    Solution of the emergency control of synchronous generator modes based on the local measurements to ensure the dynamic stability

    Get PDF
    Stochastic renewable sources of energy have been causing changes in the structure and operation of power systems. High penetration of this type of generation results in decreased inertia of a power system, increased active power fluctuations, and a higher probability of false tripping of emergency control devices. Traditional algorithms of emergency control are not adaptable and flexible enough for systems with high penetration of renewables and flexible alternating current transmission systems. Integration and development of phasor measurement units make it possible to create adaptable emergency control systems, which would require minimal pre-defined data. The purpose of this study is to develop an adaptable algorithm for turbine fast valving control synthesis and transient stability estimation for a generator. The suggested algorithm is based on the equal area criterion in the domain synchronous generator “torque–load angle”. The measurements of the generator operation under consideration are used as the input data for the steam turbine fast valving control synthesis. Thus, the algorithm becomes adaptable because no pre-defined parameters of a power system model are required. The suggested algorithm was tested on the power system model NE39bus using Matlab/Simulink. The efficiency of the suggested algorithm is verified and demonstrated. © 2022 The Authors. IET Generation, Transmission & Distribution published by John Wiley & Sons Ltd on behalf of The Institution of Engineering and Technology

    Recloser-based decentralized control of the grid with distributed generation in the Lahsh district of the Rasht grid in Tajikistan, central Asia

    Get PDF
    Small-scale power generation based on renewable energy sources is gaining popularity in distribution grids, creating new challenges for power system control. At the same time, remote consumers with their own small-scale generation still have low reliability of power supply and poor power quality, due to the lack of proper technology for grid control when the main power supply is lost. Today, there is a global trend in the transition from a power supply with centralized control to a decentralized one, which has led to the Microgrid concept. A microgrid is an intelligent automated system that can reconfigure by itself, maintain the power balance, and distribute power flows. The main purpose of this paper is to study the method of control using reclosers in the Lahsh district of the Rasht grid in Tajikistan with distributed small generation. Based on modified reclosers, a method of decentralized synchronization and restoration of the grid normal operation after the loss of the main power source was proposed. In order to assess the stable operation of small hydropower plants under disturbances, the transients caused by proactive automatic islanding (PAI) and restoration of the interconnection between the microgrid and the main grid are shown. Rustab software, as one of the multifunctional software applications in the field of power systems transients study, was used for simulation purposes. Based on the simulation results, it can be concluded that under disturbances, the proposed method had a positive effect on the stability of small hydropower plants, which are owned and dispatched by the Rasht grid. Moreover, the proposed method sufficiently ensures the quality of the supplied power and improves the reliability of power supply in the Lahsh district of Tajikistan. © 2020 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (http://creativecommons.org/licenses/by/4.0/).Chinese Academy of Sciences, CAS: XDA20060303National Natural Science Foundation of China, NSFC: 41761144079Y848041Ministry of National Infrastructure, Energy and Water ResourcesFunding: This research was funded by the Strategic Priority Research Program of the Chinese Academy of Sciences, Pan-Third Pole Environment Study for a Green Silk Road (Grant No. XDA20060303), the International Cooperation Project of the National Natural Science Foundation of China (Grant No. 41761144079), the Xinjiang Tianchi Hundred Talents Program (Grant No. Y848041), and the project of the Research Center of Ecology and Environment in Central Asia (Grant No. Y934031).Acknowledgments: The authors are thankful to the Ministry of Energy and Water Resources of the Republic of Tajikistan and the Rasht electric networks OJSHC “Barqi Tojik” for providing the data for this research work

    Expert system application for reactive power compensation in isolated electric power systems

    Get PDF
    Effective electricity use can be an option which enables to achieve significant economy while generating and transmitting of electricity. One of the most important things is to improve the electricity quality through reactive power correction up to optimum values. The current article presents the solution to compensate the reactive power in the distribution networks, in GornoBadakhshan Autonomous Oblast (GBAO) with the use of the advanced technologies based on the data collection within real time. The article describes the methodology of fuzzy logic application and bio-heuristic algorithms for the suggested solution effectiveness to be determined. Fuzzy logic application to specify the node priority for compensating devices based on the linguistic matrix power loss and voltage gives the possibility to the expert to take appropriate solutions for compensating devices installation location to be determined. The appropriate (correct) determination of the compensating devices installation location in the electric power system ensures the effective regulation of the reactive power with the least economic costs. Optimization problems related to the active power loss minimization are solved as well as the cost minimization with compensating devices to ensure the values tan(φ) not exceeding 0.35 through reducing multi-objective problem to the single-objective one using linear convolution

    Vibration problem solution of high-capacity hydropower units

    Full text link
    This paper proposes hydro generator vibration observations under various conditions and solution of a problem of high vibration in upper guide bearing of 110MW hydro generator. Among the test, which were carried out to identify vibration origin of hydro generating unit were: Voltage drop tests, magnetic flux measurements, interferric gap measurements, turbine pressure pulsation measurements, etc. It was shown, that among other possible reasons, correct balancing, including pivot bearing adjustment was the most efficient measure to eliminate vibration in start-up modes of hydro power unit. According to the results of conducted step-by-step defect analysis, the corresponding recommendations were provided for service and maintenance regarding the generation unit No2 of Sangtuda-2 Hydro Power Plant, Tajikistan. © Published under licence by IOP Publishing Ltd

    Diagnostics of the technical condition of electric network equipment based on fuzzy expert estimates

    Full text link
    The paper describes a new possible method of diagnostics of the current technical condition of equipment using a mathematical model based on fuzzy expert estimates and the theory of fuzzy sets. The specifics of the task is determined mainly by the type of the obtained estimates, namely: causal relationships between the controlled parameters of the transformer equipment and defects that could entail their change and the possibility of further operation of the facility. At the same time, attention is paid to the problem of the degree of consistency of expert opinions that affects the quality of the assessment of the current technical condition of the studied object. The paper provides a comparative analysis of the arithmetic mean estimates and median estimates of the consistency of expert opinions. It is shown that the significant drawback of the arithmetic mean approach is its instability towards outliers of individual opinions moving the resulting value under the influence of the “dissident expert opinions”. On the other hand, the median estimate is free of such shortage; it is more outlier-resistant and simply discards a part of radically outlying expert opinions. For the first time, the Kemeny median has been used for technical diagnostics. Kemeny median is based on the introduction of a metric to the set of expert opinions, and axiomatic introduction of the distance between them. Also, the paper formulates a criterion on how to determine the optimal number of experts in the group. © 202

    Method for designing drop-of-wire recognition systems on sections of undistorted two-wire power transmission lines

    Full text link
    In this work a general statement of the problem of designing distributive electrical systems that recognize breakage of wires on sections of power lines using a multifunctional wire with an isolated residential wire is formulated. The use of overhead wires with the proposed construction of the housing will make it possible to solve many electrical problems very easily and cheaply without the use of expensive equipment. The correspondence table of the information current values of the power supply unit I 0 and of the wire breakdowns on the sections in the two-wire transmission line is obtained by simulation. The proposed method of diagnostics and monitoring of the state of power lines is not expensive and allows the maintenance staff, being at the substation, to detect rapidly and remotely the breakage of wires on the parts of the network and the distance to it, In order to ensure that the repair crew is sent to the exact location of the damage, this will improve the reliability of the electrical supply to consumers. This is achieved by the fact that the information wire has an independent power supply and thus allows for control of the network at any time. © Published under licence by IOP Publishing Ltd