77 research outputs found

    Energy Resolution Performance of the CMS Electromagnetic Calorimeter

    Get PDF
    The energy resolution performance of the CMS lead tungstate crystal electromagnetic calorimeter is presented. Measurements were made with an electron beam using a fully equipped supermodule of the calorimeter barrel. Results are given both for electrons incident on the centre of crystals and for electrons distributed uniformly over the calorimeter surface. The electron energy is reconstructed in matrices of 3 times 3 or 5 times 5 crystals centred on the crystal containing the maximum energy. Corrections for variations in the shower containment are applied in the case of uniform incidence. The resolution measured is consistent with the design goals

    Discutindo a educação ambiental no cotidiano escolar: desenvolvimento de projetos na escola formação inicial e continuada de professores

    Get PDF
    A presente pesquisa buscou discutir como a Educação Ambiental (EA) vem sendo trabalhada, no Ensino Fundamental e como os docentes desta escola compreendem e vem inserindo a EA no cotidiano escolar., em uma escola estadual do município de Tangará da Serra/MT, Brasil. Para tanto, realizou-se entrevistas com os professores que fazem parte de um projeto interdisciplinar de EA na escola pesquisada. Verificou-se que o projeto da escola não vem conseguindo alcançar os objetivos propostos por: desconhecimento do mesmo, pelos professores; formação deficiente dos professores, não entendimento da EA como processo de ensino-aprendizagem, falta de recursos didáticos, planejamento inadequado das atividades. A partir dessa constatação, procurou-se debater a impossibilidade de tratar do tema fora do trabalho interdisciplinar, bem como, e principalmente, a importância de um estudo mais aprofundado de EA, vinculando teoria e prática, tanto na formação docente, como em projetos escolares, a fim de fugir do tradicional vínculo “EA e ecologia, lixo e horta”.Facultad de Humanidades y Ciencias de la Educació

    Experience of public procurement of Open Compute servers

    No full text
    The Open Compute Project. OCP (http://www.opencompute.org/). was launched by Facebook in 2011 with the objective of building efficient computing infrastructures at the lowest possible cost. The technologies are released as open hardware. with the goal to develop servers and data centres following the model traditionally associated with open source software projects. In 2013 CERN acquired a few OCP servers in order to compare performance and power consumption with standard hardware. The conclusions were that there are sufficient savings to motivate an attempt to procure a large scale installation. One objective is to evaluate if the OCP market is sufficiently mature and broad enough to meet the constraints of a public procurement. This paper summarizes this procurement. which started in September 2014 and involved the Request for information (RFI) to qualify bidders and Request for Tender (RFT)

    Experience with procuring, deploying and maintaining hardware at remote co-location centre

    No full text
    In May 2012 CERN signed a contract witli tlie Wigner Data Centre in Budapest for an extension to CERN's central computing facility beyond its current boundaries set by electrical power and cooling available for computing. Tlie centre is operated as a remote co-location site providing rack-space, electrical power and cooling for server, storage and networking equipment acquired by CERN. Tlie contract includes a 'remote-lands' services for pliysical liandling of liardware (rack mounting, cabling, pusliing power buttons, ...) and maintenance repairs (swapping disks, memory modules, ...). However, only CERN personnel lave network and console access to tle equipment for system administration. This report gives an insiglt to adaptations of lardware arclitecture, procurement and delivery procedures undertaken enabling remote plysical landling of tle lardware. We will also describe tools and procedures developed for automating tle registration, burn-in testing, acceptance and maintenance of tle equipment as well as an independent but important clange to tle IT assets management (ITAM) developed in parallel as part of tlie CERN IT Agile Infrastructure project. Finally, we will report on experience from tlie first large delivery of 400 servers and 80 SAS JBOD expansion units (24 drive bays) to Wigner in Marcli 2013

    The ECAL Calibration: Use of the Light Monitoring System. Version 2.0

    No full text
    This note explains how we plan to calibrate the Electromagnetic Calorimeter and how the light monitoring system can be used in this process. This second version provides a more detailed calibration procedure and includes some experimental results. It remplaces the previous version 1.0 ( TN 96-036)

    Energy Resolution of the Barrel of the CMS Electromagnetic Calorimeter

    Get PDF
    The energy resolution of the barrel part of the CMS Electromagnetic Calorimeter has been studied using electrons of 20 to 250 GeV in a test beam. The incident electron's energy was reconstructed by summing the energy measured in arrays of 3x3 or 5x5 channels. There was no significant amount of correlated noise observed within these arrays. For electrons incident at the centre of the studied 3x3 arrays of crystals, the mean stochastic term was measured to be 2.8% and the mean constant term to be 0.3%. The amount of the incident electron's energy which is contained within the array depends on its position of incidence. The variation of the containment with position is corrected for using the distribution of the measured energy within the array. For uniform illumination of a crystal with 120 GeV electrons a resolution of 0.5% was achieved. The energy resolution meets the design goal for the detector

    Results of the first performance tests of the CMS electromagnetic calorimeter

    No full text
    CMS ECALPerformance tests of some aspects of the CMS ECAL were carried out on modules of the "barrel" sub-system in 2002 and 2003. A brief test with high energy electron beams was made in late 2003 to validate prototypes of the new Very Front End electronics. The final versions of the monitoring and cooling systems, and of the high and low voltage regulation were used in these tests. The results are consistent with the performance targets including those for noise and overall energy resolution, required to fulfil the physics programme of CMS at the LHC

    The CMS Barrel Calorimeter Response to Particle Beams from 2 to 350 GeV/c

    No full text
    The response of the CMS barrel calorimeter (electromagnetic plus hadronic) to hadrons, electrons and muons over a wide momentum range from 2 to 350 GeV/c has been measured. To our knowledge, this is the widest range of momenta in which any calorimeter system has been studied. These tests, carried out at the H2 beam-line at CERN, provide a wealth of information, especially at low energies. The analysis of the differences in calorimeter response to charged pions, kaons, protons and antiprotons and a detailed discussion of the underlying phenomena are presented. We also show techniques that apply corrections to the signals from the considerably different electromagnetic (EB) and hadronic (HB) barrel calorimeters in reconstructing the energies of hadrons. Above 5 GeV/c, these corrections improve the energy resolution of the combined system where the stochastic term equals 84.7±\pm1.6%\% and the constant term is 7.4±\pm0.8%\%. The corrected mean response remains constant within 1.3%\% rms
    corecore