124 research outputs found

    AC-feasible Local Flexibility Market with Continuous Trading

    Full text link
    This paper proposes a novel continuous Local Flexibility Market where active power flexibility located in the distribution system can be traded. The market design engages the Market Operator, the Distribution System Operator and Market Participants with dispatchable assets. The proposed market operates in a single distribution system and considers network constraints via AC network sensitivities, calculated at an initial network operating point. Trading is possible when AC network constraints are respected and when anticipated network violations are alleviated or resolved. The implementation allows for partial bid matching and is computationally light, therefore, suitable for continuous trading applications. The proposed design is thoroughly described and is demonstrated in a test distribution system. It is shown that active power trading in the proposed market design can lead to resolution of line overloads.Comment: In proceedings of the 11th Bulk Power Systems Dynamics and Control Symposium (IREP 2022), July 25-30, 2022, Banff, Canad

    HBIM FOR THE SURVEYING, ANALYSIS AND RESTORATION OF THE SAINT JOHN THE THEOLOGIAN CATHEDRAL IN NICOSIA (CYPRUS)

    Get PDF
    Abstract. The present study illustrates the results of an interdisciplinary collaboration between the Mediterranean Laboratory of Survey and Diagnostics for Architecture (RDA) of the Department of Civil Engineering and Architecture (DICAR) of the University of Catania in Italy and the Andreas Pittas Laboratories for Art Characterisation (APAC) of the Science and Technology in Archaeology Research Center (STARC) of the Cyprus Institute in Cyprus. The research focused on the application of an H-BIM approach in the study of a Mediterranean iconic heritage asset, the St. John Cathedral of Nicosia, built in 1662 on the remains of a monastery from the 15th century. The adopted methodology has provided the framework for a dynamic investigation, constantly evolving along several dimensions: historical, geometric spatial, architectural-constructive identification and mapping of degrade, interpretation of degenerative causes and design proposals.</p

    On-Line Monitoring for Temporal Logic Robustness

    Full text link
    In this paper, we provide a Dynamic Programming algorithm for on-line monitoring of the state robustness of Metric Temporal Logic specifications with past time operators. We compute the robustness of MTL with unbounded past and bounded future temporal operators MTL over sampled traces of Cyber-Physical Systems. We implemented our tool in Matlab as a Simulink block that can be used in any Simulink model. We experimentally demonstrate that the overhead of the MTL robustness monitoring is acceptable for certain classes of practical specifications

    Evaluation of load-following reserves for power systems with significant RES penetration considering risk management

    Get PDF
    In this study a novel two-stage stochastic programming based day-ahead joint energy and reserve scheduling model is developed. Demand-side as a reserve resource is explicitly modeled through responsive load aggregations, as well as large industrial consumers that directly participate in the scheduling procedure. Furthermore, a risk-hedging measure is introduced, namely the Conditional Value-at-Risk (CVaR), to analyze the behavior of energy and reserve scheduling by both the generation and the demand-side for a risk-averse ISO. The proposed methodology is tested on the practical non-interconnected insular power system of Crete, Greece, which is characterized by a significant penetration of Renewable Energy Sources (RES).Es la versiĂłn aceptada del documento. Se puede consultar la versiĂłn final en el DOI 10.1109/SEGE.2015.732457

    A Greek validation study of the Multiple Sclerosis Work Difficulties Questionnaire-23

    Get PDF
    The Multiple Sclerosis Work Difficulties Questionnaire-23 (MSWDQ-23) is a self-reportinstrument developed to assess barriers faced by People with Multiple Sclerosis (PwMS) in theworkplace. The aim of this study was to explore the psychometric properties of the Greek versionof the MSWDQ-23. The study sample consisted of 196 PwMS, all currently working in part- orfull-time jobs. Participants underwent clinical examination and cognitive screening with the BriefInternational Cognitive Assessment for Multiple Sclerosis (BICAMS) and completed self-reportmeasures of fatigue, psychological functioning, and quality of life, along with the MSWDQ-23questionnaire. Confirmatory Factor Analysis (CFA) was performed, and goodness-of-fit measureswere used to evaluate construct validity. Convergent validity was checked by correlating MSWDQ-23scores with study measures. Cronbach’s alpha value was produced to assess internal consistency.CFA yielded a model with a fair fit confirming the three-factor structure of the instrument. Higherwork difficulties were associated with higher Expanded Disability Status Scale (EDSS) scores, poorercognitive function, more fatigue, stress, anxiety, and depression, and poorer health status, supportingthe convergent validity of MSWDQ-23. Internal consistency (Cronbach’s alpha = 0.94) and test–retest reliability (ICC = 0.996, 95%, CI = 0.990–0.998) were excellent. The Greek MSWDQ-23 can beconsidered a valid patient-reported outcome measure and can be used in interventions aiming toimprove the vocational status of PwMS

    Last Men Standing: Chlamydatus Portraits and Public Life in Late Antique Corinth

    Get PDF
    Notable among the marble sculptures excavated at Corinth are seven portraits of men wearing the long chlamys of Late Antique imperial office. This unusual costume, contemporary portrait heads, and inscribed statue bases all help confirm that new public statuary was created and erected at Corinth during the 4th and 5th centuries. These chlamydatus portraits, published together here for the first time, are likely to represent the Governor of Achaia in his capital city, in the company of local benefactors. Among the last works of the ancient sculptural tradition, they form a valuable source of information on public life in Late Antique Corinth

    Large-scale unit commitment under uncertainty: an updated literature survey

    Get PDF
    The Unit Commitment problem in energy management aims at finding the optimal production schedule of a set of generation units, while meeting various system-wide constraints. It has always been a large-scale, non-convex, difficult problem, especially in view of the fact that, due to operational requirements, it has to be solved in an unreasonably small time for its size. Recently, growing renewable energy shares have strongly increased the level of uncertainty in the system, making the (ideal) Unit Commitment model a large-scale, non-convex and uncertain (stochastic, robust, chance-constrained) program. We provide a survey of the literature on methods for the Uncertain Unit Commitment problem, in all its variants. We start with a review of the main contributions on solution methods for the deterministic versions of the problem, focussing on those based on mathematical programming techniques that are more relevant for the uncertain versions of the problem. We then present and categorize the approaches to the latter, while providing entry points to the relevant literature on optimization under uncertainty. This is an updated version of the paper "Large-scale Unit Commitment under uncertainty: a literature survey" that appeared in 4OR 13(2), 115--171 (2015); this version has over 170 more citations, most of which appeared in the last three years, proving how fast the literature on uncertain Unit Commitment evolves, and therefore the interest in this subject
    • …
    corecore