17,083 research outputs found
Optimization and Job Scheduling in Heterogeneous Networks
The final publication is available at www.springerlink.comA heterogeneous network is a connected network of different platforms and operating systems. Job scheduling is a problem of selecting a free resource for unexecuted task from a pool of submitted tasks. Furthermore, it is required to find for every resource the best order of the tasks assigned to it. The purpose of this paper is to develop an efficient algorithm for job scheduling in heterogeneous networks. The algorithm should include parameters such as properties of resources and properties of jobs. The algorithm includes a cost function that is required to be optimized which includes parameters such as the total processing time, average waiting time. Our results demonstrate that the proposed algoritghm can be efficiently used to determine the performance of different job scheduling algorithms under different sets of loads.http://link.springer.com/chapter/10.1007%2F978-90-481-3662-9_4
A hyper-heuristic for adaptive scheduling in computational grids
In this paper we present the design and implementation of an hyper-heuristic for efficiently scheduling independent jobs in computational grids. An efficient scheduling of jobs to grid resources depends on many parameters, among others, the characteristics of the resources and jobs (such as computing capacity, consistency of computing, workload, etc.). Moreover, these characteristics change over time due to the dynamic nature of grid environment, therefore the planning of jobs to resources should be adaptively done. Existing ad hoc scheduling methods (batch and immediate mode) have shown their efficacy for certain types of resource and job characteristics. However, as stand alone methods, they are not able to produce the best planning of jobs to resources for different types of Grid resources and job characteristics. In this work we have designed and implemented a hyper-heuristic that uses a set of ad hoc (immediate and batch mode) scheduling methods to provide the scheduling of jobs to Grid resources according to the Grid and job characteristics. The hyper-heuristic is a high level algorithm, which examines the state and characteristics of the Grid system (jobs and resources), and selects and applies the ad hoc method that yields the best planning of jobs. The resulting hyper-heuristic based scheduler can be thus used to develop network-aware applications that need efficient planning of jobs to resources. The hyper-heuristic has been tested and evaluated in a dynamic setting through a prototype of a Grid simulator. The experimental evaluation showed the usefulness of the hyper-heuristic for planning of jobs to resources as compared to planning without knowledge of the resource and job characteristics.Peer ReviewedPostprint (author's final draft
Adaptive Dispatching of Tasks in the Cloud
The increasingly wide application of Cloud Computing enables the
consolidation of tens of thousands of applications in shared infrastructures.
Thus, meeting the quality of service requirements of so many diverse
applications in such shared resource environments has become a real challenge,
especially since the characteristics and workload of applications differ widely
and may change over time. This paper presents an experimental system that can
exploit a variety of online quality of service aware adaptive task allocation
schemes, and three such schemes are designed and compared. These are a
measurement driven algorithm that uses reinforcement learning, secondly a
"sensible" allocation algorithm that assigns jobs to sub-systems that are
observed to provide a lower response time, and then an algorithm that splits
the job arrival stream into sub-streams at rates computed from the hosts'
processing capabilities. All of these schemes are compared via measurements
among themselves and with a simple round-robin scheduler, on two experimental
test-beds with homogeneous and heterogeneous hosts having different processing
capacities.Comment: 10 pages, 9 figure
A simheuristic algorithm for solving an integrated resource allocation and scheduling problem
Modern companies have to face challenging configuration issues in their manufacturing chains. One of these challenges is related to the integrated allocation and scheduling of resources such as machines, workers, energy, etc. These integrated optimization problems are difficult to solve, but they can be even more challenging when real-life uncertainty is considered. In this paper, we study an integrated allocation and scheduling optimization problem with stochastic processing times. A simheuristic algorithm is proposed in order to effectively solve this integrated and stochastic problem. Our approach relies on the hybridization of simulation with a metaheuristic to deal with the stochastic version of the allocation-scheduling problem. A series of numerical experiments contribute to illustrate the efficiency of our methodology as well as their potential applications in real-life enterprise settings
- …