17 research outputs found

    Inhibition of active nuclear transport is an intrinsic trigger of programmed cell death in trypanosomatids

    No full text
    International audienc

    Crystallinity Dependence of the Plasmon Resonant Raman Scattering by Anisotropic Gold Nanocrystals

    No full text
    International audienceAu nanocrystals (NCs) with different crystalline structures and related morphologies are unselectively synthesized using an organometallic route. The acoustic vibrations of these NCs are studied by plasmon mediated low-frequency Raman scattering (LFRS). A splitting of the quadrupolar vibration mode is pointed out in the LFRS spectrum. Comparison of the measured frequencies with calculations and careful examination of the NCs morphologies by transmission electron microscopy ascertain this splitting as being an effect of crystallinity. The excitation dependence of the LFRS spectra is interpreted by the shape-selection of the NCs via plasmon−vibration coupling. These results give new insights into the crystallinity influence on both the vibrations of the NCs and their coupling with plasmons and demonstrate the relevance of elastic anisotropy in monodomain NCs

    The remote handling compatibility analysis of the ITER generic upper port plug structure

    No full text
    The ITER diagnostics generic upper port plug (GUPP) is developed as a standardized design for all diagnostic upper port plugs, in which a variety of payloads can be mounted. Here, the remote handling compatibility analysis (RHCA) of the GUPP design is presented that was performed for the GUPP final design review. The analysis focuses mainly on the insertion and extraction procedure of the diagnostic shield module (DSM), a removable cassette that contains the diagnostic in-vessel components. It is foreseen that the DSM is a replaceable component – the procedure of which is to be performed inside the ITER hot cell facility (HCF), where the GUPP can be oriented in a vertical position. The DSM removal procedure in the HCF consists of removing locking pins, an M30 sized shoulder bolt and two electrical straps through the use of a dexterous manipulator, after which the DSM is lifted out of the GUPP by an overhead crane. For optimum access to its internals, the DSM is mounted in a handling device. The insertion of a new or refurbished DSM follows the reverse procedure. The RHCA shows that the GUPP design requires a moderate amount of changes to become fully compatible with RH maintenance requirements

    The remote handling compatibility analysis of the ITER generic upper port plug structure

    No full text
    The ITER diagnostics generic upper port plug (GUPP) is developed as a standardized design for all diagnostic upper port plugs, in which a variety of payloads can be mounted. Here, the remote handling compatibility analysis (RHCA) of the GUPP design is presented that was performed for the GUPP final design review. The analysis focuses mainly on the insertion and extraction procedure of the diagnostic shield module (DSM), a removable cassette that contains the diagnostic in-vessel components. It is foreseen that the DSM is a replaceable component – the procedure of which is to be performed inside the ITER hot cell facility (HCF), where the GUPP can be oriented in a vertical position. The DSM removal procedure in the HCF consists of removing locking pins, an M30 sized shoulder bolt and two electrical straps through the use of a dexterous manipulator, after which the DSM is lifted out of the GUPP by an overhead crane. For optimum access to its internals, the DSM is mounted in a handling device. The insertion of a new or refurbished DSM follows the reverse procedure. The RHCA shows that the GUPP design requires a moderate amount of changes to become fully compatible with RH maintenance requirements

    Support structure concept for integration of ITER diagnostics in the port cell

    No full text
    Development of the diagnostics for ITER tokamak, which is presently under construction by several international partners at Cadarache in France, is a major challenge because of severe environment, strict engineering requirements, and the need for high reliability in the measurements. The diagnostic systems in the upper, equatorial and lower port cells on ITER are designed to be integrated within the interspace and port cell support structures. These structures are interfacing with remote handling rail system for the cask operations, thus facilitating the removal and installation of the diagnostics in the port and hence minimizing time for working close to the tokamak. In this paper, the challenges associated with the integration of the diagnostics in the port interspace and port cell, as well as their solutions will be addressed and presented. The interspace and the port cell support structures, as well as their interfaces with the biological shield, will be discussed

    Extending the physics studied by ECE on ITER

    No full text
    The Electron Cyclotron Emission (ECE) diagnostic provides essential information for plasma operation and for establishing performance characteristics in ITER. Recently, the design of the ITER ECE diagnostic has been taken through the conceptual design review and now entering the detailed design phase [1, 2]. The baseline ECE system on ITER permits measurements of both the X- and O-mode radiation in the frequency range from 70 GHz up to 1 THz along two lines-of-sight, perpendicular and oblique at about 10 degrees, in the equatorial port. The system as planned meets the ITER measurement requirements. Nevertheless, there are several other mm-wave diagnostics in ITER, such as HFS, LFS and plasma position reflectometry, as well as Collective Thomson scattering system, whose transmission lines allow, in principle, additional measurements of parts of the ECE spectrum with upgrades of their back-ends, improvements in filtering and/or additional receivers. A discussion of whether and how supposedly to enable such ECE measurements is given here

    Support structure concept for integration of ITER diagnostics in the port cell

    No full text
    Development of the diagnostics for ITER tokamak, which is presently under construction by several international partners at Cadarache in France, is a major challenge because of severe environment, strict engineering requirements, and the need for high reliability in the measurements. The diagnostic systems in the upper, equatorial and lower port cells on ITER are designed to be integrated within the interspace and port cell support structures. These structures are interfacing with remote handling rail system for the cask operations, thus facilitating the removal and installation of the diagnostics in the port and hence minimizing time for working close to the tokamak. In this paper, the challenges associated with the integration of the diagnostics in the port interspace and port cell, as well as their solutions will be addressed and presented. The interspace and the port cell support structures, as well as their interfaces with the biological shield, will be discussed

    Final design of the generic upper port plug structure for ITER diagnostic systems

    No full text
    The generic upper port plug (GUPP) structure in ITER is a 6 m long metal box which deploys diagnostic components into the vacuum vessel. This structure is commonly used for all the diagnostic upper ports. The final design of the GUPP structure, which has successfully passed the final design review in 2013, is described here. The diagnostic port plug is cantilevered to the vacuum vessel with a heavy payload at the front, so called the diagnostic first wall (DFW) and the diagnostic shield module (DSM). Most of electromagnetic (EM) load (∼80%) occurs in DFW/DSM. Therefore, the mounting design to transfer the EM load from DFW/DSM to the GUPP structure is challenging, which should also comply with thermal expansion and tolerance for assembly and manufacturing. Another key design parameter to be considered is the gap between the port plug and the vacuum vessel port. The gap should be large enough to accommodate the remote handling of the heavy port plug (max. 25 t), the structural deflection due to external loads and machine assembly tolerance. At the same time, the gap should be minimized to stop the neutron streaming according to the ALARA (as low as reasonably achievable) principle. With these design constraints, the GUPP structure should also provide space for diagnostic integration as much as possible. This requirement has led to the single wall structure having the gun-drilled water channels inside the structure. Furthermore, intensive efforts have been made on the manufacturing study including material selection, manufacturing codes and French regulation related to nuclear equipment and safety. All these main design and manufacturing aspects are discussed in this paper, including requirements, interfaces, loads and structural assessment and maintenance
    corecore