3 research outputs found

    A method for obtaining the preventive maintenance interval in the absence of failure time data

    Get PDF
    One of the ways to reduce greenhouse gas emissions and other polluting gases caused by ships is to improve their maintenance operations through their life cycle. The maintenance manager usually does not modify the preventive intervals that the equipment manufacturer has designed to reduce the failure. Conditions of use and maintenance often change from design conditions. In these cases, continuing using the manufacturer's preventive intervals can lead to non-optimal management situations. This article proposes a new method to calculate the preventive interval when the hours of failure of the assets are unavailable. Two scenarios were created to test the effectiveness and usefulness of this new method, one without the failure hours and the other with the failure hours corresponding to a bypass valve installed in the engine of a maritime transport surveillance vessel. In an easy and fast way, the proposed method allows the maintenance manager to calculate the preventive interval of equipment that does not have installed an instrument for measuring operating hours installed

    A method for obtaining the preventive maintenance interval in the absence of failure time data

    Get PDF
    One of the ways to reduce greenhouse gas emissions and other polluting gases caused by ships is to improve their maintenance operations through their life cycle. The maintenance manager usually does not modify the preventive intervals that the equipment manufacturer has designed to reduce the failure. Conditions of use and maintenance often change from design conditions. In these cases, continuing using the manufacturer's preventive intervals can lead to non-optimal management situations. This article proposes a new method to calculate the preventive interval when the hours of failure of the assets are unavailable. Two scenarios were created to test the effectiveness and usefulness of this new method, one without the failure hours and the other with the failure hours corresponding to a bypass valve installed in the engine of a maritime transport surveillance vessel. In an easy and fast way, the proposed method allows the maintenance manager to calculate the preventive interval of equipment that does not have installed an instrument for measuring operating hours installed.This research was funded by the “Consejería de Transformación Económica, Industria, Conocimiento y Universidades de la Junta de Andalucía” and by the European Regional Development Fund (FEDER), within the framework of the FEDER of Andalusia 2014-2020 Project Reference UHU-202031, and by the grant Ref. RTI2018-094614-B-I00 (SMASHING Project) into the “Programa Estatal de I+D+i Orientada a los Retos de la Sociedad” funded by MCIN/AEI/ 10.13039/497 501100011033

    How Kano’s Performance Mediates Perceived SERVQUAL Impact on Kansei

    Get PDF
    Through Kansei Engineering (KE) methodology in services, the perceived service quality shows a direct impact on Kansei response. In order to strengthen the KE methodology, Kano model is embedded considering the attractive [A] and one-dimensional [O] performances. However, to what extent the Kano performance brings significant impact on Kansei is questionable and has not been explored yet. It is beneficial to measure the effort spent to improve a certain service attribute, considering the Kano performance and its impact on Kansei. This study on logistics services confirms that the Kano’s attractive category [A] shows the highest impact on Kansei (with loading of 0.502), followed by one-dimensional [O] and must-be [M] ones (with loadings of 0.514 and 0.507), respectively. The service provider should prioritize Kano’s [A] service attributes first for improvement. Keywords - Kano, logistics services, Kansei, SERVQUA
    corecore