63,457 research outputs found

    Application of expert systems in project management decision aiding

    Get PDF
    The feasibility of developing an expert systems-based project management decision aid to enhance the performance of NASA project managers was assessed. The research effort included extensive literature reviews in the areas of project management, project management decision aiding, expert systems technology, and human-computer interface engineering. Literature reviews were augmented by focused interviews with NASA managers. Time estimation for project scheduling was identified as the target activity for decision augmentation, and a design was developed for an Integrated NASA System for Intelligent Time Estimation (INSITE). The proposed INSITE design was judged feasible with a low level of risk. A partial proof-of-concept experiment was performed and was successful. Specific conclusions drawn from the research and analyses are included. The INSITE concept is potentially applicable in any management sphere, commercial or government, where time estimation is required for project scheduling. As project scheduling is a nearly universal management activity, the range of possibilities is considerable. The INSITE concept also holds potential for enhancing other management tasks, especially in areas such as cost estimation, where estimation-by-analogy is already a proven method

    Investigating effort prediction of web-based applications using CBR on the ISBSG dataset

    Get PDF
    As web-based applications become more popular and more sophisticated, so does the requirement for early accurate estimates of the effort required to build such systems. Case-based reasoning (CBR) has been shown to be a reasonably effective estimation strategy, although it has not been widely explored in the context of web applications. This paper reports on a study carried out on a subset of the ISBSG dataset to examine the optimal number of analogies that should be used in making a prediction. The results show that it is not possible to select such a value with confidence, and that, in common with other findings in different domains, the effectiveness of CBR is hampered by other factors including the characteristics of the underlying dataset (such as the spread of data and presence of outliers) and the calculation employed to evaluate the distance function (in particular, the treatment of numeric and categorical data)
    corecore