42 research outputs found

    Perbandingan Kandungan Zat Gizi Ikan Mujair Oreochormis Mossambica Danau Universitas Hasanuddin Makasasar Dan Ikan Danau Mawang Gowa

    Full text link
    Penelitian tentang “Perbandingan Kandungan Zat Gizi Ikan Mujair Oreochromis mossambica Danau Universitas Hasanuddin Makassar dan Ikan Danau Mawang Gowa” telah dilakukan pada bulan Mei 2016. Tujuan penelitian, yaitu: mengetahui perbandingan kandungan gizi ikan mujair O. mossambica asal danau Unhas (Universitas Hasanuddin) Makassar dan ikan mujair asal danau Mawang, Gowa. Sulawesi Selatan. Penelititan ini bersifat kualitatif. Pengukuran kadar protein menggunakan metode Kjeldhal, kadar lemak menggunakan metode Soxhlet, kadar karbohidrat menggunakan metode Luff Scrhoorll dan kadar mineral dengan menggunakan metode ASS dan Spektrofotometer UV-Vis. Hasil penelitian menunjukkan besar kandungan gizi ikan mujair asal danau Unhas, yaitu: Protein 14.16 g, Lemak 0.51 g, dan Karbohidrat 0.27 g, sedangkan kandungan gizi ikan mujair asal danau Mawang., yaitu Protein : 11.95 g, Lemak : 0.16 g, Karbohidrat : 0.18 g. Kandungan mineral ikan Mujair asal danau Unhas., yaitu: Kalsium 2.93 mg, Phosfat 370 mg, Besi 0.61 mg, sedangkan kandungan mineral ikan mujair asal danau Mawang, yaitu: Kalsium 4.46 mg, Phosfat 490 mg, dan Besi 3.49 mg

    Peningkatan Motivasi Belajar melalui Layanan Bimbingan Kelompok dengan Permainan Tebak Kata

    Full text link
    The research aims to analyze: (1) diffrerence student’s motivation before and after being given group guidance service, (2) diffrerence student’s motivation before and after being given word games crush in group guidance service, and (3) diffrerence student’s motivation being given group guidance an word games crush in group guidance service. The population ini this research were students of class VII, while sample of research were students of class VII A dan VII D. From the research it can be conclude (1) there is difference of student’s motivation before and after after being given group guidance service. (2) There is difference of student’s motivation before and after after being given word games crush in group guidance service. 3) There is difference of student’s motivation being given group guidance service and being given word games crush in group guidance service.Penelitian ini bertujuan untuk menganalisis : (1) perbedaan motivasi siswa sebelum dan sesudah layanan bimbingan kelompok. (2) perbedaan motivasi siswa sebelum dan sesudah layanan bimbingan kelompok dengan permainan tebak kata dan (3) perbedaan motivasi siswa yang diberi layanan bimbingan kelompok dan siswa yang diberi layanan bimbingan kelompok dengan permainan tebak kata. Penelitian ini dilaksanakan di SMP Negeri 5 Natar Lampung Selatan tahun pelajaran 2012/2013.Populasi penelitian ini adalah kelas VII, sedangkan sampel penelitian ini adalah kelas VII A dan Kelas VII D. Hasil penelitian disimpulkan (1) Ada perbedaan motivasi siswa sebelum dan  setelah diberi layanan bimbingan kelompok. (2) ada perbedaan motivasi siswa sebelum dan setelah diberi layanan bimbingan kelompok menggunakan permainan tebak kata. (3) ada perbedaan motivasi siswa yang diberi layanan kelompok dengan siswa yang diberi layanan bimbingan kelompok menggunakan permainan tebak kata

    Pemanfaatan Limbah Sayur Kubis Brassica Oleracea dan Buah Pepaya Carica Papaya sebagai Pakan Cacing Tanah Lumbricus Rubellus

    Full text link
    Penelitian Pemanfaatan Limbah Sayur Kubis Brassica oleracea dan Buah Pepaya Carica papaya Sebagai Pakan Cacing Tanah Lumbricus rubellus sudah dilakukan selama dua bulan. Penelitian ini bertujuan untuk mengetahui pertumbuhan cacing tanah pada tiga jenis pakan yaitu kotoran sapi, limbah sayur kubis, dan limbah buah papaya. Limbah sayur kubis dan limbah buah papaya difermentasikan selama tujuh hari. Penelitian ini merupakan penelitian eksperimen dengan rancangan acak lengkap (RAL), tiga perlakuan dan lima ulangan. Pengamatan dilakukan setiap dua minggu selama delapan minggu. Data dianalisis dengan analisis varians (ANOVA) dan dilanjutkan dengan uji Duncan. Hasil penelitian menunjukkan perlakuan dari limbah buah pepaya mempunyai nilai pertumbuhan berat 0.16 – 0.20 g, limbah sayur kubis dengan berat 0.12-0.14 g, dan kotoran sapi dengan berat 0.10 – 0.12 g. Pertumbuhan panjang dari limbah buah pepaya yaitu 0.9 -1.2 cm, limbah sayur kubis dengan panjang 0.89 – 0.99 cm, dan kotoran sapi 0.63 – 0.90 cm. Penggunaan limbah buah pepaya memberikan hasil terbaik dengan pertumbuhan berat 0.16 – 0.20 g dan panjang 0.9 -1.2 cm

    Pengaruh Konsentrasi Kolkhisin Terhadap Pertumbuhan Dan Produksi Kacang Hijau (Vigna Radiata L.)

