315 research outputs found

    Internal Friction in Deformed Indium Antimonide Crystals(Physics)

    Get PDF
    The internal friction in deformed InSb single crystals is investigated in the temperature range from 4.2 to 503 K. Three relaxation peaks, denoted by P_1, P_2, and P_3, with activation energies of (0.05±0.01), (0.08±0.01), and (0.36±0.02) eV, respectively, are observed to develop upon deformation. The heights of these peaks decrease gradually upon annealing. Peaks P_1 and P_2 are interpreted to be associated with the stress-induced motion of geometrical kinds on In-dislocations and Sb-dislocations, respectively, passing over the Peierls potential barrier of the second kind. Peak P_3 is interpreted to be due to the interaction of geometrical kinks with jogs located on dislocation lines

    Geobim for digital building permit process: Learning from a case study in Rotterdam

    Get PDF
    Among the digitalization processes which are being raised in Europe and in the world, the building permit process is seen as one of the priorities by municipalities, governmental institutions and standardization organizations. However, in current practice, the building permit issuing as well as the integration of geoinformation with BIM (GeoBIM) suffers from a number of complex sub-issues. These issues still remain and prevent the development of successful methodologies. In this paper, the building permit use case is explored within a project in close collaboration with the municipality of Rotterdam. A very specific case study in Rotterdam was selected as a starting point, which allowed us to develop the needed methodology for the implementation of an effective tool. In this paper we highlight the interpretation and formalization of regulation for building height, overhang and tower ratio. While these rules are specific to a zoning plan in Rotterdam, we believe that the methodology and encountered issues in formalizing the rules, applying the rules on delivered models and integrating various data sources (BIM and GIS specifically) are general to most building codes

    EuroSDR GeoBIM project a study in Europe on how to use the potentials of BIM and GEO data in practice

    Get PDF
    In both the Geo and BIM domains, it is widely acknowledged that the integration of geo-data and BIM-data is beneficial and a crucial step in facing the multi-disciplinary challenges of our built environment. The result of this integration - broadly termed as GeoBIM - has a range of potential uses from district study to road safety. However, from the data perspective, this integration raises the question of how to integrate very detailed design and construction data from the BIM domain with contextual geospatial data (both 2D and 3D) that model a very diverse range of aspects of the wider built and natural environment. This paper reports work carried out during the second phase of the EuroSDR GeoBIM project, which sets out to understand the general status of GeoBIM across Europe with particular focus from a National Mapping and Cadastral Agency perspective. The first phase of the project reviewed the current status of GeoBIM in participating countries and identified the need for specific detailed use cases to overcome both the lack of awareness and the lack of understanding of the potential of GeoBIM. We present both an update on the current status of GeoBIM, and additional details of one of the selected use cases relating to planning/development permits. For the latter, we have been able to develop a detailed workflow highlighting specific data exchange points within the process to issue a development permit, allowing a more in-depth identification of both the roles and data needs at each stage

    A FRAMEWORK FOR THE REPRESENTATION OF TWO VERSIONS OF A 3D CITY MODEL IN 4D SPACE

    Get PDF
    3D city models are being increasingly adopted by organisations in order to serve application needs related to urban areas. In order to fulfil the different requirements of various applications, the concept of Level of Detail (LoD) has been incorporated in 3D city models specifications, such as CityGML. Therefore, datasets of different LoDs are being created for the same areas by several organisations for their own use cases. Meanwhile, as time progresses newer versions of existing 3D city models are being created by vendors. Nevertheless, the existing mechanisms for representating multi-LoD data has not been adopted by the users and there has been little effort on the implementation of a mechanism to store multiple revisions of a city model. This results in redundancy of information and the existence of multiple datasets inconsistent with each other. Alternatively, a representation of time or scale as additional dimensions to the three spatial ones has been proposed as a better way to store multiple versions of datasets while retaining information related to the corresponding features between datasets. In this paper, we propose a conceptual framework with initial considerations for the implementation of a 4D representation of two states of a 3D city model. This framework defines both the data structure of such an approach, as well as the methodology according to which two existing 3D city models can be compared, associated and stored with their correspondences in 4D. The methodology is defined as six individual steps that have to be undertaken, each with its own individual requirements and goals that have to be challenged. We, also, provide some examples and considerations for the way those steps can be implemented

