6,399 research outputs found

    Studies of an orbital gradiometer mission

    Get PDF
    The goal of using an orbital gradiometer mission to provide an accurate (1 to 2 mgal), high resolution (1 by 1 deg), global map of the earth's geopotential is currently being investigated. This investigation involves the simulation of the satellite ephemeris and the corresponding gradiometer measurements which can be used in the study of various techniques and methodologies that were proposed to recover the parameters used in modeling the geopotential. Also, the effects on the mission of various time varying forces acting on the spacecraft were included in the studies

    SAGE System meeting 24 October 1955

    Get PDF
    Meeting attendants: J. W. Forrester, R. R. Everett, H. E. Anderson, J. A. Arnow, C. W. Farr, J. F. Jacobs, H. J. Kirshner, E. D. Lundberg, J. A. O'Brien, K. E. McVicar, W. Ogden, T. R. Parkins, J. C. Proctor, E. S. Rich, N. H. Taylor, P. YoutzMinutes of weekly SAGE System meeting discussing new meeting time, IBM reorganization, visitors to Building F, tape conversion equipment, release of operational specifications, recruiting for Rand, test equipment for SAGE, time allocation request from CRC, and meetings scheduled that week

    SAGE System meeting 2 May 1955

    Get PDF
    Meeting attendants: J. W. Forrester, R. R. Everett, H. E. Anderson, S. H. Dodd, C. W. Farr, J. F. Jacobs, H. J. Kirshner, A. P. Kromer, S. Hibbard, E. D. Lundberg, K. E. McVicar, B. E. Morriss, J. A. O'Brien, B. B. Paine, T. R. Parkins, J. C. Proctor, E. S. Rich, N. H. Taylor, C. R. WieserMinutes of weekly SAGE System meeting discussing SAGE test committee, computer time allocation XD-1, auxiliary drums XD-1, large board display, 750 cps outputs, heat dissipation in AN/FSQ-7 equipment, distribution of documents to ADES representatives, and meetings scheduled that week

    SAGE System meeting 5 December 1955

    Get PDF
    Meeting attendants: J. W. Forrester, R. R. Everett, H. E. Anderson, J. A. Arnow, D. R. Aufderheide, W. H. Ayer, H. D. Benington, P. Brager, D. R. Brown, S. H. Dodd, C. W. Farr, D. R. Israel, J. F. Jacobs, N. T. Jones, H. J. Kirshner, E. D. Lundberg, B. E. Morriss, J. A. O'Brien, K. E. McVicar, W. Ogden, T. R. Parkins, E. S. Rich, N. H. Taylor, C. A. ZraketMinutes of weekly SAGE System meeting discussing Boeing study plan, Waltham move, ERA visit, XD-1 time allocation, schedules for ADES review, and meetings scheduled that week

    Summary of Lincoln Laboratory Technical Information Releases (T.I.R.'s) Pertaining to Sage System Issued By The Production Coordination Office (PCO) (Cumulative List Through 1 April 1955)

    Get PDF
    The summary is a catalogued listing of Series 1 TIR's pertaining to the Sage System that have been issued to date and indicates present status. The PCO is an office established by the Lincoln Director's Office to serve as the contact point at Lincoln in connection with the SAGE System, and to formally release Lincoln documents covering system specifications and requirements

    SAGE System meeting 21 November 1955

    Get PDF
    Meeting attendants: R. R. Everett, H. E. Anderson, J. A. Arnow, D. R. Aufderheide, W. H. Ayer, H. D. Benington, P. Brager, D. R. Brown, C. W. Farr, H. J. Kirshner, E. D. Lundberg, B. E. Morriss, J. A. O'Brien, K. E. McVicar, W. Ogden, T. R. Parkins, J. C. Proctor, E. S. Rich, N. H. Taylor, P. YoutzMinutes of weekly SAGE System meeting discussing training tapes, SAGE system meeting, engineering-installation phasing committee, tape equipment for MTC, and meetings scheduled that week

    SAGE System meeting 19 December 1955

    Get PDF
    Meeting Attendants: J. W. Forrester, R. R. Everett, H. E. Anderson, W. H. Ayer, D. R. Aufderheide, P. Bragar, D. R. Brown, S. H> Dodd, C. W. Farr, D. R. Israel, J. F. Jacobs, N. T. Jones, H. J. Kirshner, E. D. Lundberg, B. E. Morriss, K. E. McVicar, J. A. O'Brien, W. Ogden, T. R. Parkins, E. S. Rich, N. H. Taylor, C. A. ZraketMinutes of weekly SAGE System meeting discussing proposed IBM building, Group 61 space, systems maintenance programs, results of Air Force phasing meeting, Boeing-Lincoln study group progress, visit to ERA, and meetings scheduled that week

    SAGE System meeting 27 June 1955

    Get PDF
    Meeting attendants: J. W. Forrester, R. R. Everett, H. E. Anderson, J. A. Arnow, W. H. Ayer, J. J. Carson, S. H. Dodd, C. W. Farr, J. F. Jacobs, H. J. Kirshner, E. D. Lundberg, K. E. McVicar, B. E. Morriss, J. A. O'Brien, B. B. Paine, T. R. Parkins, E. S. Rich, N. H. Taylor, C. R. WieserMinutes of weekly SAGE System meeting discussing building redesign, card machines for XD-1, ADES monthly status meeting, console layouts for AN/FSQ-7, results of meeting with EADF, basic circuit and component approvals, Building F lighting, list of items for ADES project office, and meetings scheduled that week

    Summary of Lincoln Laboratory Technical Information Releases Pertaining To The Sage System Issued By The Production Coordination Office (Cumulative List Through 30 September 1955)

    Get PDF
    The summary is a catalogued listing of Technical Information Releases pertaining to the Sage System that have been issued to date and indicates present status. The Production Coordination Office is an office established by the Lincoln Director's Office to serve as the contact point at Lincoln in connection with the SAGE System, and to formally release Lincoln documents covering system specifications and requirements

    Summary of Lincoln Laboratory Technical Information Releases Pertaining To The Sage System Issued By The Production Coordination Office (Cumulative List Through 31 December 1955)

    Get PDF
    The summary is a catalogued listing of Technical Information Releases pertaining to the Sage System that have been issued to date and indicates present status. The Production Coordination Office is an office established by the Lincoln Director's Office to serve as the contact point at Lincoln in connection with the SAGE System, and to formally release Lincoln documents covering system specifications and requirements
    corecore