    Full text link
    The Effect of Cholchisine Consentration to Growth and Produduction Green Beans (Vignaradiata L.) supervised by EVA SARTINI BAYU and HASMAWI HASYIM. One of thebreeding program that can be used to developed new varieties by using breeding mutation thatusing by colchisine consentration. The experiment had been conducted at Tumpatan NibungBatangkuis, Deli Serdang, Sumatera Utara (± 25 metres asl) during March until Juny 2012nd byusing randomized block design that were K0 (0%); K1 (0,04 %); K2 (0,08); K3 (0,12%); K4(0,16%) and then continued with Duncan\u27s Multiple Range Test (DMRT). The parameters weregermination percentage, plant height, leaf numbers, flower ages, weight of pods dry ,number ofpods containing, number of seeds in each pods and 100 seeds weight. The result showed thatapplication colchisin significantly effected on growths: plant height and number of leafs, andalso production parameters such as: flower ages, weight of pods dry, number of pods containing,and number of seeds in each pods

    “Analisa Perbandingan Metode SNI Dan Software MS. Project Dalam Perhitungan Harga Satuan Pekerjaan Penutup Lantai Dan Dinding Serta Pemasangan Paving Block Untuk Konstruksi Bangunan” (Studi Kasus Proyek Pembangunan Gedung II Dan Bangunan Penghubung FISIP,

    Full text link
    Pelaksanaan suatu pekerjaan konstruksi bangunan berhubungan erat dengan biaya. Acuan dasar dalam perhitungan biaya suatu bangunan adalah analisa harga satuan pekerjaan, yang mana dengan analisa tersebut akan didapatkan rencana anggaran biaya (RAB). Pembangunan sebuah gedung memiliki berbagai macam jenis pekerjaan salah, diantaranya adalah pekerjaan penutup lantai dan dinding serta pemasangan paving block . Dalam menghitunga analisa biaya suatu proyek kebanyakan perencana menggunakan SNI sebagai dasar acuan koefisien bahan dan pekerja, akan tetapi seiring perkembangan bahan material yang berada dipasaran tidak memungkinkan untuk menggunkan SNI sebagai dasar dalam perhitungan koefisien bahan, begitu juga untuk koefisien yang dipakai untuk pekerja tidak memiliki kesamaan dengan yang ada dalam SNI. Oleh karena itu dilakukan penelitian untuk membandingkan analisa harga satuan metode SNI dengan metode MS. Project..Setelah dilakukan analisa perhitungan estimasi biaya menggunakan dua metode yang berbeda, perhitungan menggunakan MS. Project menunjukkan hasil yang lebih murah dan mendekati Kenyataan kebutuhan yang ada di lapangan daripada metode SNI. Biaya total pekerjaan yang dihitung menggunakan metode SNI adalah Rp 980.087.058,90. Sedangkan yang dihitung menggunakan metode MS. Project adalah Rp 842.241.502,00. Selisih dari kedua biaya total yang dihitung dengan kedua metode yang berbeda adalah Rp 137.845.556,90. Selisih yang didapat ini didasarkan pada perbedaan biaya total upah pekerja yang dipakai dalam metode perhitungan

    Analisis Risiko Keselamatan Dan Kesehatan Kerja (K3) Dengan Metode Hazard Analysis Dan Consequence – Likelihood Analysis (Studi Kasus Pada Proyek Pembangunan Gedung Baru Fakultas Ilmu Administrasi Universitas Brawijaya)

    Full text link
    Semua proyek konstruksi pasti memiliki risiko. Risiko tersebut salah satunya adalah risiko terjadinya kecelakaan. Masalah Keselamatan dan Kesehatan Kerja (K3) saat ini masih belum menjadi perhatian utama. Hal itu dapat dilihat dari angka kecelakaan kerja di sektor konstruksi tertinggi dibanding dengan kecelakaan kerja di bidang lainnya. Hasil akhir dari penelitian ini adalah untuk mengidentifikasi pekerjaan yang berisiko menimbulkan bahaya pada Proyek Pembangunan Gedung baru Fakultas Ilmu Admistrasi Universitas Brawijaya kemudian menilai tingkat risiko secara umum dan menentukan pengendalian risiko yang tepat pada proyek tersebut. Risiko yang terjadi dinilai dengan menggunakan metode Consequence-Likelihood Analysis (CLA). Keluaran dari pengolahan dengan menggunakan metode CLA akan diketahui tingkat risiko secara umum pada proyek Pembangunan Gedung Baru Fakultas Ilmu Administrasi Universitas Brawijaya. Langkah terakhir dari penelitian ini yaitu menentukan pengendalian dan respon risiko dengan menggunakan metode Hazard Analysis dengan berdasarkan hasil kuisioner dan wawancara terhadap pengawas ataupun tenaga ahli pada proyek tersebut
    corecore