    Chance-Constrained Model for RCPSP with Uncertain Durations

    Get PDF

    The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review

    Get PDF
    Purpose: The goal of this article is to provide an extensive literature review of the models and solution procedures proposed by many researchers interested on the Project Scheduling Problem with nondeterministic activities duration. Design/methodology/approach: This paper presents an exhaustive literature review, identifying the existing models where the activities duration were taken as uncertain or random parameters. In order to get published articles since 1996, was employed the Scopus database. The articles were selected on the basis of reviews of abstracts, methodologies, and conclusions. The results were classified according to following characteristics: year of publication, mathematical representation of the activities duration, solution techniques applied, and type of problem solved. Findings: Genetic Algorithms (GA) was pointed out as the main solution technique employed by researchers, and the Resource-Constrained Project Scheduling Problem (RCPSP) as the most studied type of problem. On the other hand, the application of new solution techniques, and the possibility of incorporating traditional methods into new PSP variants was presented as research trends. Originality/value: This literature review contents not only a descriptive analysis of the published articles but also a statistical information section in order to examine the state of the research activity carried out in relation to the Project Scheduling Problem with non-deterministic activities duration.Peer Reviewe

    Equilibrium Analysis of Channel Structure Strategies in Uncertain Environment

    Get PDF
    Abstract In this paper, we consider a pricing decision problem with two competing supply chains which distribute differentiated but competing products in the same market. Each chain can be vertically integrated or decentralized based on the choice of the manufacturer. The manufacturing costs, sales costs and consumer demands are characterized as uncertain variables, whose distributions are estimated by experienced experts. Meanwhile, uncertainty theory and game theory are employed to formulate the pricing decision problems. The equilibrium behaviors (how the supply chain members make their own pricing decisions on wholesale prices and retailer markups) at operational level under three possible scenarios are derived. Numerical experiments are also given to explore the impacts of the parameters’ uncertain degrees on supply chain members’ pricing decisions. The results demonstrate that the supply chain uncertain factors have great influences on equilibrium prices. In addition, we also evaluate the effects of competing intensity (substitutability) of the two products on the strategy behaviors, vertically integrated channel strategy versus decentralized strategy, of the manufacturers. It is found that the manufacturers are better off to distribute their products through a decentralized channel rather than an integrated one when the substitutability is greater than some value. Besides, the uncertain factors in the supply chain might reduce the value contrast to the one in deterministic case. Some other interesting managerial highlights are also provided in this paper

    EXPERIENCE-ORIENTED MODEL OF BUDGET ALLOCATION AND COST CONTROL FOR ENGINEERING CONSULTING PROJECTS

    Get PDF
    This paper presents an experience-oriented model of budget allocation and cost control for engineering consulting projects. The proposed model comprised two modules: a work item module and a work duration module. Regarding the work item module, a project manager employed the analytic hierarchy process (AHP) to determine the budget percentage allocated to each work item. Regarding the work duration module, this study compiled all S-curves appearing in each budget percentage range in past projects. A project manager then selected the optimal curve shape for each work item to determine the daily budget allocation and cost control limits throughout the work duration of each work item. Testing revealed that the proposed model facilitates project managers’ budget allocation decision-making, determines budget control limits for the overall project and for each work item and identifies work items that may be out of control at an early stage