    Geobim benchmark 2019: Design and initial results

    Get PDF
    GeoBIM, the integration of 3D geoinformation (Geo) with building information models (BIM), is a subject of increasing attention in both domains. A well-known practical challenge for this integration is the mixed state of software support for open standards in each domain that would ease the integration. This is often known by practitioners but poorly documented. In order to solve this problem, we devised the GeoBIM benchmark, in which we compile the experiences of volunteering participants, who perform a guided study to test the software they are most familiar with against a few provided datasets structured in open standards. The aim of the tests is to improve the knowledge of the state of the art in the software support for GeoBIM open standards and to identify points for improvement. In this paper, we present the design of the benchmark, especially explaining and discussing the chosen data to be used with their connected issues to be tested, and some initial results

    GeoBIM Benchmark 2019: Intermediate results

    Get PDF
    An investigation into the implementation state of open standards in software is currently ongoing through the ISPRS/EuroSDR 'GeoBIM benchmark 2019' initiative, which kicked off earlier this year. The benchmark activity provides a way of assessing and comparing the functionality of different software packages in GIS and BIM in terms of their ability to handle standardised data (IFC and CityGML) and undertake various tasks using this data. Approximately 65 people have registered to participate so far, with participants from a wide range of backgrounds and proposing to test a variety of software packages. This confirms that the issues under investigation are of interest, and also meets the wider benchmark aim of having a variety of participants, since the project is conceived as using a bottom-up approach with cross-disciplinary and cross-expertise participation. While full benchmark results are not due to be submitted until later this year, interim results have highlighted a number of common issues across multiple software packages, and a web meeting for participants held in July 2019 also led to some improvements in how the benchmark results are being captured

    Opportunities and challenges for GeoBIM in Europe: developing a building permits use-case to raise awareness and examine technical interoperability challenges

    Get PDF
    The integration of geoinformation with BIM (GeoBIM) is critical to underpin solutions to many city-related challenges. However, to achieve an effective integration it is necessary to consider not only data and technical options but also current practice and users’ needs. This paper describes work carried out within the EuroSDR-GeoBIM project to address this challenge. After investigating potential uses for GeoBIM and existing challenges, we address a planning permits for buildings use case, to help bridging the gap between theory and practice. The resultshighlights a high-level harmonised workflow envisaging the use of GeoBIM information for automating the planning permits process

    Detection of gp43 of Paracoccidioides brasiliensis by the loop-mediated isothermal amplification (LAMP) method

    Get PDF
    Paracoccichoidomycosis is a deep mycosis Caused by the thermo-dependent dimorphic fungus Paracoccidioides brasiliensis and is prevalent in Latin American countries. We detected the species specific gp43 gene of P. brasiliensis by loop-mediated isothermal amplification (LAMP) in 22 clinical and seven armadillo-derived isolates. the amplified DNA appeared as a ladder with a specific banding pattern. the advantage of the LAMP method is speed; only 3 h were necessary for identification of the organism and diagnosis of the disease. We were also able to obtain positive results from DNA extracted from a paraffin-embedded tissue sample of paracoccidioidomycosis, suggesting that this method may achieve clinical application in the near future. (C) 2004 Federation of European Microbiological Societies. Published by Elsevier B.V. All rights reserved.Chiba Univ, Pathogen Fungi & Microbial Toxicoses Res Ctr, Chuo Ku, Chiba 2608673, JapanFujisawa Pharmaceut Co Ltd, Analyt Res Labs, Osaka, JapanUniversidade Federal de São Paulo, Fac Med, Dept Anat & Patol, São Paulo, BrazilUniversidade Federal de São Paulo, Fac Med, Dept Anat & Patol, São Paulo, BrazilWeb of Scienc
    corecore