253 research outputs found
Pyramidal Atoms: Berylliumlike Hollow States
Based on the idea that four excited electrons arrange themselves around the
nucleus in the corners of a pyramid in order to minimize their mutual
repulsion, we present an analytical model of quadruply excited states. The
model shows excellent comparison with ab initio results and provides a clear
physical picture of the intrinsic motion of the four electrons. The model is
used to predict configuration-mixing fractions and spectra of these highly
correlated states.Comment: 4 pages, 2 figure
Ecofeminism in the 21st Century
This paper considers the influence of ecofeminism on policy concerning gender (in)equality and the environment during the past 20 years. It reviews the broad contours of the ecofeminist debate before focusing on the social construction interpretation of women's relationship with the environment. It will argue that there have been substantial policy shifts in Europe and the UK in both the environmental and equalities fields, and that this is in part a result of lobbying at a range of scales by groups informed by ecofeminist debates. Nevertheless, the paper cautions that these shifts are largely incremental and operate within existing structures, which inevitably limit their capacity to create change. As policy addresses some of the concerns highlighted by ecofeminism, academic discourse and grass roots activity have been moving on to address other issues, and the paper concludes with a brief consideration of contemporary trajectories of ecofeminism and campaigning on issues that link women's, feminist and environment concerns
First Powering of the LHC Test String 2
String 2 is a full-size model of a regular cell in an LHC arc. In the first phase, three dipole magnets and two quadrupole magnets have been assembled in String 2 and commissioning started in April 2001. By the beginning of 2002 three pre-series dipole magnets will be added to complete the cell. As for its predecessor String 1, the facility was built to individually validate the LHC systems and to investigate their collective behaviour for normal operation with the magnets at a temperature of 1.9 K, during transients as well as during exceptional conditions. String 2 is a precious milestone before installation and commissioning of the first LHC sector (1/8 of the machine) in 2004, with respect to infrastructure, installation, tooling and assembly procedures, testing and commissioning of individual systems, as well as the global commissioning of the technical systems. This paper describes the commissioning, and retraces the first powering history
Experiments and cycling at the LHC prototype helf-cell
The first version of the LHC prototype half-cell has been in operation since February 1995. It consists of one quadrupole and three 10-m twin aperture dipole magnets which operate at 1.8 K. This experimental set-up has been used to observe and study phenomena which appear when the systems are assembled in one unit and influence one another. The 18-month long experimental program has validated the cryogenic system and yielded a number of results on cryogenic instrumentation, magnet protection and vacuum in particular under non-standard operating conditions. The program was recently complemented by the cycling experiment: it consisted in powering the magnets following the ramp rates which will be experienced by the magnets during an LHC acceleration. In order to simulate 10 years of routine operation of LHC, more than 2000 1-hour cycles were performed interleaved with provoked quenches. The objective of this experiment was to reveal eventual flaws in the design of components. The prototype half-cell performed to expectations showing no sign of failure of fatigue of components for more than 2000 cycles until one of the dipoles started exhibiting an erratic quench behavior
The Commissioning of the LHC Test String 2
String 2 [1,2] is a full-size model of an LHC cell of the regular part of the arc. It is composed of six dipole magnets with their correctors, two short straight sections with their orbit and lattice corrector magnets, and a cryogenic distribution line running alongside the magnets. The commissioning of String 2 Phase 1, with one half-cell and the following quadrupole, has started in April 2001. As for String 1 [3], the facility was built to individually validate the LHC systems and to investigate their collective behaviour during normal operation (pump-down, cool-down and powering) as well as during exceptional conditions such as quenches. String 2 is a stepping stone towards the commissioning of the first sector (one eight of LHC) planned for 2004. It is expected to yield precious information on the infrastructures, the installation, the tooling and the procedures for the assembly, the testing and the commissioning of the individual systems, as well as the global commissioning of the technical systems. This paper describes the procedures followed for the commissioning and details the preparation for the first cool-down and for the powering
First Results and Status of the LHC Test String 2
After the commissioning of String 2 Phase1 and the powering of the main circuits in autumn 2001, a short yet vigorous experimental program was carried-out to validate the final design choices for the technical systems of LHC. This program included the investigation of thermo-hydraulics of quenches quench propagation, power converter controls and tracking between power converters, as well as the measurement of currents induced in the beam screen after a quench and crossing the interconnects. Parameters significant for the LHC, such as heat loads, were also measured. During the winter shutdown the String was completed to a full cell with the addition of three pre-series dipoles (Phase 2). After a short description of the layout of Phase 1 and Phase 2, the results of the experiments are presented and the future experimental program is outlined
The LHC test string: first operational experience
CERN operates the first version of the LHC Test String which consists of one quadrupole and three 10-m twin aperture dipole magnets. An experimental programme aiming at the validation of the LHC systems started in February 1995. During this programme the string has been powered 100 times 35 of which at 12.4 kA or above. The experiments have yielded a number of results some of which, like quench recovery for cryogenics, have modified the design of subsystems of LHC. Others, like controlled helium leaks in the cold bore and quench propagation bewteen magnets, have given a better understanding on the evolution of the phenomena inside a string of superconducting magnets cooled at superfluid helium temperatures. Following the experimental programme, the string will be powered up and powered down in one hour cycles as a fatigue test of the structure thus simulating 20 years of operation of LHC
Environmental factors in a population-based inception cohort of inflammatory bowel disease patients in Europe--an ECCO-EpiCom study.
