15,108 research outputs found

    Storage Device Sizing for a Hybrid Railway Traction System by Means of Bicausal Bond Graphs

    Get PDF
    In this paper, the application of bicausal bond graphs for system design in electrical engineering is emphasized. In particular, it is shown how this approach is very useful for model inversion and parameter dimensioning. To illustrate these issues, a hybrid railway traction device is considered as a case study. The synthesis of a storage device (a supercapacitor) included in this system is then discussed

    Model inversion of electrical engineering systems from bicausal bond graphs

    Get PDF
    In this paper, the application of bicausal bond graphs for model inversion of typical electrical engineering systems is emphasised. Inverse models are particularly useful for the synthesis step of the system design process. To illustrate these issues, a typical railway traction device and an Aeronautic Electro Hydrostatic Actuator are considered as case studies. From the requirements applied to the system outputs, we show how the synthesis of electrical constraints can be carried out from the inverse bicausal Bond Graph

    Optimization models of rail transportation under the financial crisis

    Get PDF
    This paper proposes an analysis of the most used models to optimize the rail transportation. Are presented a series of optimization models of labor efficiency in this sector, but also elements that gives the information on the competitiveness of this mode of transport.railway, railway optimization, optimization models for railway

    Estimating Workforce Development Needs for High-Speed Rail in California, Research Report 11-16

    Get PDF
    This study provides an assessment of the job creation and attendant education and training needs associated with the creation of the California High-Speed Rail (CHSR) network, scheduled to begin construction in September 2012. Given the high profile of national and state commitment to the project, a comprehensive analysis that discusses the education, training, and related needs created during the build out of the CHSR network is necessary. This needs assessment is achieved by means of: 1) analyzing current high-speed rail specific challenges pertaining to 220mph trains; 2) using a more accurate and robust “bottom-up” approach to estimate the labor, education, skills, and knowledge needed to complete the CHSR network; and 3) assessing the current capacity of railroad-specific training and education in the state of California and the nation. Through these analyses, the study identifies the magnitude and attributes of the workforce development needs and challenges that lie ahead for California. The results of this research offer new insight into the training and education levels likely to be needed for the emergent high-speed rail workforce, including which types of workers and professionals are needed over the life of the project (by project phase), and their anticipated educational level. Results indicates that although the education attained by the design engineers of the system signifies the most advanced levels of education in the workforce, this group is comparatively small over the life of the project. Secondly, this report identifies vast training needs for the construction workforce and higher education needs for a managerial construction workforce. Finally, the report identifies an extremely limited existing capacity for training and educating the high-speed rail workforce in both California and in the U.S. generally

    Reliability analysis of semi-automatic train door systems in service on today's rolling stock of the SNCB

    Get PDF
    This article analyses the reliability of semi-automatic train door systems that are in use on today’s rolling stock of the SNCB. For the analysis several databases of the SNCB concerning both operation and maintenance were thoroughly screened. These databases are briefly explained and scaling factors are applied to compare the performance of different series of rolling stock relative to each other. Conclusions are made out of the available data

    More than ore : modern Spanish steel, 1856-1936

    Get PDF
    Contrasting the iron law of the principle of comparative advantages as the determinant of the international division of labour has attracted dissidents to the international trade paradigm over the years. Spanish Bessemer steel is an outstanding comparative advantage enigma which stands to be resolved. Spain possessed important reserves apt for ore specific Bessemer processing. Depletion of existing deposits in industrial Europe and the increasing demand for this resource endowment made this all the more relevant. This paper examines if Spain could have or should have become one of Europe's major producers of Bessemer steel
    corecore