9 research outputs found
Conceptual design for Mobile Geological Laboratory position and heading fix system
Conceptual design of position fixing system for Mobile Geological Laboratory in Lunar Mobile Laboratory simulatio
Recommendations for minimizing green crud
The Array A-2 Green Crud problem, the investigation, and resulting recommendations were presented in ATM 1059 of 23 September 1971. With the occurrence of Green Crud in the Array E system in January, 1972 a second investigation of the means to prevent and/or remedy Green Crud was initiated. This ATM describes the results of this latter investigation.prepared by J. Matthis, D. K. Breseke
Lunar navigation study, sections 1 through 7 Final report, Jun. 1964 - May 1965
Lunar navigation analysis using passive nongyro, inertial navigation, and radio frequency technolog
Lunar navigation study, summary volume Final report, Jun. 1964 - May 1965
Lunar surface navigation and guidance study to implement lunar surface vehicle exploration mission
Lunar navigation study, sections 8 through 10 and appendices Final report, Jun. 1964 - May 1965
Component capabilities and requirements for lunar navigation concept
Plating of Passive Seismic Experiment leveling stool
This ATM reviews the PSE Stool Plating Materials and Processes and briefly summarizes the thermal changes expected as a result of a loss of gold plate.prepared by D. K. Breseke, G Psaros
Apollo 15 Passive Seismic Experiment anomalies
This ATM presents the results of the Apollo 15 Passive Seismic Experiment (PSE) Anomalies Investigation.prepared by L. Hogeboom, D. K. Breseke
Apollo 14 Passive Seismic Experiment long period oscillation
The anomalous condition, that of intermittent oscillations, of the Long Period Vertical seismometer of the Apollo 14 Passive Seismic Experiment (PSE) and the analysis and testing which was performed in the investigation of the anomaly is described in this report.prepared by M. Goodkin, prepared by L. Hogeboom, prepared by D. K. Breseke