64 research outputs found

    Healthcare Provider N95 Respirator Contamination Worn Behind Face Shields With SARS-CoV-2 During Routine Clinical Care of Patients With COVID-19

    Get PDF
    N95 respirator contamination with severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2) during clinical care of patients with coronavirus disease 2019 is poorly understood. We performed a prospective observational study on healthcare provider's (HCP's) N95 respirators' and face shields' SARS-CoV-2 contamination during aerosol-generating procedures on SARS-CoV-2- positive patients housed in a COVID-19-specific unit. Medical masks worn on top of HCP's N95 respirators, and under face shields, during study aerosol-generating procedures were used as surrogates to detect contamination to avoid waste. Thirtythree HCPs were studied, and a total of 33 mask and 27 face shields were sampled. Masks were cut into 9 pieces and face shields were sampled twice, front and back, to determine locality of contamination; however, no positive samples were identified using standard polymerase chain reaction techniques with a CT value up to 40. All 9 mask piece samples were then pooled, as were face shield samples, using centrifugal concentration with polyethersulfone membranes. Once pooled and concentrated, overall, 9 (15%) samples were positive via real-time polymerase chain reaction: 5 from masks (15.2%) and 4 from face shields (14.8%)

    Overview of the JET results in support to ITER

    Get PDF

    Sequencing and scheduling : algorithms and complexity

    No full text
    Sequencing and scheduling as a research area is motivated by questions that arise in production planning, in computer control, and generally in all situations in which scarce resources have to be allocated to activities over time. In this survey, we concentrate on the area of deterministic machine scheduling. We review complexity results and optimization and approximation algorithms for problems involving a single machine, parallel machines, open shops, flow shops and job shops. We also pay attention to two extensions of this area: resource-constrained project scheduling and stochastic machine scheduling
    corecore