22 research outputs found

    Etude et résolution de problèmes d'ordonnancement de projets multi-compétences : intégration à un ERP libre

    Get PDF
    The work presented in this thesis deals with multi-skill project scheduling problems.We have studied two models of project scheduling which are defined in collaboration with project management experts in Néréide company.In the first model, a task is defined by a set of required skills, the load needed for each skill as well as the possibility of preemption. To build a predictive planning witch respects all problem constraints and minimize the project completion time (makespan), we propose heuristics and meta-heuristis methods. A mixed integer mathematical linear programming model and lower bounds are also proposed. From a predefined planning, we propose an exact method based on a mathematical program as well as a genetic algorithm of type NSGA-II allowing to deal with disruptions occurred during the project realization. It is, therefore, a reactive approach in which we look for feasible solutions minimizing both the project completion date and the maximum number of resources assignment changes.In the second studied model, we focus on a case where a task exactly requires one skill with preemption possibility only in case of resources unavailability. In this model, a task is also characterized by its release and due date. A cost per person/skill is given. It is,therefore, a bi-objective problem in which the computed solutions must minimize boththe maximum tardiness and the project global cost. Heuristics and meta-heuristics are proposed for solving this problem.Some proposed methods are integrated in the framework OFBiz as add-ons.Les travaux de cette thèse réalisée sous contrat CIFRE portent sur des problématiques d’ordonnancement de projets multi-compétences définis en collaboration avec des experts de gestion de projet au sein de la société Néréide, deux modèles d’ordonnancement de projet font l'objet de cette étude.Dans le premier modèle, une tâche est définie par l'ensemble des compétences dont elle a besoin, la charge nécessaire de chaque compétence ainsi que la possibilité d'être interrompue ou non. Pour l'élaboration d'un planning prédictif respectant toutes les contraintes et minimisant la date de n du pro jet, nous proposons des heuristiques de liste et métaheuristiques. Un modèle mathématique linéaire en nombres entiers ainsi que des bornes inférieures sont également développés. Dans un second temps, nous proposons, à partir d'un planning prédéfini, des méthodes pour ajuster le planning et répondre aux aléas survenus lors du déroulement du pro jet. Pour résoudre ce problème réatif, nous proposons une approche exacte itérative basée sur une formulation linéaire en nombres entiers ainsiqu'un algorithme génétique de type NSGA-II. Il s'agit donc d'une approche réactive bi-critère où les solutions calculées doivent minimiser à la fois la date d'achèvement du projet et le nombre maximum de changements d'aaffectation de tâches aux employés. Dans le deuxième modèle, un cas particulier du modèle préemptif précédent est étudié.Nous nous intéressons au cas où une tâche nécessite une seule compétence avec possibilité depréemption seulement si les ressources ne sont pas disponibles (absence, congés, et.). Dans ce modèle, une tâche est définie également par sa date de disponibilité et une date de nsouhaitée. Un coût d'utilisation personne/compétence est introduit. Pour ce dernier modèle,il s'agit d'un problème d'ordonnancement de projet bi-critère, pour lequel les solutions calculées doivent minimiser le retard maximum et le coût global d'affectation des personnes aux tâches. Des heuristiques et métaheuristiques sont proposées pour ce modèle.Certaines méthodes de résolution proposées ont été implémentées sous forme d'add-onsintégrables au framework OFBiz

    Etude et résolution de problèmes d'ordonnancement de projets multi-compétences (Intégration à un progiciel intégré libre)

    Get PDF
    Les travaux de cette thèse réalisée sous contrat CIFRE portent sur des problématiques d ordonnancement de projets mufti-compétences. Définis en collaboration avec des experts de gestion de projet au sein de la société Néréide, deux modèles d ordonnancement de projet font l objet de cette étude. Dans le premier modèle, une tâche est définie par l ensemble des compétences dont elle a besoin, la charge nécessaire de chaque compétence ainsi que la possibilité d être interrompue ou non. Pour l élaboration d un planning prédictif respectant toutes les contraintes et minimisant la date de fin du projet, nous proposons des heuristiques de liste et métaheuristiques. Un modèle mathématique linéaire en nombres entiers ainsi que des bornes inférieures sont également développés. Dans un second temps, nous proposons, à partir d un planning prédéfini, des méthodes pour ajuster le planning et répondre aux aléas survenus lors du déroulement du projet. Pour résoudre ce problème réactif, nous proposons une approche exacte itérative basée sur une formulation linéaire en nombres entiers ainsi qu un algorithme génétique de type NSGA-II. Il s agit donc d une approche réactive bicritère où les solutions calculées doivent minimiser à la fois la date d achèvement du projet et le nombre maximum de changements d affectation de tâches aux employés. Dans le deuxième modèle, un cas particulier du modèle préemptif précédent est étudié. Nous nous intéressons au cas où une tâche nécessite une seule compétence avec possibilité de préemption seulement si les ressources ne sont pas disponibles (absence, congés, etc.). Dans ce modèle, une tâche est définie également par sa date de disponibilité et une date de fin souhaitée. Un coût d utilisation personne/compétence est introduit. Pour ce dernier modèle, il s agit d un problème d ordonnancement de projet bicritère, pour lequel les solutions calculées doivent minimiser le retard maximum et le coût global d affectation des personnes aux tâches. Des heuristiques et métaheuristiques sont proposées pour ce modèle. Certaines méthodes de résolution proposées ont été implémentées sous forme d add-ons intégrables au framework OFBiz.The work presented in this thesis deals with multi-skill project scheduling problems. We have studied two models of project scheduling which are defined in collaboration with project management experts in Néréide company. In the first model, a task is defined by a set of required skills, the load needed for each skill as welI as the possibility of preemption. To build a predictive planning which respects aIl problem constraints and minimize the project completion time (makespan), we propose heuristics and meta-heuristics methods. A mixed integer mathematical linear programming model and lower bounds are also proposed. From a predefined planning, we propose an exact method based on a mathematical program as weIl as a genetic algorithm of type NSGA-II allowing to deal with disruptions occurred during the project realization. It is, therefore, a reactive approach in which we look for feasible solutions minimizing both the project completion date and the maximum number of resources assignment changes. In the second studied model, we focus on a case where a task exactly requires one skill with preemption possibility only in case of resources unavailability. In this model, a task is also characterized by its release and due date. A cost per person/skill is given. It is, therefore, a bi-objective problem in which the computed solutions must minimize both the maximum tardiness and the project global cost. Heuristics and meta-heuristics are proposed for solving this problem. Some proposed methods are integrated in the framework OFBiz as add-ons.TOURS-Bibl.électronique (372610011) / SudocSudocFranceF

