10 research outputs found

    Serial measurement of global longitudinal strain among women with breast cancer treated with proton radiation therapy : a prospective trial for 70 patients

    No full text
    Purpose: Conventional photon radiation therapy (RT) for breast cancer is associated with a reduction in global longitudinal strain (GLS) and an increase in troponin, N-terminal pro hormone B-type natriuretic peptide (NT-proBNP), and incident heart failure. The cardiac radiation exposure with proton-RT is much reduced and thus may be associated with less cardiotoxicity. The objective was to test the effect of proton-RT on GLS, troponin, and NT-proBNP. Methods and Materials: We conducted a prospective, observational, single-center study of 70 women being treated with proton-RT for breast cancer. Serial measurements of GLS, high-sensitivity troponin I, and NT-proBNP were performed at prespecified intervals (before proton-RT, 4 weeks after completion of proton-RT, and again at 2 months after proton-RT). Results: The mean age of the patients was 46 ± 11 years, and the mean body mass index was 25.6 ± 5.2 kg/m2; 32% of patients had hypertension, and the mean radiation doses to the heart and the left ventricle (LV) were 0.44 Gy and 0.12 Gy, respectively. There was no change in left ventricular ejection fraction (65 ± 5 vs 66 ± 5 vs 64 ± 4%; P = .15), global GLS (–21.7 ± 2.7 vs –22.7 ± 2.3 vs –22.8 ± 2.1%; P = .24), or segmental GLS from before to after proton-RT. Similarly, there was no change in either high-sensitivity troponin or NT-proBNP with proton-RT. However, in a post hoc subset analysis, women with hypertension had a greater decrease in GLS after proton-RT compared with women without hypertension (–21.3 ± 3.5 vs –24.0 ± 2.4%; P = .006). Conclusions: Proton-RT did not affect LV function and was not associated with an increase in biomarkers. These data support the potential cardiac benefits of proton-RT compared with conventional RT

    ACC/AATS/AHA/ASE/EACTS/HVS/SCA/SCAI/SCCT/SCMR/STS 2017 Appropriate Use Criteria for the Treatment of Patients With Severe Aortic Stenosis: A Report of the American College of Cardiology Appropriate Use Criteria Task Force, American Association for Thoracic Surgery, American Heart Association, American Society of Echocardiography, European Association for Cardio-Thoracic Surgery, Heart Valve Society, Society of Cardiovascular Anesthesiologists, Society for Cardiovascular Angiography and Intervent

    No full text
    The American College of Cardiology collaborated with the American Association for Thoracic Surgery, American Heart Association, American Society of Echocardiography, European Association for Cardio-Thoracic Surgery, Heart Valve Society, Society of Cardiovascular Anesthesiologists, Society for Cardiovascular Angiography and Interventions, Society of Cardiovascular Computed Tomography, Society for Cardiovascular Magnetic Resonance, and Society of Thoracic Surgeons to develop and evaluate Appropriate Use Criteria (AUC) for the treatment of patients with severe aortic stenosis (AS). This is the first AUC to address the topic of AS and its treatment options, including surgical aortic valve replacement (SAVR) and transcatheter aortic valve replacement (TAVR). A number of common patient scenarios experienced in daily practice were developed along with assumptions and definitions for those scenarios, which were all created using guidelines, clinical trial data, and expert opinion in the field of AS. The 2014 AHA/ACC guideline for the management of patients with valvular heart disease: a report of the American College of Cardiology/American Heart Association Task Force on Practice Guidelines(1) and its 2017 focused update paper (2) were used as the primary guiding references in developing these indications. The writing group identified 95 clinical scenarios based on patient symptoms and clinical presentation, and up to 6 potential treatment options for those patients. A separate, independent rating panel was asked to score each indication from 1 to 9, with 1-3 categorized as "Rarely Appropriate," 4-6 as "May Be Appropriate," and 7-9 as "Appropriate." After considering factors such as symptom status, left ventricular (LV) function, surgical risk, and the presence of concomitant coronary or other valve disease, the rating panel determined that either SAVR or TAVR is Appropriate in most patients with symptomatic AS at intermediate or high surgical risk; however, situations commonly arise in clinical practice in which the indications for SAVR or TAVR are less clear, including situations in which 1 form of valve replacement would appear reasonable when the other is less so, as do other circumstances in which neither intervention is the suitable treatment option. The purpose of this AUC is to provide guidance to clinicians in the care of patients with severe AS by identifying the reasonable treatment and intervention options available based on the myriad clinical scenarios with which patients present. This AUC document also serves as an educational and quality improvement tool to identify patterns of care and reduce the number of rarely appropriate interventions in clinical practice

    Strategies and performance of the CMS silicon tracker alignment during LHC Run 2

    No full text
    The strategies for and the performance of the CMS silicon tracking system alignment during the 2015–2018 data-taking period of the LHC are described. The alignment procedures during and after data taking are explained. Alignment scenarios are also derived for use in the simulation of the detector response. Systematic effects, related to intrinsic symmetries of the alignment task or to external constraints, are discussed and illustrated for different scenarios

