    Seismic Risk Analysis of Revenue Losses, Gross Regional Product and transportation systems.

    Get PDF
    Natural threats like earthquakes, hurricanes or tsunamis have shown seri- ous impacts on communities. In the past, major earthquakes in the United States like Loma Prieta 1989, Northridge 1994, or recent events in Italy like L’Aquila 2009 or Emilia 2012 earthquake emphasized the importance of pre- paredness and awareness to reduce social impacts. Earthquakes impacted businesses and dramatically reduced the gross regional product. Seismic Hazard is traditionally assessed using Probabilistic Seismic Hazard Anal- ysis (PSHA). PSHA well represents the hazard at a specific location, but it’s unsatisfactory for spatially distributed systems. Scenario earthquakes overcome the problem representing the actual distribution of shaking over a spatially distributed system. The performance of distributed productive systems during the recovery process needs to be explored. Scenario earthquakes have been used to assess the risk in bridge networks and the social losses in terms of gross regional product reduction. The proposed method for scenario earthquakes has been applied to a real case study: Treviso, a city in the North East of Italy. The proposed method for scenario earthquakes requires three models: one representation of the sources (Italian Seismogenic Zonation 9), one attenuation relationship (Sa- betta and Pugliese 1996) and a model of the occurrence rate of magnitudes (Gutenberg Richter). A methodology has been proposed to reduce thou- sands of scenarios to a subset consistent with the hazard at each location. Earthquake scenarios, along with Mote Carlo method, have been used to simulate business damage. The response of business facilities to earthquake has been obtained from fragility curves for precast industrial building. Fur- thermore, from business damage the reduction of productivity has been simulated using economic data from the National statistical service and a proposed piecewise “loss of functionality model”. To simulate the economic process in the time domain, an innovative businesses recovery function has been proposed. The proposed method has been applied to generate scenarios earthquakes at the location of bridges and business areas. The proposed selection method- ology has been applied to reduce 8000 scenarios to a subset of 60. Subse- quently, these scenario earthquakes have been used to calculate three system performance parameters: the risk in transportation networks, the risk in terms of business damage and the losses of gross regional product. A novel model for business recovery process has been tested. The proposed model has been used to represent the business recovery process and simulate the effects of government aids allocated for reconstruction. The proposed method has efficiently modeled the seismic hazard using scenario earthquakes. The scenario earthquakes presented have been used to assess possible consequences of earthquakes in seismic prone zones and to increase the preparedness. Scenario earthquakes have been used to sim- ulate the effects to economy of the impacted area; a significant Gross Regional Product reduction has been shown, up to 77% with an earthquake with 0.0003 probability of occurrence. The results showed that limited funds available after the disaster can be distributed in a more efficient way

    Resilient decision making in steam network investments

    Get PDF
    Steam is a key energy vector for industrial sites, used for process heating, direct injection and stripping, tracing and cogeneration of mechanical power. Steam networks transport steam from producers to consumers and across different pressure levels. The steam production equipments (boilers, cogeneration units and heat exchangers) should be dimensioned to always supply key consumers as well as to deal with extreme demand caused by exceptional events such as unit startups or extreme weather. An important issue to be dealt with is that of unexpected boiler shutdowns, which can take significant amounts of time to bring back online. In cases where demand surpasses the available production of steam, load shedding is necessary in order to keep the network operable. A penalty cost can be associated to load shedding. A well dimensioned steam network is one which is resilient to such events, being able to overcome extreme demand and unexpected boiler shutdowns at minimum cost. This paper proposes a methodology for evaluating the operability of a steam network when facing unexpected boiler shutdowns. A Monte-Carlo simulation is carried out on a multi-period steam network problem, randomly shutting down boilers according to their failure properties (probability of failure and duration of failure). The aim of this method is to evaluate how resilient a steam network is to boiler shutdowns. The Monte-Carlo simulation is applied to a steam network model built using a Mixed Integer Linear Programming (MILP) formulation, whose objective function is to minimise the operational costs of the steam network and therefore also to minimise the penalty costs associated to load shedding. A case study based on anonymised industrial data is used to demonstrate the method. Two investment propositions are evaluated and compared using the proposed method

    The safety case and the lessons learned for the reliability and maintainability case

