55 research outputs found
Main Results of Phase IV BEMUSE Project: Simulation of LBLOCA in an NPP
Phase IV of BEMUSE Program is a necessary step for a subsequent uncertainty analysis. It includes the simulation of the reference
scenario and a sensitivity study. The scenario is a LBLOCA and the reference plant is Zion 1 NPP, a 4 loop PWR unit. Thirteen
participants coming from ten different countries have taken part in the exercise. The BEMUSE (Best Estimate Methods plus
Uncertainty and Sensitivity Evaluation) Programhas been promoted by theWorking Group on AccidentManagement and Analysis
(WGAMA) and endorsed by the Committee on the Safety of Nuclear Installations (CSNI). The paper presents the results of the
calculations performed by participants and emphasizes its usefulness for future uncertainty evaluation, to be performed in next
phase. The objectives of the activity are basically to simulate the LBLOCA reproducing the phenomena associated to the scenario
and also to build a common, well-known, basis for the future comparison of uncertainty evaluation results among different
methodologies and codes. The sensitivity calculations performed by participants are also presented. They allow studying the
influence of different parameters such as material properties or initial and boundary conditions, upon the behaviour of the most
relevant parameters related to the scenario
Analyse des signaux pour un dispositif de mesure et de stimulation du système nerveux central
- Un des enjeux actuels en Neurosciences est de pouvoir enregistrer simultanément les activités d'un grand nombre de cellules au sein de grands réseaux de neurones, et de pouvoir stimuler de manière dynamique ces réseaux afin d'en contrôler les activités. Le but du projet Neurocom est de réaliser un système multiélectrode haute densité intégré sur silicium, permettant d'enregistrer et de stimuler de grands réseaux de neurones in vitro. Ce dispositif sera constitué d'une microstructure d'électrodes stérilisable hybridée sur un circuit analogique intégré (préamplification, filtrage, multiplexage, stimulation), lui-même interfacé via une carte numérique de commande et acquisition reliée à un PC. Afin de pouvoir mieux appréhender les phénomènes bioélectriques et électrochimiques à l'interface capteur et donc mieux spécifier le cahier des charges et l'architecture du système, la maquette de test NEUROCOM1 a été conçue en électronique discrète et est actuellement utilisée pour conduire différents tests
Expression of alternansucrase in potato plants
Alternan, which consists of alternating α-(1→3)/α-(1→6)-linked glucosyl residues, was produced in potato tubers by expressing a mature alternansucrase (Asr) gene from Leuconostoc mesenteroides NRRL B-1355 in potato. Detection of alternan was performed by enzyme-linked immunosorbent assay in tuber juices, revealing a concentration between 0.3 and 1.2 mg g-1 fresh wt. The Asr transcript levels correlated well with alternan accumulation in tuber juices. It appeared that the expression of sucrose-regulated starch-synthesizing genes (ADP-glucose pyrophosphorylase subunit S and granule-bound starch synthase I) was down-regulated. Despite this, the physico-chemical properties of the transgenic starches were unaltered. These results are compared to those obtained with other transgenic potato plants producing mutan [α-(1→3)-linked glucosyl residues] and dextran [α-(1→6)-linked glucosyl residues]
Uncertainty and sensitivity analysis of the LOFT L2-5 test: Results of the BEMUSE programme
This paper presents the results and the main lessons learnt from the phase 3 of BEMUSE, an international benchmark activity sponsored by the Committee on the Safety of Nuclear Installations [CSNI: Committee on the Safety of Nuclear Installations (NEA, OECD), 2007. BEMUSE Phase III Report. NEA/CSNI R(2007) 4, October 2007] of the OECD/NEA. The phase 3 of BEMUSE aimed at performing Uncertainty and Sensitivity Analyses of thermal-hydraulic codes used for the calculation of LOFT L2-5 experiment, which simulated a Large-Break Loss-of-Coolant-Accident (LB-LOCA). Eleven participants coming from ten organisations and eight countries took part in this benchmark. In the first section of this paper, the context of BEMUSE is described as well as the methods used by the participants. In the second section, the results of the benchmark are presented. The majority of the participants find uncertainty bands which envelop the experimental data fairly well, however the width of these bands is much diverged. A synthesis of the sensitivity analysis results has been made and is expected to provide a useful basis for further uncertainty analysis dealing with LB-LOCA. Finally, recommendations are given both for uncertainty and sensitivity analysis. © 2008 Elsevier B.V. All rights reserved
Uncertainty and sensitivity analysis of the LOFT L2-5 test: Results of the BEMUSE programme
This paper presents the results and the main lessons learnt from the phase 3 of BEMUSE, an international
benchmark activity sponsored by the Committee on the Safety of Nuclear Installations [CSNI: Committee
on the Safety of Nuclear Installations (NEA, OECD), 2007. BEMUSE Phase III Report. NEA/CSNI R(2007) 4,
October 2007] of the OECD/NEA. The phase 3 of BEMUSE aimed at performing Uncertainty and Sensitivity
Analyses of thermal–hydraulic codes used for the calculation of LOFT L2-5 experiment, which simulated a
Large-Break Loss-of-Coolant-Accident (LB-LOCA). Eleven participants coming from ten organisations and
eight countries took part in this benchmark.
