29 research outputs found
School of Art
The new School of Art is a 100,000 square foot facility, housing visual art instruction, art education, and exhibition/ gallery space for the Muncie community as well as for Ball State University. Located adjacent to the Architecture Building, the structure fits well into the master plan for the University, providing the northern terminus to the McKinley pedestrian mall, completing an academic quadrangle, including the new Business College and Bracken Library, and supporting the proposed campus vehicular traffic loop.The school contains 200 actual work spaces, with storage space for each of the 560 students. School departments will expand outward from the glazed central circulation element as determined by demand and economics.Projected total construction cost is estimated at five million dollars including landscaping. The school itself is on display as a primary design concept. To people circulating through the building, the different workshops are readily identifiable through graphic display of equipment characteristic to the particular areas.Variations in floor levels to provide visual excitement and maximum efficiency in circulation are also major design considerations.Thesis (B. Arch.)College of Architecture and Plannin
Fundamentals of engineering drawing for design, product development and numerical control
Fundamantals of engineering drawing: with an introduction to interactive computer graphics for design ang production, ed. 9, ed 11/ luzadder
xii, 692 hal.: ill.; 29 c
School of Art
The new School of Art is a 100,000 square foot facility, housing visual art instruction, art education, and exhibition/ gallery space for the Muncie community as well as for Ball State University. Located adjacent to the Architecture Building, the structure fits well into the master plan for the University, providing the northern terminus to the McKinley pedestrian mall, completing an academic quadrangle, including the new Business College and Bracken Library, and supporting the proposed campus vehicular traffic loop.The school contains 200 actual work spaces, with storage space for each of the 560 students. School departments will expand outward from the glazed central circulation element as determined by demand and economics.Projected total construction cost is estimated at five million dollars including landscaping. The school itself is on display as a primary design concept. To people circulating through the building, the different workshops are readily identifiable through graphic display of equipment characteristic to the particular areas.Variations in floor levels to provide visual excitement and maximum efficiency in circulation are also major design considerations.College of Architecture and PlanningThesis (B. Arch.
Helen Luzadder Folder
13 pages of family history documents containing and related to Helen Wilson Luzadder; Helen Wilson - including: Index; typewritten stories; photograph; Birthday News article
Fundamentals of engineering drawing: for technical students and professional draftsmen
xii+720hlm.;24c
