5 research outputs found

    Key Factors on Utilizing the Production System Design Phase for Increasing Operational Performance

    No full text
    Production system lifecycle includes phases ranging from concept pre-study to ramp-up and operations. Manufacturing companies often face challenges to reach operational performance targets during ramp-up time and operation phase. The design phase is considered crucial as major decisions related to the future production system are taken during this phase. There is an opportunity to utilize the production system design phase to improve the operational performance during both the ramp-up and operation phase. This research aims to identify the critical factors of the design process that affect the performance in the ramp-up and operational phase. A case study was conducted in a pharmaceutical company where a completed project of launching a new production line for a new product was followed in retrospect. Data were collected by conducting interviews with different members involved in the project and the production team on the shop floor. By qualitative data analysis, critical factors affecting the project´s operational performance were identified; such as level of internal technical competency; involvement level of future line manager, operator and project sponsor within the project team; project team´s competency; pre-study of the business case; time pressure to complete the project; expertise of product and process; organization’s continuous improvement culture; and relationship with the supplier. © 2020, IFIP International Federation for Information Processing.QC 20200930</p

    Critical Factors for Successful User-Supplier Integration in the Production System Design Process

    No full text
    Part 2: Design, Manufacturing and Production ManagementInternational audienceIntegration of equipment suppliers in the design of the production system has often been associated with major benefits. However, from a managerial perspective, integration between the user and the suppliers of the production equipment is still challenging. Therefore, the purpose of the research is to explore how manufacturing companies can facilitate and manage equipment supplier integration when designing the production system. Based on an real time case study in the automotive industry 10 critical factors for successful supplier/user integration are identified, which can be classified into three categories: human factors, project management factors and design factors
    corecore