70 research outputs found

    Fusion and Binary-Decay Mechanisms in the 35^{35}Cl+24^{24}Mg System at E/A ≈\approx 8 MeV/Nucleon

    Full text link
    Compound-nucleus fusion and binary-reaction mechanisms have been investigated for the 35^{35}Cl+24^{24}Mg system at an incident beam energy of ELab_{Lab}= 282 MeV. Charge distributions, inclusive energy spectra, and angular distributions have been obtained for the evaporation residues and the binary fragments. Angle-integrated cross sections have been determined for evaporation residues from both the complete and incomplete fusion mechanisms. Energy spectra for binary fragment channels near to the entrance-channel mass partition are characterized by an inelastic contribution that is in addition to a fully energy damped component. The fully damped component which is observed in all the binary mass channels can be associated with decay times that are comparable to, or longer than the rotation period. The observed mass-dependent cross sections for the fully damped component are well reproduced by the fission transition-state model, suggesting a fusion followed by fission origin. The present data cannot, however, rule out the possibility that a long-lived orbiting mechanism accounts for part or all of this yield.Comment: 41 pages standard REVTeX file, 14 Figures available upon request -

    The upgrade of the ALICE TPC with GEMs and continuous readout

    Get PDF
    The upgrade of the ALICE TPC will allow the experiment to cope with the high interaction rates foreseen for the forthcoming Run 3 and Run 4 at the CERN LHC. In this article, we describe the design of new readout chambers and front-end electronics, which are driven by the goals of the experiment. Gas Electron Multiplier (GEM) detectors arranged in stacks containing four GEMs each, and continuous readout electronics based on the SAMPA chip, an ALICE development, are replacing the previous elements. The construction of these new elements, together with their associated quality control procedures, is explained in detail. Finally, the readout chamber and front-end electronics cards replacement, together with the commissioning of the detector prior to installation in the experimental cavern, are presented. After a nine-year period of R&D, construction, and assembly, the upgrade of the TPC was completed in 2020.publishedVersio
    • …
    corecore