24,790 research outputs found
Framework for sustainable TVET-Teacher Education Program in Malaysia Public Universities
Studies had stated that less attention was given to the education aspect, such as
teaching and learning in planning for improving the TVET system. Due to the 21st
Century context, the current paradigm of teaching for the TVET educators also has
been reported to be fatal and need to be shifted. All these disadvantages reported
hindering the country from achieving the 5th strategy in the Strategic Plan for
Vocational Education Transformation to transform TVET system as a whole.
Therefore, this study aims to develop a framework for sustainable TVET Teacher
Education program in Malaysia. This study had adopted an Exploratory Sequential
Mix-Method design, which involves a semi-structured interview (phase one) and
survey method (phase two). Nine experts had involved in phase one chosen by using
Purposive Sampling Technique. As in phase two, 118 TVET-TE program lecturers
were selected as the survey sample chosen through random sampling method. After
data analysis in phase one (thematic analysis) and phase two (Principal Component
Analysis), eight domains and 22 elements have been identified for the framework for
sustainable TVET-TE program in Malaysia. This framework was identified to embed
the elements of 21st Century Education, thus filling the gap in this research. The
research findings also indicate that the developed framework was unidimensional and
valid for the development and research regarding TVET-TE program in Malaysia.
Lastly, it is in the hope that this research can be a guide for the nations in producing a
quality TVET teacher in the future
A greedy heuristic approach for the project scheduling with labour allocation problem
Responding to the growing need of generating a robust project scheduling, in this article we present a greedy algorithm to generate the project baseline schedule. The robustness achieved by integrating two dimensions of the human resources flexibilities. The first is the operatorsâ polyvalence, i.e. each operator has one or more secondary skill(s) beside his principal one, his mastering level being characterized by a factor we call âefficiencyâ. The second refers to the working time modulation, i.e. the workers have a flexible time-table that may vary on a daily or weekly basis respecting annualized working strategy. Moreover, the activity processing time is a non-increasing function of the number of workforce allocated to create it, also of their heterogynous working efficiencies. This modelling approach has led to a nonlinear optimization model with mixed variables. We present: the problem under study, the greedy algorithm used to solve it, and then results in comparison with those of the genetic algorithms
Formal and Informal Methods for Multi-Core Design Space Exploration
We propose a tool-supported methodology for design-space exploration for
embedded systems. It provides means to define high-level models of applications
and multi-processor architectures and evaluate the performance of different
deployment (mapping, scheduling) strategies while taking uncertainty into
account. We argue that this extension of the scope of formal verification is
important for the viability of the domain.Comment: In Proceedings QAPL 2014, arXiv:1406.156
Flow shop scheduling with earliness, tardiness and intermediate inventory holding costs
We consider the problem of scheduling customer orders in a flow shop with the objective of minimizing the sum of tardiness, earliness (finished goods inventory holding) and intermediate (work-in-process) inventory holding costs. We formulate this problem as an integer program, and based on approximate solutions to two di erent, but closely related, Dantzig-Wolfe reformulations, we develop heuristics to minimize the total cost. We exploit the duality between Dantzig-Wolfe reformulation and Lagrangian relaxation to enhance our heuristics. This combined approach enables us to develop two di erent lower bounds on the optimal integer solution, together with intuitive approaches for obtaining near-optimal feasible integer solutions. To the best of our knowledge, this is the first paper that applies column generation to a scheduling problem with di erent types of strongly NP-hard pricing problems which are solved heuristically. The computational study demonstrates that our algorithms have a significant speed advantage over alternate methods, yield good lower bounds, and generate near-optimal feasible integer solutions for problem instances with many machines and a realistically large number of jobs
Working Notes from the 1992 AAAI Spring Symposium on Practical Approaches to Scheduling and Planning
The symposium presented issues involved in the development of scheduling systems that can deal with resource and time limitations. To qualify, a system must be implemented and tested to some degree on non-trivial problems (ideally, on real-world problems). However, a system need not be fully deployed to qualify. Systems that schedule actions in terms of metric time constraints typically represent and reason about an external numeric clock or calendar and can be contrasted with those systems that represent time purely symbolically. The following topics are discussed: integrating planning and scheduling; integrating symbolic goals and numerical utilities; managing uncertainty; incremental rescheduling; managing limited computation time; anytime scheduling and planning algorithms, systems; dependency analysis and schedule reuse; management of schedule and plan execution; and incorporation of discrete event techniques