    Get PDF
    This paper examine the safety case and the lessons learned for the reliability and maintainability case

    Stochastic Methods in Risk Analysis

    Get PDF
    In this paper, we review basic stochastic methods which can be used to extend state-of-the-art deterministic analytical methods for risk analysis. We can conclude that the standard deterministic analytical methods highly depend on the practical experience and knowledge of the evaluator and therefore, the stochastic methods should be introduced. The new risk analysis methods should consider the uncertainties in input values. We present how large is the impact on the results of the analysis solving practical example of FMECA with uncertainties modelled using Monte Carlo sampling

    Reducing Voltage Volatility with Step Voltage Regulators: A Life-Cycle Cost Analysis of Korean Solar Photovoltaic Distributed Generation

    Get PDF
    To meet the United Nation’s sustainable development energy goal, the Korean Ministry of Commerce announced they would increase renewable energy generation to 5.3% by 2029. These energy sources are often produced in small-scale power plants located close to the end users, known as distributed generation (DG). The use of DG is an excellent way to reduce greenhouse gases but has also been found to reduce power quality and safety reliability through an increase in voltage volatility. This paper performs a life-cycle cost analysis on the use of step voltage regulators (SVR) to reduce said volatility, simulating the impact they have on existing Korean solar photovoltaic (PV) DG. From the data collected on a Korean Electrical Power Corporation 30 km/8.2 megawatts (MW) feeder system, SVRs were found to increase earnings by one million USD. SVR volatile voltage mitigation increased expected earnings by increasing the estimated allowable PV power generation by 2.7 MW. While this study is based on Korean PV power generation, its findings are applicable to any DG sources worldwide.11Nsciescopu

    Power quality and electromagnetic compatibility: special report, session 2

    Get PDF
    The scope of Session 2 (S2) has been defined as follows by the Session Advisory Group and the Technical Committee: Power Quality (PQ), with the more general concept of electromagnetic compatibility (EMC) and with some related safety problems in electricity distribution systems. Special focus is put on voltage continuity (supply reliability, problem of outages) and voltage quality (voltage level, flicker, unbalance, harmonics). This session will also look at electromagnetic compatibility (mains frequency to 150 kHz), electromagnetic interferences and electric and magnetic fields issues. Also addressed in this session are electrical safety and immunity concerns (lightning issues, step, touch and transferred voltages). The aim of this special report is to present a synthesis of the present concerns in PQ&EMC, based on all selected papers of session 2 and related papers from other sessions, (152 papers in total). The report is divided in the following 4 blocks: Block 1: Electric and Magnetic Fields, EMC, Earthing systems Block 2: Harmonics Block 3: Voltage Variation Block 4: Power Quality Monitoring Two Round Tables will be organised: - Power quality and EMC in the Future Grid (CIGRE/CIRED WG C4.24, RT 13) - Reliability Benchmarking - why we should do it? What should be done in future? (RT 15

    Multiobjective strategies for New Product Development in the pharmaceutical industry

    Get PDF
    New Product Development (NPD) constitutes a challenging problem in the pharmaceutical industry, due to the characteristics of the development pipeline. Formally, the NPD problem can be stated as follows: select a set of R&D projects from a pool of candidate projects in order to satisfy several criteria (economic profitability, time to market) while coping with the uncertain nature of the projects. More precisely, the recurrent key issues are to determine the projects to develop once target molecules have been identified, their order and the level of resources to assign. In this context, the proposed approach combines discrete event stochastic simulation (Monte Carlo approach) with multiobjective genetic algorithms (NSGAII type, Non-Sorted Genetic Algorithm II) to optimize the highly combinatorial portfolio management problem. In that context, Genetic Algorithms (GAs) are particularly attractive for treating this kind of problem, due to their ability to directly lead to the so-called Pareto front and to account for the combinatorial aspect. This work is illustrated with a study case involving nine interdependent new product candidates targeting three diseases. An analysis is performed for this test bench on the different pairs of criteria both for the bi- and tricriteria optimization: large portfolios cause resource queues and delays time to launch and are eliminated by the bi- and tricriteria optimization strategy. The optimization strategy is thus interesting to detect the sequence candidates. Time is an important criterion to consider simultaneously with NPV and risk criteria. The order in which drugs are released in the pipeline is of great importance as with scheduling problems