    Development of the CMS detector for the CERN LHC Run 3

    No full text
    Since the initial data taking of the CERN LHC, the CMS experiment has undergone substantial upgrades and improvements. This paper discusses the CMS detector as it is configured for the third data-taking period of the CERN LHC, Run 3, which started in 2022. The entire silicon pixel tracking detector was replaced. A new powering system for the superconducting solenoid was installed. The electronics of the hadron calorimeter was upgraded. All the muon electronic systems were upgraded, and new muon detector stations were added, including a gas electron multiplier detector. The precision proton spectrometer was upgraded. The dedicated luminosity detectors and the beam loss monitor were refurbished. Substantial improvements to the trigger, data acquisition, software, and computing systems were also implemented, including a new hybrid CPU/GPU farm for the high-level trigger

    Development of the CMS detector for the CERN LHC Run 3

    No full text
    International audienceSince the initial data taking of the CERN LHC, the CMS experiment has undergone substantial upgrades and improvements. This paper discusses the CMS detector as it is configured for the third data-taking period of the CERN LHC, Run 3, which started in 2022. The entire silicon pixel tracking detector was replaced. A new powering system for the superconducting solenoid was installed. The electronics of the hadron calorimeter was upgraded. All the muon electronic systems were upgraded, and new muon detector stations were added, including a gas electron multiplier detector. The precision proton spectrometer was upgraded. The dedicated luminosity detectors and the beam loss monitor were refurbished. Substantial improvements to the trigger, data acquisition, software, and computing systems were also implemented, including a new hybrid CPU/GPU farm for the high-level trigger

    Development of the CMS detector for the CERN LHC Run 3

    No full text
    International audienceSince the initial data taking of the CERN LHC, the CMS experiment has undergone substantial upgrades and improvements. This paper discusses the CMS detector as it is configured for the third data-taking period of the CERN LHC, Run 3, which started in 2022. The entire silicon pixel tracking detector was replaced. A new powering system for the superconducting solenoid was installed. The electronics of the hadron calorimeter was upgraded. All the muon electronic systems were upgraded, and new muon detector stations were added, including a gas electron multiplier detector. The precision proton spectrometer was upgraded. The dedicated luminosity detectors and the beam loss monitor were refurbished. Substantial improvements to the trigger, data acquisition, software, and computing systems were also implemented, including a new hybrid CPU/GPU farm for the high-level trigger

    Development of the CMS detector for the CERN LHC Run 3

    No full text
    Since the initial data taking of the CERN LHC, the CMS experiment has undergone substantial upgrades and improvements. This paper discusses the CMS detector as it is configured for the third data-taking period of the CERN LHC, Run 3, which started in 2022. The entire silicon pixel tracking detector was replaced. A new powering system for the superconducting solenoid was installed. The electronics of the hadron calorimeter was upgraded. All the muon electronic systems were upgraded, and new muon detector stations were added, including a gas electron multiplier detector. The precision proton spectrometer was upgraded. The dedicated luminosity detectors and the beam loss monitor were refurbished. Substantial improvements to the trigger, data acquisition, software, and computing systems were also implemented, including a new hybrid CPU/GPU farm for the high-level trigger.Since the initial data taking of the CERN LHC, the CMS experiment has undergone substantial upgrades and improvements. This paper discusses the CMS detector as it is configured for the third data-taking period of the CERN LHC, Run 3, which started in 2022. The entire silicon pixel tracking detector was replaced. A new powering system for the superconducting solenoid was installed. The electronics of the hadron calorimeter was upgraded. All the muon electronic systems were upgraded, and new muon detector stations were added, including a gas electron multiplier detector. The precision proton spectrometer was upgraded. The dedicated luminosity detectors and the beam loss monitor were refurbished. Substantial improvements to the trigger, data acquisition, software, and computing systems were also implemented, including a new hybrid CPU/GPU farm for the high-level trigger

    Development of the CMS detector for the CERN LHC Run 3

    No full text
    International audienceSince the initial data taking of the CERN LHC, the CMS experiment has undergone substantial upgrades and improvements. This paper discusses the CMS detector as it is configured for the third data-taking period of the CERN LHC, Run 3, which started in 2022. The entire silicon pixel tracking detector was replaced. A new powering system for the superconducting solenoid was installed. The electronics of the hadron calorimeter was upgraded. All the muon electronic systems were upgraded, and new muon detector stations were added, including a gas electron multiplier detector. The precision proton spectrometer was upgraded. The dedicated luminosity detectors and the beam loss monitor were refurbished. Substantial improvements to the trigger, data acquisition, software, and computing systems were also implemented, including a new hybrid CPU/GPU farm for the high-level trigger

    Development of the CMS detector for the CERN LHC Run 3

    No full text
    International audienceSince the initial data taking of the CERN LHC, the CMS experiment has undergone substantial upgrades and improvements. This paper discusses the CMS detector as it is configured for the third data-taking period of the CERN LHC, Run 3, which started in 2022. The entire silicon pixel tracking detector was replaced. A new powering system for the superconducting solenoid was installed. The electronics of the hadron calorimeter was upgraded. All the muon electronic systems were upgraded, and new muon detector stations were added, including a gas electron multiplier detector. The precision proton spectrometer was upgraded. The dedicated luminosity detectors and the beam loss monitor were refurbished. Substantial improvements to the trigger, data acquisition, software, and computing systems were also implemented, including a new hybrid CPU/GPU farm for the high-level trigger
    corecore