24 research outputs found

    Adoption of Solar Grid-Tied PV-System Adopted in a Residential Building

    Full text link
    Emerging construction technologies focussing on the role and development of energy-conserving equipment can play a major role in solving a wide range of environmental and nature resource problems such as the greenhouse gas. Alternative energy is becoming a popular for property developers because of its potential of becoming more economically viable option when compared to current energy source-electricity. The objective of this research report is to conduct a cost-benefit analysis of adopting a solar energy technology specifically the solar grid-tied system by comparing the cost of initial investment and usage in a typical three bedroom residential building a conventional electricity power supply. Using a case study research approach, the research findings showed that the PV system is more cost-effective in the long term compared to the conversional electricity supply. Although the pre-investment is relatively high in the PV system, it is a reliable investment in the long-term. It is important to emphasise that the use energy efficient appliances, lighting, insulation and double glassing has enhanced the effectiveness of the system. Keywords: Photovoltaic system (PV); Solar energy; Cost-effectivenes

    Establishing the limitations of sustainable construction in developing countries: a systematic literature review using PRISMA.

    Get PDF
    Establishing a more sustainable built environment is an increasing global concern for the construction industry. Despite the intrinsic and extrinsic obstacles the stakeholders face, huge efforts are required to transition to a smooth, sustainable construction (SC) practice. This study identifies and discusses cogent obstacles to SC in developing nations. The Preferred Reporting Item for systematic reviews and Meta-Analysis (PRISMA) approach was employed to establish research work in SC for developing countries. The databases used were Scopus and Web of Science. Meta-analysis of keywords was analysed thematically. The initial broad search returned 8,420 publications which were filtered and reviewed in-depth to fit the aim of the study, produced only 21 relevant publications from the years 2000–2021. The four identified themes of obstacles to SC in developing countries are as follows: construction professional training and education, clients' attitudes and awareness, construction industries' culture and capacity and governments' regulation, policies and economy. The key barriers identified from the metaanalysis include inadequate training and education amongst construction professionals, poor execution of sustainability ethics, poor populace attitude towards sustainability, poor awareness and understanding, dearth of precise data and integrated study and inappropriate priorities about sustainability. The originality in this study are themes drawn from millennium development goals (MDGs) and sustainable development goals (SDGs) publications related to SC. Consequently, the final framework presented a holistic approach to surmounting the established limitations and aided recommendations for future studies. Thus, setting a background for developing strategies to overcome the limitations and further attain sustainable development (SD)

    Drivers of Applying Ecological Modernization to Construction Waste Minimization in New South Wales Construction Industry

    Get PDF
    The application of ecological modernization (EM) (to delink industry growth from environmental damage) to minimize construction waste has not been explored within the construction industry in general, and the New South Wales (NSW) construction industry in particular. This study seeks to identify the drivers of applying EM to construction waste minimisation (CWM) in the industry. Also, to determine the CWM measures that are critical for each of the drivers. A survey was adopted in this study to target stakeholders engaged in the delivery of construction projects in NSW from design to completion. The survey was selected to reach a large number of respondents within a manageable period. A pilot study was conducted to ensure the reliability of the research design before a full-scale data collection was launched. The data from 240 valid responses was analysed using factor analysis, relative importance index and descriptive statistics. The results revealed five important drivers for EM’s application to CWM. These are agents of change, government policies, supply chain dynamics, skill-building and technological innovations. The CWM measures that are critical for each of these drivers were also identified. The study provides insights into the application of EM to address the construction industry problem of waste generation as by-product of its growth. It also shows the ability to protect the environment while enabling continuous economic growth. Furthermore, it demonstrates the applicability of EM to minimize the construction waste of NSW construction industry

    Stakeholders' practices: a challenge to earthquake risk mitigation decisions

    Get PDF
    Enhancing building owners’ earthquake risk preparedness has been a major challenge in many seismically active regions. Many property owners are found unwilling to adopt adequate risk mitigation measures in their earthquake-prone buildings, despite the availability of various technical design solutions and the enactment of intervening legislative frameworks necessary to facilitate successful earthquake risk preparedness. This paper examined the rationale behind building owners’ unwillingness to adopt adequate mitigation measures with a view to improve current stakeholders’ practices in earthquake risk mitigation. Using a mixed-method approach, comprising both qualitative and quantitative methods, an examination of the decision-making process and different stakeholders involved in earthquake risk mitigation and the property market, provided insights into the causal agents and stakeholder practices that pose challenges to property owners’ mitigation decisions. Stake-holder practices acting as impediments revealed are property valuation assessment of retrofitted and non-retrofitted EPBs, lack of demand for improved performance in older buildings, high earthquake insurance policy premiums and deductibles, and lack of a risk assessment information system. An in-depth understanding of these challenges highlights the need for a holistic approach that should incorporate market-based incentives necessary for successful earthquake preparedness by building owners, and for designing effective strategies for improving earthquake risk mitigation

    Five drivers

    No full text

    INTEGRATED FRAMEWORK FOR ENHANCING EARTHQUAKE RISK MITIGATION DECISIONS

    No full text
    Attribution - NonCommercial - NoDerivs 3.0 New Zealand licence ( CC BY - NC - ND )The increasing scale of losses from earthquake disasters has reinforced the need for property owners to become proactive in seismic risk reduction programs. However, despite advancement in seismic design methods and legislative frameworks, building owners are found unwilling or lack motivation to adopt adequate mitigation measures that will reduce their vulnerability to earthquake disasters. Various theories and empirical findings have been used to explain the adoption of protective behaviours including seismic mitigation decisions, but their application has been inadequate to enhance building owners’ protective decisions. A holistic framework that incorporates the motivational orientations of decision-making, coupled with the social, cultural, economic, regulatory, institutional and political realms of earthquake risk mitigation to enhance building owners’ decisions to voluntarily implement adequate mitigation measures, is proposed. This framework attempts to address any multi-disciplinary barriers that exist in earthquake disaster management, by ensuring that stakeholders involved in seismic mitigation decisions work together to foster seismic rehabilitation of EPBs, as well as illuminate strategies that will initiate, promote and sustain the adoption of long-term earthquake mitigation.falsefalsefals