Investigation into an improved modular rule-based testing framework for business rules
Rule testing in scheduling applications is a complex and potentially costly business problem. This thesis reports the outcome of research undertaken to develop a system to describe and test scheduling rules against a set of scheduling data. The overall intention of the research was to reduce commercial scheduling costs by minimizing human domain expert interaction within the scheduling process.
This thesis reports the outcome of research initiated following a consultancy project to develop a system to test driver schedules against the legal driving rules in force in the UK and the EU. One of the greatest challenges faced was interpreting the driving rules and translating them into the chosen programming language. This part of the project took considerable effort to complete the programming, testing and debugging processes. A potential problem then arises if the Department of Transport or the European Union alter or change the driving rules. Considerable software development is likely to be required to support the new rule set.
The approach considered takes into account the need for a modular software component that can be used in not just transport scheduling systems which look at legal driving rules but may also be integrated into other systems that have the need to test temporal rules. The integration of the rule testing component into existing systems is key to making the proposed solution reusable.
The research outcome proposes an alternative approach to rule definition, similar to that of RuleML, but with the addition of rule metadata to provide the ability of describing rules of a temporal nature. The rules can be serialised and deserialised between XML (eXtensible Markup Language) and objects within an object oriented environment (in this case .NET with C#), to provide a means of transmission of the rules over a communication infrastructure. The rule objects can then be compiled into an executable software library, allowing the rules to be tested more rapidly than traditional interpreted rules. Additional support functionality is also defined to provide a means of effectively integrating the rule testing engine into existing applications.
Following the construction of a rule testing engine that has been designed to meet the given requirements, a series of tests were undertaken to determine the effectiveness of the proposed approach. This lead to the implementation of improvements in the caching of constructed work plans to further improve performance. Tests were also carried out into the application of the proposed solution within alternative scheduling domains and to analyse the difference in computational performance and memory usage across system architectures, software frameworks and operating systems, with the support of Mono.
Future work that is expected to follow on from this thesis will likely reside in investigations into the development of graphical design tools for the creation of the rules, improvements in the work plan construction algorithm, parallelisation of elements of the process to take better advantage of multi-core processors and off-loading of the rule testing process onto dedicated or generic computational processors
Power-aware system-on-chip test scheduling using enhanced rectangle packing algorithm
The current semiconductor technology allows integration of all components onto a single chip called system-on-chip (SoC), which scales down the size of product and improves the performance. When a system becomes more complicated, testing process, such as test scheduling, becomes more challenging. Recently, peak power has also been considered as constraints in the test scheduling problem. Besides these constraints, some add-on techniques including pre-emption and non-consecutive test bus assignment have been introduced. The main contribution of each technique is the reduction of idling time in the test scheduling and thus reducing the total test time. This paper proposes a power-aware test scheduling called enhanced rectangle packing (ERP). In this technique, we formulate the test scheduling problem as the rectangle packing with horizontally and vertically split-able items (rectangles) which are smaller to fill up more compactly the test scheduling floor plan. Experimental results conducted on ITC'02 SoC benchmark circuits revealed positive improvement of the power-aware ERP algorithm in reducing total SoC test time
Thermal-Safe Test Scheduling for Core-Based System-on-a-Chip Integrated Circuits
Overheating has been acknowledged as a major problem during the testing of complex system-on-chip (SOC) integrated circuits. Several power-constrained test scheduling solutions have been recently proposed to tackle this problem during system integration. However, we show that these approaches cannot guarantee hot-spot-free test schedules because they do not take into account the non-uniform distribution of heat dissipation across the die and the physical adjacency of simultaneously active cores. This paper proposes a new test scheduling approach that is able to produce short test schedules and guarantee thermal-safety at the same time. Two thermal-safe test scheduling algorithms are proposed. The first algorithm computes an exact (shortest) test schedule that is guaranteed to satisfy a given maximum temperature constraint. The second algorithm is a heuristic intended for complex systems with a large number of embedded cores, for which the exact thermal-safe test scheduling algorithm may not be feasible. Based on a low-complexity test session thermal cost model, this algorithm produces near-optimal length test schedules with significantly less computational effort compared to the optimal algorithm
A linear programming-based method for job shop scheduling
We present a decomposition heuristic for a large class of job shop scheduling problems. This heuristic utilizes information from the linear programming formulation of the associated optimal timing problem to solve subproblems, can be used for any objective function whose associated optimal timing problem can be expressed as a linear program (LP), and is particularly effective for objectives that include a component that is a function of individual operation
completion times. Using the proposed heuristic framework, we address job shop scheduling problems with a variety of objectives where intermediate holding costs need to be explicitly considered. In computational testing, we demonstrate the performance of our proposed solution approach
Scheduling with a Limited Testing Budget
Scheduling with testing falls under the umbrella of the research on
optimization with explorable uncertainty. In this model, each job has an upper
limit on its processing time that can be decreased to a lower limit (possibly
unknown) by some preliminary action (testing). Recently, D{\"{u}}rr et al.
\cite{DBLP:journals/algorithmica/DurrEMM20} has studied a setting where testing
a job takes a unit time, and the goal is to minimize total completion time or
makespan on a single machine. In this paper, we extend their problem to the
budget setting in which each test consumes a job-specific cost, and we require
that the total testing cost cannot exceed a given budget. We consider the
offline variant (the lower processing time is known) and the oblivious variant
(the lower processing time is unknown) and aim to minimize the total completion
time or makespan on a single machine.
For the total completion time objective, we show NP-hardness and derive a
PTAS for the offline variant based on a novel LP rounding scheme. We give a
-competitive algorithm for the oblivious variant based on a
framework inspired by the worst-case lower-bound instance. For the makespan
objective, we give an FPTAS for the offline variant and a
-competitive algorithm for the oblivious variant. Our algorithms
for the oblivious variants under both objectives run in time
. Lastly, we show that our results are essentially optimal
by providing matching lower bounds.Comment: To appear in ESA 202
- …