60 research outputs found
04231 Abstracts Collection -- Scheduling in Computer and Manufacturing Systems
During 31.05.-04.06.04, the Dagstuhl Seminar 04231 "Scheduling in Computer and Manufacturing Systems" was held in the International Conference and Research Center (IBFI), Schloss Dagstuhl. During the seminar, several participants presented their current research, and ongoing work and open problems were discussed. Abstracts of the presentations given during the seminar as well as abstracts of seminar results and ideas are put together in this paper. The first section describes the seminar topics and goals in general. Links to extended abstracts or full papers are provided, if available
Recommended from our members
A Novel Metaheuristic Hybrid Parthenogenetic Algorithm for Job Shop Scheduling Problems: Applying Optimization Model
This article has been accepted for publication in IEEE Access. This is the author's version which has not been fully edited and
content may change prior to final publication. Citation information: DOI 10.1109/ACCESS.2023.3278372© Copyright 2023 The Authors. Metaheuristics are primarily developed to explore optimization techniques in many practice areas. Metaheuristics refer to computational procedures leading to finding optimal solutions to optimization problems. Due to the increasing number of optimization problems with large-scale data, there is an ongoing demand for metaheuristic algorithms and the development of new algorithms with more efficiencies and improved convergence speed implemented by a mathematical model. One of the most popular optimization problems is job shop scheduling problems. This paper develops a novel metaheuristic hybrid Parthenogenetic Algorithm (NMHPGA) to optimize flexible job shop scheduling problems for single-machine and multi-machine job shops and a furnace model. This method is based on the principles of genetic algorithms, underlying the combinations of different types of selections, proposed ethnic GA, and hybrid parthenogenetic algorithm. In this paper, a parthenogenetic algorithm combined with ethnic selection GA is tested; the parthenogenetic algorithm version includes parthenogenetic operators: swap, reverse, and insert. The ethnic selection uses different selection operators such as stochastic, roulette, sexual, and aging; then, top individuals are selected from each procedure and combined to generate an ethnic population. The ethnic selection procedure is tested with the PGA types on a furnace model, single-machine job shops, and multi-machines with tardiness, earliness, and due date penalties. A comparison of obtained results of the established algorithm with other selection procedures indicated that the NMHPGA is achieving better objective functions with faster convergence speed.10.13039/501100007914-Brunel University Londo
A new hybrid meta-heuristic algorithm for solving single machine scheduling problems
A dissertation submitted in partial ful lment of the
degree of Master of Science in Engineering (Electrical) (50/50)
in the
Faculty of Engineering and the Built Environment
Department of Electrical and Information Engineering
May 2017Numerous applications in a wide variety of elds has resulted in a rich history of research
into optimisation for scheduling. Although it is a fundamental form of the problem, the
single machine scheduling problem with two or more objectives is known to be NP-hard.
For this reason we consider the single machine problem a good test bed for solution
algorithms. While there is a plethora of research into various aspects of scheduling
problems, little has been done in evaluating the performance of the Simulated Annealing
algorithm for the fundamental problem, or using it in combination with other techniques.
Speci cally, this has not been done for minimising total weighted earliness and tardiness,
which is the optimisation objective of this work.
If we consider a mere ten jobs for scheduling, this results in over 3.6 million possible
solution schedules. It is thus of de nite practical necessity to reduce the search space in
order to nd an optimal or acceptable suboptimal solution in a shorter time, especially
when scaling up the problem size. This is of particular importance in the application
area of packet scheduling in wireless communications networks where the tolerance for
computational delays is very low. The main contribution of this work is to investigate
the hypothesis that inserting a step of pre-sampling by Markov Chain Monte Carlo
methods before running the Simulated Annealing algorithm on the pruned search space
can result in overall reduced running times.
The search space is divided into a number of sections and Metropolis-Hastings Markov
Chain Monte Carlo is performed over the sections in order to reduce the search space for
Simulated Annealing by a factor of 20 to 100. Trade-o s are found between the run time
and number of sections of the pre-sampling algorithm, and the run time of Simulated
Annealing for minimising the percentage deviation of the nal result from the optimal
solution cost. Algorithm performance is determined both by computational complexity
and the quality of the solution (i.e. the percentage deviation from the optimal). We
nd that the running time can be reduced by a factor of 4.5 to ensure a 2% deviation
from the optimal, as compared to the basic Simulated Annealing algorithm on the full
search space. More importantly, we are able to reduce the complexity of nding the
optimal from O(n:n!) for a complete search to O(nNS) for Simulated Annealing to
O(n(NMr +NS)+m) for the input variables n jobs, NS SA iterations, NM Metropolis-
Hastings iterations, r inner samples and m sections.MT 201
Fuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flow Time through Genetic Algorithm
Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. One type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical model for appraising a multi-objective programing that minimize total weighted tardiness, earliness and total flowtime with fuzzy parameters on parallel machines, simultaneously with respect to the impact of machine deterioration. Besides, in this paper attempted to present a defuzzification approach and a heuristic method based on genetic algorithm (GA) to solve the proposed model. Finally, several dominant properties of optimal solutions are demonstrated in comparison with the results of a state-of-the-art commercial solver and the simulated annealing method that is followed by illustrating some instances for indicating validity and efficiency of the method
Efficient Heuristics for Scheduling Tasks on a Flo Shop Environment to Optimize Makespan
In modern manufacturing the trend is the development of Computer Integrated Manufacturing, CIM technologies which is a computerized integration of manufacturing activities (Design, Planning, Scheduling and Control) produces right products at right time to react quickly to the global competitive market demands. The productivity of CIM is highly depending upon the scheduling of Flexible Manufacturing System (FMS). Shorting the make span leads to decreasing machines idle time which results improvement in CIM productivity. Conventional methods of solving scheduling problems based on priority rules still result schedules, sometimes, with significant idle times. To optimize these, this paper model the problem of a flow shop scheduling with the objective of minimizing the makes pan. The work proposed here deal with the production planning problem of a flexible manufacturing system. This paper model the problem of a flow shop scheduling with the objective of minimizing the makes pan. The objective is to minimize the make span of batch-processing machines in a flow shop. The processing times and the sizes of the jobs are known and non-identical. The machines can process a batch as long as its capacity is not exceeded. The processing time of a batch is the longest processing time among all the jobs in that batch. The problem under study is NP-hard for makespan objective. Consequently, comparison based on Gupta’s heuristics, RA heuristic’s, Palmer’s heuristics, CDS heuristics are proposed in this work. Gantt chart was generated to verify the effectiveness of the proposed approaches
A survey of scheduling problems with setup times or costs
Author name used in this publication: C. T. NgAuthor name used in this publication: T. C. E. Cheng2007-2008 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe
- …