In the first section of this paper, the context of BEMUSE is described as well as the methods used by
the participants. In the second section, the results of the benchmark are presented. The majority of the
participants find uncertainty bands which envelop the experimental data fairlywell, however the width of
these bands is much diverged. A synthesis of the sensitivity analysis results has been made and is expected
to provide a useful basis for further uncertainty analysis dealing with LB-LOCA. Finally, recommendations
are given both for uncertainty and sensitivity analysis
Simulation of a LBLOCA in ZION Nuclear Power Plant - BEMUSE Phase IV Report
The main goals of the BEMUSE program are: ² To evaluate the practicability, quality and reliability of best{estimate methods including uncertainty evaluations in applications relevant to nuclear reactor safety;
² To develop common understanding;
² To promote/facilitate their use by the regulatory bodies and the industry
The scope of Phase IV of the BEMUSE programme is the simulation of a LB{LOCA in a Nuclear
Power Plant using experience gained in the previous Phase II. Calculation results will be the basis for
uncertainty evaluation, to be performed in next phase.
The objectives of the activity are:
² To simulate a LB{LOCA reproducing the phenomena associated to the scenario.
² To have a common, well-documented basis for the execution of the uncertainty evaluation step
in Phase V.
Task speci¯cation
The activity followed the example of Phase II.
The selection of the plant has been a quite important issue. Some other options were considered.
The group made the decision of using Zion plant and CSNI approved the choice. Zion Station
was a 4 loop dual-reactor nuclear power plant of Westinghouse design. An input deck of the plant
existed for TRACE and RELAP5 codes.
NRC provided the input decks of Zion plant for TRACE and RELAP5 codes and the coordina-
tors prepared a specification that enabled the users of di®erent computer codes to produce their own
Zion input decks. For this purpose, along with plant parameters, the main features of the LBLOCA
scenario were specified in order to assure common initial and boundary conditions.
Similarly to the activity performed in Phase II, a list of sensitivity calculations was proposed to
study the influence of di®erent parameters such as material properties, initial and boundary conditions
upon the behaviour of key parameters of the scenario.
Main Results
Results can be summarized as follows:
² All participants managed to simulate the scenario and predict the main parameters with credible
consistency.
² Maximum values of PCT predicted by participants are quite close one each other.
² PCT time trends and timing of complete core rewet still show some disagreements.
² A database, including comparative tables and plots has been produced. This database is suitable
for providing the explanations needed for the following phases.
More in detail and related to steady state achievement, participants managed to reproduce the
pressure vs. length reference curve and to match the more significant parameters for the scenario
simulation. Discrepancies in steady state appeared only in some other parameters like those related
to the secondary system which are not that much influent.
Related to the reference case, the core thermal behaviour is the most interesting aspect to report.
Cladding temperature time trends produced show a consistent behaviour. The spread of results for
the PCT is about the same order of magnitude than that of Phase II (roughly 260-280 K). The major
di®erences between results come with the re°ooding behaviour and mainly its duration. In this case
the report correlates this point with some code e®ect.
Conclusions
Phase IV results are a step forward that contributes to the general goals of BEMUSE project.
At the time when this Phase IV Report is written, all participants are developing a Phase V
analysis based on the reference calculations produced in Phase IV. The coordinators want to emphasize
this point as a proof of how participants accept the usefulness of Phase IV.
It is clear that dispersion bands exist but it is also clear that the e®ort of explaining the reasons
of such dispersion is a valuable outcome from this phase. The outcome of BEMUSE Phase IV is also
helpful to understand the nuances existing inside the user e®ect and also to clarify the di®erences
between user e®ect and code e®ect.
Assumptions made by the user due to the lack of information are not part of the traditional user
e®ect and this report is useful to deal with them.
Participants, in average, have found or corroborrated the most in°uential parameters regarding
the their in°uence on PCT and tREFLOOD. The sensitivity study performed in Phase IV has also
pointed out that the user and code e®ects can appear not only in obtaining a reference case value, but
also when analyzing variations on the reference case.
Sensitivity calculation results are a good guidance for developing Phase V uncertainty evaluation.
BEMUSE Phase IV is a reference good enough to start with Phase V development
Main Results of phase IV BEMUSE project: Simulation of LBLOCA in an NPP
Phase IV of BEMUSE Program is a necessary step for a subsequent uncertainty analysis. It includes the simulation of the reference scenario and a sensitivity study. The scenario is a LBLOCA and the reference plant is Zion 1 NPP, a 4 loop PWR unit. Thirteen participants coming from ten different countries have taken part in the exercise. The BEMUSE (Best Estimate Methods plus Uncertainty and Sensitivity Evaluation) Program has been promoted by the Working Group on Accident Management and Analysis (WGAMA) and endorsed by the Committee on the Safety of Nuclear Installations (CSNI). The paper presents the results of the calculations performed by participants and emphasizes its usefulness for future uncertainty evaluation, to be performed in next phase. The objectives of the activity are basically to simulate the LBLOCA reproducing the phenomena associated to the scenario and also to build a common, well-known, basis for the future comparison of uncertainty evaluation results among different methodologies and codes. The sensitivity calculations performed by participants are also presented. They allow studying the influence of different parameters such as material properties or initial and boundary conditions, upon the behaviour of the most relevant parameters related to the scenario. © 2010 M. Pérez et al
- …