6 research outputs found

    Status Of The FAIR Synchrotron Projects SIS18 And SIS100

    Get PDF
    A large fraction of the program to upgrade the existingheavy ion synchrotron SIS18 as injector for the FAIR synchrotron SIS100 has been successfully completed. With the achieved technical status, a major increase of theaccelerated number of heavy ions could be reached. Thenow available performance especially demonstrates thefeasibility of high intensity beams of medium charge stateheavy ions with a sufficient control of the dynamicvacuum and connected charge exchange loss. Two furtherupgrade measures, the installation of additional magneticalloy (MA) acceleration cavities and the exchange of themain dipole power converter, are presently beingimplemented. For the FAIR synchrotron SIS100, theprocurement of all major components with longproduction times has been started. With the delivery andtesting of several pre-series components, the phase ofoutstanding technical reserach and developments could becompleted and the readiness for series productionachieved

    Conceptual Design of Cryogenic Facilities for Super-FRS of FAIR

    No full text

    Technological features and status of the new heavy ions synchrotron SIS100 at FAIR

    No full text
    SIS100 is a new superconducting heavy ion synchrotron optimized for the acceleration of high intensity heavy ion beams. Most crucial intensity limitation for heavy ion beams in SIS100 is the dynamic vacuum and corresponding beam loss by projectile ionization. Ionization loss and ion induced desorption drive the residual gas pressure into an instability, generating an intensity barrier at much lower intensity levels than any space charge limit. Technologies for stabilizing the dynamic vacuum, such as extensive charge separator lattice, pumping by cryogenic magnet chambers, cryo-adsorption pumps and cryo-ion catchers had to be implemented. SIS100 will also be the first user synchrotron comprising a laser cooling system for cooling at relativistic beam energies. Combined with a strong bunch compression system, laser cooling will support the generation of short ion bunches. Meanwhile, a large amount of the SIS100 components have been delivered and preparations for installation are launched. The shell construction of SIS100 underground tunnel is completed. Installation of the technical building infrastructure and the cryogenic distribution system are ongoing
    corecore