446 research outputs found

    Primary care availability affects antibiotic consumption

    Get PDF

    Abstract composition rule for relativistic kinetic energy in the thermodynamical limit

    Full text link
    We demonstrate by simple mathematical considerations that a power-law tailed distribution in the kinetic energy of relativistic particles can be a limiting distribution seen in relativistic heavy ion experiments. We prove that the infinite repetition of an arbitrary composition rule on an infinitesimal amount leads to a rule with a formal logarithm. As a consequence the stationary distribution of energy in the thermodynamical limit follows the composed function of the Boltzmann-Gibbs exponential with this formal logarithm. In particular, interactions described as solely functions of the relative four-momentum squared lead to kinetic energy distributions of the Tsallis-Pareto (cut power-law) form in the high energy limit.Comment: Submitted to Europhysics Letters. LaTeX, 3 eps figure

    The contact binary VW Cephei revisited: surface activity and period variation

    Full text link
    Context. Despite the fact that VW Cephei is one of the well-studied contact binaries in the literature, there is no fully consistent model available that can explain every observed property of this system. Aims. Our motivation is to obtain new spectra along with photometric measurements, to analyze what kind of changes may have happened in the system in the past two decades, and to propose new ideas for explaining them. Methods. For the period analysis we determined 10 new times of minima from our light curves, and constructed a new O-C diagram of the system. Radial velocities of the components were determined using the cross-correlation technique. The light curves and radial velocities were modelled simultaneously with the PHOEBE code. All observed spectra were compared to synthetic spectra and equivalent widths of the Hα\alpha line were measured on their differences. Results. We have re-determined the physical parameters of the system according to our new light curve and spectral models. We confirm that the primary component is more active than the secondary, and there is a correlation between spottedness and the chromospheric activity. We propose that flip-flop phenomenon occurring on the primary component could be a possible explanation of the observed nature of the activity. To explain the period variation of VW Cep, we test two previously suggested scenarios: presence of a fourth body in the system, and the Applegate-mechanism caused by periodic magnetic activity. We conclude that although none of these mechanisms can be ruled out entirely, the available data suggest that mass transfer with a slowly decreasing rate gives the most likely explanation for the period variation of VW Cep.Comment: 13 pages, 18 figures, 9 tables, accepted for publication in Astronomy and Astrophysic

    Lifetime-Management and Operational Lifetime Extension at Paks Nuclear Power Plant

    Get PDF
    The design life of the NPP PAKS WWER-440/213 units is 30 years. Formally the design life limits the operational licence. The condition of the equipment after almost 20 years of operation is excellent. The lifetime management activity of the Paks NPP provides a proper basis for the continuation of safe operation. The current Hungarian Nuclear Regulations allow the extension of the operation licence of the NPP Units beyond the design life. To prove the acceptability of continuation of operation the Licensee have to prepare a Licence Renewal Application not later than 5 years before the expiration of the design lifetime. The Licence Renewal process based mainly on USNRC approach taking into account the special features of the WWER-440/213 Units. Summary of the preconditions of the Licence Renewal and the activity for the preparation of the operational lifetime extension are reported in the paper

    Key Elements of the Ageing Management of the WWER-440/213 type Nuclear Power Plants

    Get PDF
    The owner’s intention of WWER-440/213 units in Central Europe is to keep the plants in operation as long as technically feasible and reasonable from business point of view. The preconditions of the long term operation and license renewal are the safety and good plant condition. The past and recent ageing management practices have to ensure the required condition and performance of the essential structures, systems and components. In the paper an overall picture of the long term operation of WWER-440/213 units is given. The review covers ageing of mechanical equipment, building structures and electrical equipment to. Key elements of the ageing management are identified and described. Basic issues of assessment of ageing of essential structures, systems and components, also the issues related to availability of design basis information and lacking environmental qualification are discussed. Reference examples typical for WWER-440/213 plants long term operation are given from Paks Nuclear Power Plant practice
    corecore