4 research outputs found

    EPICS Based Control System for SPES Tape Station for Beam Characterization: Motion System and Controls

    Get PDF
    International audienceThe SPES* Tape Station (STS) for Radioactive Ion Beams (RIBs) characterization is under construction at LNL. This tool will be used to measure the actual composition of the radioactive ion beams extracted from the SPES-β ion source and to optimize the source’s parameters. STS will provide beam diagnostic information by determining the beam composition and intensity. At the same time, it will be able to measure the target release curves needed for the source’s characterization and development. The core part of the system, the related motor and controls are being designed and constructed in synergy with IPN Orsay (France), iThemba Laboratories (South Africa) and the Gamma collaboration (INFN-CSN3). In particular, the mechanical part is based on the existing BEDO** tape system operated in ALTO while the control system for motion is an EPICS*** base application under implementation by iThemba and INFN, result of a upgrade operation required to substitute obsoleted hardware and update logic and algorithm

    Beam Dynamics Simulation and Measurements for the IFMIF/EVEDA Project

    Get PDF
    International audienceIn the framework of IFMIF/EVEDA project the source and RFQ are ready to be tested with beam. In this article the beam dynamics simulation and the measurement performed in preparation of the first beam injection are presented. The installed line is composed by the proton and deuteron Source with the LEBT composed of two solenoids that inject in the 10 meters long RFQ, the MEBT, diagnostic plate and the beam dump. The line is prepared to be tested with protons of 8 mA in pulsed mode (up to 0.1%)

    Beam Commissioning of the IFMIF EVEDA Very High Power RFQ

    No full text
    IFMIF, the International Fusion Materials Irradiation Facility, is an accelerator-based neutron source that will use Li(d, xn) reactions to generate a flux of neutrons with a broad peak at 14 MeV equivalent to the conditions of the Deuterium-Tritium reactions in a fusion power plant. IFMIF is conceived for fusion materials testing. The IFMIF prototype linear accelerator (LIPAc) is jointly developed by Europe and Japan within the IFMIF EVEDA project: it is composed of an ion source, a LEBT, an RFQ, a MEBT and a SC linac, with a final energy of 9 MeV. The 4-vane Radio Frequency Quadrupole (RFQ), developed by INFN in Italy, will accelerate a 130 mA deuteron beam from 0.1 to 5 MeV in continuous wave, for a beam power of 650 kW. The 9.8 m long 175 MHz cavity is composed of 18 x 0.54 m long modules flanged together and aligned within 0.3 mm tolerance. The RFQ was completed, delivered and assembled at the Rokkasho site and is presently under extended RF tests. The second phase of beam commissioning (up to 2.5 MeV/u) was scheduled to start at the end of 2017. Several unexpected issues and incidents significantly delayed the original program, which is however proceeding step by step toward the full achievement of its goals.9th International Particle Accelerator COnference - IPAC201

    Beam Commissioning of the IFMIF EVEDA Very High Power RFQ

    No full text
    International audienceIFMIF, the International Fusion Materials Irradiation Facility, is an accelerator-based neutron source that will use Li(d, xn) reactions to generate a flux of neutrons with a broad peak at 14 MeV equivalent to the conditions of the Deuterium-Tritium reactions in a fusion power plant. IFMIF is conceived for fusion materials testing. The IFMIF prototype linear accelerator (LIPAc) is jointly developed by Europe and Japan within the IFMIF EVEDA project: it is composed of an ion source, a LEBT, an RFQ, a MEBT and a SC linac, with a final energy of 9 MeV. The 4-vane Radio Frequency Quadrupole (RFQ), developed by INFN in Italy, will accelerate a 130 mA deuteron beam from 0.1 to 5 MeV in continuous wave, for a beam power of 650 kW. The 9.8 m long 175 MHz cavity is composed of 18 x 0.54 m long modules flanged together and aligned within 0.3 mm tolerance. The RFQ was completed, delivered and assembled at the Rokkasho site and is presently under extended RF tests. The second phase of beam commissioning (up to 2.5 MeV/u) was scheduled to start at the end of 2017. Several unexpected issues and incidents significantly delayed the original program, which is however proceeding step by step toward the full achievement of its goals
    corecore