2 research outputs found

    Direct block scheduling under marketing uncertainties

    Get PDF
    <div><p>Abstract Mineral projects are composed of geological, operational and market uncertainties, and reducing these uncertainties is one of the objectives of engineering. Most surveys assess the impact of geological and operational uncertainties on the mining planning. The objective of this work is to study the impact of market uncertainty on the mineral activity. The influence of iron ore price simulation on mining sequencing will be evaluated. The price of iron ore has random behavior that is best represented by the Geometric Brownian Movement system. This study analyzed the historical series of iron ore in order to determine the percentage volatility and drift. Traditionally, a constant and deterministic price is used for the ore mined in all periods of a mineral project. The direct block scheduling methodology was adopted because it is able to apply the appropriate financial discount factor to the simulated probabilistic price. The proposed methodology was able to quantify the market uncertainty.</p></div

    Direct block scheduling technology: Analysis of Avidity

    Get PDF
    <div><p>Abstract This study is focused on Direct Block Scheduling testing (Direct Multi-Period Scheduling methodology) which schedules mine production considering the correct discount factor of each mining block, resulting in the final pit. Each block is analyzed individually in order to define the best target period. This methodology presents an improvement of the classical methodology derived from Lerchs-Grossmann's initial proposition improved by Whittle. This paper presents the differences between these methodologies, specially focused on the algorithms' avidity. Avidity is classically defined by the voracious search algorithms, whereupon some of the most famous greedy algorithms are Branch and Bound, Brutal Force and Randomized. Strategies based on heuristics can accentuate the voracity of the optimizer system. The applied algorithm use simulated annealing combined with Tabu Search. The most avid algorithm can select the most profitable blocks in early periods, leading to higher present value in the first periods of mine operation. The application of discount factors to blocks on the Lerchs-Grossmann's final pit has an accentuated effect with time, and this effect may make blocks scheduled for the end of the mine life unfeasible, representing a trend to a decrease in reported reserves.</p></div
    corecore