    Study and resolution methods for multi-skill projects scheduling problems : intégration à un progiciel intégrée libre

    No full text
    Les travaux de cette thèse réalisée sous contrat CIFRE portent sur des problématiques d’ordonnancement de projets mufti-compétences. Définis en collaboration avec des experts de gestion de projet au sein de la société Néréide, deux modèles d’ordonnancement de projet font l’objet de cette étude. Dans le premier modèle, une tâche est définie par l’ensemble des compétences dont elle a besoin, la charge nécessaire de chaque compétence ainsi que la possibilité d’être interrompue ou non. Pour l’élaboration d’un planning prédictif respectant toutes les contraintes et minimisant la date de fin du projet, nous proposons des heuristiques de liste et métaheuristiques. Un modèle mathématique linéaire en nombres entiers ainsi que des bornes inférieures sont également développés. Dans un second temps, nous proposons, à partir d’un planning prédéfini, des méthodes pour ajuster le planning et répondre aux aléas survenus lors du déroulement du projet. Pour résoudre ce problème réactif, nous proposons une approche exacte itérative basée sur une formulation linéaire en nombres entiers ainsi qu’un algorithme génétique de type NSGA-II. Il s’agit donc d’une approche réactive bicritère où les solutions calculées doivent minimiser à la fois la date d’achèvement du projet et le nombre maximum de changements d’affectation de tâches aux employés. Dans le deuxième modèle, un cas particulier du modèle préemptif précédent est étudié. Nous nous intéressons au cas où une tâche nécessite une seule compétence avec possibilité de préemption seulement si les ressources ne sont pas disponibles (absence, congés, etc.). Dans ce modèle, une tâche est définie également par sa date de disponibilité et une date de fin souhaitée. Un coût d’utilisation personne/compétence est introduit. Pour ce dernier modèle, il s’agit d’un problème d’ordonnancement de projet bicritère, pour lequel les solutions calculées doivent minimiser le retard maximum et le coût global d’affectation des personnes aux tâches. Des heuristiques et métaheuristiques sont proposées pour ce modèle. Certaines méthodes de résolution proposées ont été implémentées sous forme d’add-ons intégrables au framework OFBiz.The work presented in this thesis deals with multi-skill project scheduling problems. We have studied two models of project scheduling which are defined in collaboration with project management experts in Néréide company. In the first model, a task is defined by a set of required skills, the load needed for each skill as welI as the possibility of preemption. To build a predictive planning which respects aIl problem constraints and minimize the project completion time (makespan), we propose heuristics and meta-heuristics methods. A mixed integer mathematical linear programming model and lower bounds are also proposed. From a predefined planning, we propose an exact method based on a mathematical program as weIl as a genetic algorithm of type NSGA-II allowing to deal with disruptions occurred during the project realization. It is, therefore, a reactive approach in which we look for feasible solutions minimizing both the project completion date and the maximum number of resources assignment changes. In the second studied model, we focus on a case where a task exactly requires one skill with preemption possibility only in case of resources unavailability. In this model, a task is also characterized by its release and due date. A cost per person/skill is given. It is, therefore, a bi-objective problem in which the computed solutions must minimize both the maximum tardiness and the project global cost. Heuristics and meta-heuristics are proposed for solving this problem. Some proposed methods are integrated in the framework OFBiz as add-ons

    Problème de gestion de projet à contraintes de personnel : une approche de résolution par les règles

    No full text
    International audienceLes problèmes de gestion de projet ont été largement étudiés dans la littérature ces dernières années. Aujourd'hui, l'organisation en mode projet concerne de plus en plus les entreprises, y compris celles de services afin de répondre à une demande client ou tout simplement à une demande d'intervention. Ainsi, il devient important de proposer dans des environnements intégrés type ERP, des modules permettant la gestion de projet. La spécificité des projets adressés dans ce cas tient au fait que les problèmes sont traités dans un contexte industriel, en intégrant par exemple des problématiques d'emploi du temps des personnes et de planification de personnel. Cette étude s'inscrit dans le cadre d'une convention CIFRE

    Project Scheduling in an industrial context

    No full text
    International audienc
    corecore