementations, so the results of analyses and solutions of flow problems in both open channels and pipes, obtained through numerical modelling, can be applied in practical solutions. Numerical models are often very useful in studies covering a wide range of analyzed parameters. However one must understand that the similarity between a real river and its model could only be partially verified. The main purpose of this paper is to investigate the effect of the selected boulder block ramp hydraulic structure on Poniczanka stream on sediment transport, using the numerical model CCHE2D, assuming several situations, depending on the type of the river bed (erodible, non-erodible, rocky) and kind of rock blocks used for hydraulic structure construction. The obtained results were compared with the Hjulström graph, which is a classic approach for the identification of fluvial processes in the river channel (erosion, sedimentation, transport). In addition to these two methods, field observations were carried out which included the determination of changes in the horizontal and vertical changes of the riverbed morphology of the examined section river reach. The obtained results allowed determining the compatibility of these three methods for evaluation of sediment transport rate of river bed material in the analyzed sections of Poniczanka stream which are engineered with boulder block ramp hydraulic structures (BBR)

    Applying fluvial geomorphological riffle-pool sequences concept when rebuilding the existing drop hydraulic structure

    No full text
    The paper deals with the problem of  rebuilding  the existing water straight drop  structure in Brenna on the Brennica river (Polish Carpathian mountains), which was changed into the rapid hydraulic structure. The technical project was set up in 1988 and finished in the same year. The structure was rebuilt in the field in the early autumn of 1990. One of the concepts of applied fluvial geomorphological solution was used to improve the river channel bed condition. In that case it was found that the existing hydraulic structure reducing river slope and stabilizing river bed can be changed without any harm in to semi-natural riffle structure which could be tolerated by river and organisms living in.  Artificial roughness of the slope plate of the rapid hydraulic structure was obtained by placing cobbles along all the slope apron of the structure. The diameter of cobbles was calculated applying various methods, and the optimum value for that dimension was chosen. The cobbles, used for rebuilding purposes, were taken directly from the riverbed, so that the structure is environmentally similar to the site. All work was done due to European Framework Directive for Rivers.</p
    corecore