Uncertainty management by relaxation of conflicting constraints in production process scheduling
Mathematical-analytical methods as used in Operations Research approaches are often insufficient for scheduling problems. This is due to three reasons: the combinatorial complexity of the search space, conflicting objectives for production optimization, and the uncertainty in the production process. Knowledge-based techniques, especially approximate reasoning and constraint relaxation, are promising ways to overcome these problems. A case study from an industrial CIM environment, namely high-grade steel production, is presented to demonstrate how knowledge-based scheduling with the desired capabilities could work. By using fuzzy set theory, the applied knowledge representation technique covers the uncertainty inherent in the problem domain. Based on this knowledge representation, a classification of jobs according to their importance is defined which is then used for the straightforward generation of a schedule. A control strategy which comprises organizational, spatial, temporal, and chemical constraints is introduced. The strategy supports the dynamic relaxation of conflicting constraints in order to improve tentative schedules
Intelligent systems in manufacturing: current developments and future prospects
Global competition and rapidly changing customer requirements are demanding increasing changes in manufacturing environments. Enterprises are required to constantly redesign their products and continuously reconfigure their manufacturing systems. Traditional approaches to manufacturing systems do not fully satisfy this new situation. Many authors have proposed that artificial intelligence will bring the flexibility and efficiency needed by manufacturing systems. This paper is a review of artificial intelligence techniques used in manufacturing systems. The paper first defines the components of a simplified intelligent manufacturing systems (IMS), the different Artificial Intelligence (AI) techniques to be considered and then shows how these AI techniques are used for the components of IMS
An efficient memetic, permutation-based evolutionary algorithm for real-world train timetabling
Train timetabling is a difficult and very tightly constrained combinatorial
problem that deals with the construction of train schedules. We focus on the
particular problem of local reconstruction of the schedule following a small
perturbation, seeking minimisation of the total accumulated delay by adapting
times of departure and arrival for each train and allocation of resources
(tracks, routing nodes, etc.). We describe a permutation-based evolutionary
algorithm that relies on a semi-greedy heuristic to gradually reconstruct the
schedule by inserting trains one after the other following the permutation.
This algorithm can be hybridised with ILOG commercial MIP programming tool
CPLEX in a coarse-grained manner: the evolutionary part is used to quickly
obtain a good but suboptimal solution and this intermediate solution is refined
using CPLEX. Experimental results are presented on a large real-world case
involving more than one million variables and 2 million constraints. Results
are surprisingly good as the evolutionary algorithm, alone or hybridised,
produces excellent solutions much faster than CPLEX alone
Dynamic scheduling in a multi-product manufacturing system
To remain competitive in global marketplace, manufacturing companies need to improve their operational practices. One of the methods to increase competitiveness in manufacturing is by implementing proper scheduling system. This is important to enable job orders to be completed on time, minimize waiting time and maximize utilization of equipment and machineries. The dynamics of real manufacturing system are very complex in nature. Schedules developed based on deterministic algorithms are unable to effectively deal with uncertainties in demand and capacity. Significant differences can be found between planned schedules and actual schedule implementation. This study attempted to develop a scheduling system that is able to react quickly and reliably for accommodating changes in product demand and manufacturing capacity. A case study, 6 by 6 job shop scheduling problem was adapted with uncertainty elements added to the data sets. A simulation model was designed and implemented using ARENA simulation package to generate various job shop scheduling scenarios. Their performances were evaluated using scheduling rules, namely, first-in-first-out (FIFO), earliest due date (EDD), and shortest processing time (SPT). An artificial neural network (ANN) model was developed and trained using various scheduling scenarios generated by ARENA simulation. The experimental results suggest that the ANN scheduling model can provided moderately reliable prediction results for limited scenarios when predicting the number completed jobs, maximum flowtime, average machine utilization, and average length of queue. This study has provided better understanding on the effects of changes in demand and capacity on the job shop schedules. Areas for further study includes: (i) Fine tune the proposed ANN scheduling model (ii) Consider more variety of job shop environment (iii) Incorporate an expert system for interpretation of results. The theoretical framework proposed in this study can be used as a basis for further investigation