8 research outputs found

    Phasor measurement unit (PMU) placement optimisation in power transmission network based on hybrid approach

    Get PDF
    The Phasor Measurement Unit (PMU) is a device that is employed to detect the voltage and current waveform that is synchronised with a clocking signal obtained continuously from the global positioning system (GPS). Integrating with the GPS receiver, the base station is able to receive the synchronous data from each PMU in real time. This thesis presents novel optimal placement approaches of PMU for applications such as state estimation and fault detection. In this thesis, the PMU placement is realised based on two hybrid algorithms namely Approximation Algorithm and Global Optimization Algorithm. The proposed algorithms will ensure optimum PMU placement with full network observability under different contingency conditions. The IEEE 14, 24, 30, 57 and the New England 39 standard test systems will be used to exam the proposed algorithm adequately and the result will be compared to existing methods. In this thesis, we demonstrated that the proposed methods are very effective in determining the minimum number of PMU and the results are comparable to the best methods presented in the past literature. In addition, the comparison between the proposed methods to the existing methods show that the proposed hybrid approaches achieve higher System Observability Redundancy Index (SORI) which will in turn improve the reliability and stability of power transmission

    Improved fault-tolerant PMU placement using algebraic connectivity of graphs

    Get PDF
    Due to perpetual and innovative technological advancements, the need for reliable and stable power generation and transmission has been increasing dramatically over the years. Smart grids use advanced technologies to provide self-monitoring, self-checking and self-healing power networks, including smart metering devices capable of providing accurate measurements of the network’s power components. Among the most important metering devices in this context are “Phasor Measurement Units (PMUs)â€. PMUs are metering devices that provide synchronized measurements of voltage, current and phase angle differences using signals from the GPS satellites. However, due to the high cost of such advanced metering devices, studies were performed to determine the minimum number of PMUs required and their strategic placements in the power networks to provide full system observability. In this thesis, we consider fault-tolerant PMU placement aiming to minimize the number of PMUs while maintaining system observability under various contingencies. Conventionally, the optimal number of PMUs in a system is determined based on the system’s connectivity matrix under no contingency. This thesis considers fault- tolerant PMU placement under single and double branch failures. We propose algebraic connectivity, or Fiedler value, to identify the worst- case branch failures in terms of connectivity degradation. The proposed PMU placement accounts for this worst-case and covers a large percentage of other single and double branch failures. Furthermore, we propose the usage of Fiedler vector to provide a PMU placement that would ensure that the system remains fully observable during system partitioning into separate sub-systems. The resulting placements are compared with those obtained without considering connectivity degradation or system partitioning in terms of the percentages of observable systems during any single and double branch failures. The proposed PMU placements have increased percentages of fully observable systems in the event of any single or double branch failures compared to non—contingency based placement, with a reasonable increase in number of PMUs, and for some placement approaches no increase in PMUs is needed for providing a higher percentage of fully observable systems

    Improved fault-tolerant PMU placement using algebraic connectivity of graphs

    Get PDF
    Due to perpetual and innovative technological advancements, the need for reliable and stable power generation and transmission has been increasing dramatically over the years. Smart grids use advanced technologies to provide self-monitoring, self-checking and self-healing power networks, including smart metering devices capable of providing accurate measurements of the network\u27s power components. Among the most important metering devices in this context are Phasor Measurement Units (PMUs) . PMUs are metering devices that provide synchronized measurements of voltage, current and phase angle differences using signals from the GPS satellites. However, due to the high cost of such advanced metering devices, studies were performed to determine the minimum number of PMUs required and their strategic placements in the power networks to provide full system observability. In this thesis, we consider fault-tolerant PMU placement aiming to minimize the number of PMUs while maintaining system observability under various contingencies. Conventionally, the optimal number of PMUs in a system is determined based on the system\u27s connectivity matrix under no contingency. This thesis considers fault- tolerant PMU placement under single and double branch failures. We propose algebraic connectivity, or Fiedler value, to identify the worst- case branch failures in terms of connectivity degradation. The proposed PMU placement accounts for this worst-case and covers a large percentage of other single and double branch failures. Furthermore, we propose the usage of Fiedler vector to provide a PMU placement that would ensure that the system remains fully observable during system partitioning into separate sub-systems. The resulting placements are compared with those obtained without considering connectivity degradation or system partitioning in terms of the percentages of observable systems during any single and double branch failures. The proposed PMU placements have increased percentages of fully observable systems in the event of any single or double branch failures compared to non—contingency based placement, with a reasonable increase in number of PMUs, and for some placement approaches no increase in PMUs is needed for providing a higher percentage of fully observable systems

    Optimal placement of phasor measurement units using particle swarm optimization

    No full text
    10.1109/NABIC.2009.53936212009 World Congress on Nature and Biologically Inspired Computing, NABIC 2009 - Proceedings1708-171
    corecore