To access publisher's full text version of this article click on the hyperlink at the bottom of the pageThe incidence of inflammatory bowel disease (IBD) is increasing in Eastern Europe possibly due to changes in environmental factors towards a more "westernised" standard of living. The aim of this study was to investigate differences in exposure to environmental factors prior to diagnosis in Eastern and Western European IBD patients.The EpiCom cohort is a population-based, prospective inception cohort of 1560 unselected IBD patients from 31 European countries covering a background population of 10.1 million. At the time of diagnosis patients were asked to complete an 87-item questionnaire concerning environmental factors.A total of 1182 patients (76%) answered the questionnaire, 444 (38%) had Crohn's disease (CD), 627 (53%) ulcerative colitis (UC), and 111 (9%) IBD unclassified. No geographic differences regarding smoking status, caffeine intake, use of oral contraceptives, or number of first-degree relatives with IBD were found. Sugar intake was higher in CD and UC patients from Eastern Europe than in Western Europe while fibre intake was lower (p<0.01). Daily consumption of fast food as well as appendectomy before the age of 20 was more frequent in Eastern European than in Western European UC patients (p<0.01). Eastern European CD and UC patients had received more vaccinations and experienced fewer childhood infections than Western European patients (p<0.01).In this European population-based inception cohort of unselected IBD patients, Eastern and Western European patients differed in environmental factors prior to diagnosis. Eastern European patients exhibited higher occurrences of suspected risk factors for IBD included in the Western lifestyle.Danish Colitis Crohn Patients Organisation (CCF)
Vibeke Binder and Povl Riis Foundation
Scientific Council at Herlev Hospital
Sigrid Rignnor Moran Foundation, Aage and Johanne Louis-Hansens Foundation
Munkholm Foundation
C.C. Klestrup and Henriette Klestrup Foundation
Knud and Dagny Gad Andresens Foundation
Else and Mogens Wedell-Wedellsborgs Foundation
Direktor Jacob Madsen and Olga Madsen's Foundation, Scan Ve
Performance of the Main Dipole Magnet Circuits of the LHC during Commissioning
During hardware commissioning of the Large Hadron Collider (LHC), 8 main dipole circuits are tested at 1.9 K and up to their nominal current. Each dipole circuit contains 154 magnets of 15 m length, and has a total stored energy of up to 1.3 GJ. All magnets are wound from Nb-Ti superconducting Rutherford cables, and contain heaters to quickly force the transition to the normal conducting state in case of a quench, and hence reduce the hot spot temperature. In this paper the performance of the first three of these circuits is presented, focussing on quench detection, heater performance, operation of the cold bypass diodes, and magnet-to-magnet quench propagation. The results as measured on the entire circuits will be compared to the test results obtained during the reception tests of the individual magnets
Performance of the Superconducting Corrector Magnet Circuits during the Commissioning of the LHC
The LHC is a complex machine requiring more than 7400 superconducting corrector magnets distributed along a circumference of 26.7 km. These magnets are powered in 1446 different electrical circuits at currents ranging from 60Â A up to 600 A. Among the corrector circuits the 600 A corrector magnets form the most diverse and differentiated group. All together, about 60000 high current connections had to be made. A fault in a circuit or one of the superconducting connections would have severe consequences for the accelerator operation. All magnets are wound from various types of Nb-Ti superconducting strands, and many contain parallel protection resistors to by-pass the current still flowing in the other magnets of the same circuit when they quench. In this paper the performance of these magnet circuits is presented, focussing on the quench behaviour of the magnets. Quench detection and the performance of the electrical interconnects will be dealt with. The results as measured on the entire circuits are compared to the test results obtained at the reception of the individual magnets
- …
